12
Gradually block off the intake. The CO2 should increase by a
maximum of 0.5 percentage points at the fully blocked condition. If not,
check that the VRV gate is pivoting freely and that the pivot rod is in a
horizontal position. Also, check that the counterweight has been
properly adjusted in accordance with the CAS-2B installation
instructions.
PART 4
INFORMATION
Model :
Serial number:
Date of installation of the furnace :
Service telephones - day :
Night :
Dealer’s name and address :
RESULT OF START-UP TEST
Nozzle:
Pressure :
lbpsi
Burner adjustments :
Primary air
Fine air
Draw Assembly
CO
2
:
% Smoke scale :
(Bacharach)
Gross stack temperature:
0
F
Ambiant temperature:
0
F
Chimney draft:
" C.E.
Overfire draft :
" C.E.
Test made by :
Содержание FLO115DABR-A
Страница 20: ...21 FIGURE 4 2 Wiring diagram MBOV115DABRU B MBOV115DBU C DNS 0593 Rev B ...
Страница 21: ...22 Wiring diagram FLO115DABR A OLF140C12A FIGURE 4 3 DNS 0658 Rev B ...
Страница 22: ...23 PART LIST Model MBO115DABR B DNS 0597 Rev E ...
Страница 24: ...25 PART LIST Model MBOV115DABR B DNS 0598 Rev D ...
Страница 26: ...27 PART LIST Models MBOV115DABRU B MBOV115DBU C DNS 0605 Rev D ...
Страница 28: ...29 PART LIST Model LBO125DABR13 B DNS 0585 Rev D ...
Страница 30: ...31 PART LIST Models LBO145DABR12 B LBO145DABR34 B OLR182A16A DNS 0586 Rev B ...
Страница 32: ...33 DNS 0663 Rev C Model FLO115DABR A OLF140C12A PART LIST ...