![Icotera 86071 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/icotera/86071/86071_installation-manual_3498447021.webp)
Installation of Icotera optical CPE and FTU
21
Icotera A/S, Kongevejen 400D, 2840 Holte, Denmark - [email protected]
Document version: 1.0
Appendix A: Other installation examples
Example 1: Blowing air pipe installation
In this example, raw fibres are blown through a pipe which enters the CPE directly from the wall. At the
termination point, this kind of pipe requires the gas sealing mechanism, which is provided by the gas
block connector.
Figure 32. The gateway FTU base with the blowing air pipe and gas block connector type 1 installed
–
note the 86018 model of the FTU
Figure 33. The gateway FTU base with the blowing air pipe and gas block connector type 2 installed2
–
note the 86018 model of the FTU
Example 2: WDM filter
The FTU base allows installation of a Wavelength Division Multiplexing filter. The example below
shows the WDM filter connected to a common fibre that enters the FTU through a blowing air pipe.
The filter, mounted in the holder in the bottom of the FTU, separates the CATV and data signals and
sends them through their corresponding fibres.