10
18. Attach a Pulley Housing (94) to the indicated “U”-
channel on the 10-pound Center Resistance Bar
(44) with an M10 x 102mm Button Head Bolt (24),
two Pivot Bushings (74), and an M10 Nylon
Locknut (76).
Wrap the Long Cable (80) around a 90mm Pulley
(28). Attach the Pulley inside of the Pulley
Housing (94) with an M10 x 42mm Button Head
Bolt (71) and an M10 Nylon Locknut (76).
18
24
94
28
80
44
76
76
71
74
74
17. Wrap the Long Cable (80) around a 90mm Pulley
(28). Attach the Pulley and a Pulley Guard (29) to
the indicated M10 x 140mm Carriage Bolt (73)
with an M10 Nylon Locknut (76).
Make sure the
flat edge of the Pulley Guard is on the side
shown.
17
76
28
80
73
29
Flat
Edge
16.
Locate the Long Cable (80).
Insert one end of
the Cable through the welded tube on the indicat-
ed end of the Cross Tube (11) and then through a
Swivel Arm (22). If necessary, use the tip of a
screwdriver to pull the end of the Cable out of the
Swivel Arm.
Make sure the Cable is on the indi-
cated side of the welded rod in the Swivel Arm.
Insert the Swivel Arm (22) into the welded tube
on the Cross Tube (11). Secure the Swivel Arm
with an M4 x 5mm Screw (107).
Wrap the Long Cable (80) around a 90mm Pulley
(28). Attach the Pulley inside of the Swivel Arm
(22) with an M10 x 42mm Button Head Bolt (71)
and an M10 Nylon Locknut (76).
16
71
22
107
28
80
11
76
Rod
“U”-Channel
15. Slide the Leg Developer (19) into the Bench Rail
(5). Align the hole in the Leg Developer with a
hole in the Front Leg (6). Tighten the Bench Knob
(42) into the hole in the Leg Developer.
Connect the eyebolt on the Leg Lever Cable (32)
to indicated side of the Leg Lever (7) with an M8
Nylon Locknut (65).
42
6
19
5
65
Eyebolt
7
32
15