9-50
FLIGHT CONTROLS / PITCH CONTROLS
ICON A5 / MAINTENANCE MANUAL
CHANGE C3
CH
APT
ER 9
FIGURE 9-36
CONTROL HORN HARDWARE INSTALLATION
17.
Place the digital protractor on top of the elevator and zero the digital protractor while the
elevator is in its neutral position, the trailing edge of the elevator should align with the HT tips.
18.
After setting the zero position of the elevator, lower the elevator into the -2° position.
19.
Adjust the rod end as necessary so that the rod end lines up with the elevator control horn while
the elevator is in the -2° position. This will be the initial adjustment. If necessary, final adjustments
will be made at a later step if required. See Figure 9-37.
FIGURE 9-37
ELEVATOR RIGGING
20.
Temporarily install the hardware which secures the elevator push rod to the elevator control
horn. See Figure 9-36.
21.
Using the digital protractor, check the maximum upward and downward deflection of the
elevator. If required, adjust the elevator push tube rod end as necessary to achieve the following:
a.
19° ± 1° upward deflection
b.
21° ± 2° downward deflection
Содержание A5
Страница 4: ...IV TABLE OF CONTENTS ICON A5 MAINTENANCE MANUAL ISSUE C3...
Страница 112: ...3 60 INSPECTIONS SYSTEM SPECIFIC INSPECTIONS ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 3...
Страница 126: ...4 14 STRUCTURES USE OF VHB TAPE FOR INSTALLATIONS AND REPAIRS ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 4...
Страница 137: ...ELECTRICAL SYSTEM ELECTRICAL SYSTEM WIRING DIAGRAMS 6 9 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 6...
Страница 138: ...6 10 ELECTRICAL SYSTEM ELECTRICAL SYSTEM WIRING DIAGRAMS ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 6...
Страница 139: ...ELECTRICAL SYSTEM ELECTRICAL SYSTEM WIRING DIAGRAMS 6 11 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 6...
Страница 141: ...ELECTRICAL SYSTEM ELECTRICAL SYSTEM WIRING DIAGRAMS 6 13 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 6...
Страница 151: ...ELECTRICAL SYSTEM ELECTRICAL SYSTEM WIRING DIAGRAMS 6 23 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 6...
Страница 152: ...6 24 ELECTRICAL SYSTEM ELECTRICAL SYSTEM WIRING DIAGRAMS ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 6...
Страница 156: ...6 28 ELECTRICAL SYSTEM ELECTRICAL SYSTEM WIRING DIAGRAMS ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 6...
Страница 342: ...9 106 FLIGHT CONTROLS YAW CONTROLS ICON A5 MAINTENANCE MANUAL CHANGE C3 CHAPTER 9...
Страница 398: ...11 20 FUSELAGE AND VERTICAL TAIL WATER RUDDER ICON A5 MAINTENANCE MANUAL CHANGE C1 CHAPTER 11...
Страница 420: ...12 22 HORIZONTAL TAIL HORIZONTAL TAIL TIP PIN ICON A5 MAINTENANCE MANUAL CHANGE C1 CHAPTER 12...
Страница 425: ...INSTRUMENTS AND AVIONICS TROUBLESHOOTING 13 5 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 13 2 Left Crossbeam...
Страница 508: ...13 88 INSTRUMENTS AND AVIONICS PITOT STATIC ANGLE OF ATTACK AOA SYSTEM ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 13...
Страница 512: ...14 4 LANDING GEAR DIAGRAM SCHEMATIC ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 14 14 2 Diagram Schematic...
Страница 608: ...14 100 LANDING GEAR AFT NOSE LANDING GEAR DOOR ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 14...
Страница 624: ...15 16 PLACARDS AND MARKINGS PLACARDS AND MARKINGS GENERAL MAINTENANCE ICON A5 MAINTENANCE MANUAL CHANGE C1 CHAPTER 15...
Страница 627: ...PROPULSION 16 3 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 16 Install Spinner Dome 16 106...
Страница 658: ...16 34 PROPULSION ENGINE ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 16 FIGURE 16 20...
Страница 659: ...PROPULSION ENGINE 16 35 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 16 THROTTLE ASSEMBLY...
Страница 732: ...16 108 PROPULSION PROPELLER ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 16...
Страница 788: ...19 4 ICON PARACHUTE SYSTEM IPS DIAGRAM SCHEMATIC ICON A5 MAINTENANCE MANUAL CHANGE C1 CHAPTER 19 19 2 Diagram Schematic...
Страница 822: ...19 38 ICON PARACHUTE SYSTEM IPS ACTIVATION SYSTEM ICON A5 MAINTENANCE MANUAL CHANGE C1 CHAPTER 19...