background image

 
 
 
 

    
   ICMA s.p.a.  via Garavaglia, 4   20012 Cuggiono (MI) – ITALY   -  Tel. +39 02 97249134  /  +39 02 97249135  Fax +39 02 97241550 

                          

                      www.icmaspa.it                       e-mail: 

[email protected]

                                           pag. 

4

 

 

START-UP 

 

1.

 

Close the filling/emptying tap on the flow controller (6 in Tab.1) and increase the system’s pressure up to the maximum 
permitted value. Close the tap when this value is reached. 

2.

 

Open the valve on the on/off assembly (4, 7 in Tab.1) and operate the pump (5 in Tab.1). 

3.

 

Leave it to circulate for a certain amount of time, and then check the hydraulic seals in the system. 

4.

 

Open the air bleed valves A (Fig.1) again, removing air from the system again by turning on the circulation pump briefly. 

5.

 

Restore the desired air pressure. 

6.

 

The rate of flow of the system may be modified using the flow controller (6 in Tab.1), working the ball valve above the 
graduated scale (refer to flow meter description). In order to do this the pump must be set to maximum power. Follow the 
solar panel manufacturer's instructions to adjust or limit the rate of flow. 

7.

 

After a few hours of operation, remove air from the solar energy system again at the highest point in the system A (Fig.1) 
and in the air separator (8 in Tab.1). When you have finished bleeding air, check the pressure in the system and restore the 
desired operating pressure if necessary. 

 
 

EMPTYING THE SYSTEM 

 

The system must be emptied if it has been filled with water only and will be exposed to a risk of freezing. 
1.

 

Open the on/off and check valves by turning the thermometer holder to 45° (4, 7 in Tab.1). 

2.

 

Open the air bleed devices at the highest point A (Fig.1). 

3.

 

Open the emptying tap at the lowest point in the system (3 in Tab.1). 

 
 

 INSTALLATION AND WALL MOUNTING 

 
The fixing of the delivery part (A) and return part (B) to the insulation shell (C) is made in the factory by two screws M8x35mm 
and two washers (D).  
The supporting plate (E) and the dowels for the wall fixing (F) are optional.  
 
To install the solar module please proceed as follows: 
1.

 

Lay the pipes inside the solar system, leaving enough space for the solar module as shown in Table N.2 (page 2). 

2.

 

Define the positioning of the module on the wall and mark the position of the 4 holes for the fixing (F).    

3.

 

Drill the wall and insert the dowels (dowels are not included). 

4.

 

Fix the solar module to the wall and connect it to the system pipes. 

5.

 

Check that all unions are properly tight. 

6.

 

Proceed with the electrical wiring. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Fig.2 

Fig.3 

C

D

E

G

F

Содержание S001

Страница 1: ...95 C 0 3 bar 110 C 1 bar Min pressure for opening on off and check valve p 2Kpa 200 mm c a Safety valve Calibration of safety valve 6 bar Safety valve temperature range 30 160 C Connections of safety...

Страница 2: ...urn connection with Anti gravity non return valve 5 Wilo Solar ST20 6 o Grundfos Solar 15 65 circulation pump 6 Flow controller with on off valve return connection 7 On off valve with built in thermom...

Страница 3: ...4 08 about art S301 and S302 FILLING THE SYSTEM 1 Open the on off valve connected with the air bleed valve A Fig 1 located at the highest point of the system 2 Open the on off and check valves turning...

Страница 4: ...point in the system A Fig 1 and in the air separator 8 in Tab 1 When you have finished bleeding air check the pressure in the system and restore the desired operating pressure if necessary EMPTYING TH...

Страница 5: ...ng the rate of flow of fluid circulating in the system The flow meter has a rate of flow limiter which may be adjusted manually with a screwdriver Fig 4 A rate of flow indicator present inside the mea...

Страница 6: ...ses are separated from the head conveying fluid and accumulate in the upper part of the deaerator During start up accumulated gases must be evacuated periodically during the day using the manual air b...

Страница 7: ...rised personnel familiar with the instructions contained herein Make sure the system is shut down before performing any work on it ELECTRICAL CONNECTIONS Electrical connections must be made by qualifi...

Страница 8: ...ICMA s p a via Garavaglia 4 20012 Cuggiono MI ITALY Tel 39 02 97249134 39 02 97249135 Fax 39 02 97241550 www icmaspa it e mail sales icmaspa it pag 8...

Отзывы: