![background image](http://html.mh-extra.com/html/ici/8000-series/8000-series_user-manual_610661019.webp)
8000 SERIES IR CAMERA USER MANUAL
19
Site:
_______________________________
System:
___________________________
Contact Person:
__________________
Date:
______________________________
**All those tasked with the initial setup of the temperature screening equipment must be
present during this training.
***This portion of the validation requires a live video feed with the instructors.
10-1 The Screening Area
□
Ensure that this area is free from:
•
Any direct or indirect (reflected) sunlight
•
Warm or cold conductive airflow
◦
HVAC vents/intakes
•
Any radiant energy from electrical sources
•
Direct or indirect lighting on individual being screened
□
Room temperature is 20 °C - 24 °C (68 °F - 75.2 °F)
□
Relative humidity is within 10% – 50%
10-2 The Screening Background
□
Placement is parallel and perpendicular to screening camera
•
At a distance of ~12 ft.
□
Consists of a non-IR reflective homogeneous background
•
Minimum size is 10’ x 8’
•
White to gray flat finish
10-3 The Traffic Flow
□
Establish a guided pathway from the entrance to the screening area
□
Design this pathway so there is an equilibration time
□
No restrooms on ingress pathway
□
Signage should instruct for removal of glasses, headwear, and masks
□
Mark the point of measurement on the floor (“V/X” or a set of footprints)
□
The distance is unique to each screening system
□
Ensure the line of sight from the person being screened to the camera is never blocked
by another individual entering or leaving the point of measurement
□
The secondary screening area should be setup near the screening area
10.
Site and System Setup Validation Checklist
Continues