Installation
18
2
Installation
INSTALLATION ROOM
Heating plant room
The user is responsible for ensuring that the heating plant room is designed in compliance with the prevailing rules on the matter
in the country of use.
The user is responsible for ensuring that the heating plant room is designed in compliance with the prevailing rules
on the matter in the country of use.
Positioning
Our generators must be positioned on a horizontal base that can bear the weight of the boiler when full of water, in case the
hydraulic test is carried out on site.
Hydraulic connections
Once positioned, the steam generating systems must be connected to the system in the following points:
Water
From the condensate tank (10) (if present, otherwise purified water tank) to the supply pump suction (9).
Steam
From steam main outlet valve (3) to the users (distribution header or others), from the safety valve outlet (6) outside the room in
safety position.
Drains
From the level indicator drain and cylinder (16) and from the boiler drain (17) to the drain line.
Fuel
Connection to burner preset for Light oil or methane gas/LPG.
Compressed air
The air pressure must be between 4 and 10 bar.
Important: the air must be filtered with a 25 μm mesh.
1
Generator
2
Chimney
3
Steam outlet
4
Burner
5
Instruments
6
Safety valve
7
Condensate return
8
Supply
9
Supply pump
10
Condensate collection tank
11
Water level
12
Water softener
13
Water mains
14
Overflow/bleed fitting
15
Condensate tank drain
16
Level indicator drain and cylinder
17
Boiler drain
18
Safety valve drain
19
Maximum level probe
20
Minimum level probe
21
Water inlet
22
Pre heating steam inlet (optional kit)
23
Solenoid valve (optional kit)
24
Thermostat (optional kit)
25
Loading start probe
26
Pump bleed valve
Cooke Industries - Phone: +64 9 579 2185 Email: [email protected] Web: www.cookeindustries.co.nz