18
Installation method
■ Electrical connection ■
1. Supply AC 1Ø 220/230V electricity to an
additional power distribution box with an
earth leakage circuit breaker of a capacity
of more than 30 A is individually installed.
3. Connect the 4.0 ㎟ cable at the bottom of the control box to the terminal block.
1) Floor space
when you have
2) Floor space
when there is no.
(The installation of
more than a set.)
※ Maintain space of 50cm or more each between the walls and the right and rear sides
20cm or more between the left of the system.
2. Remove the front panel at the bottom front
and remove the control box cover.
Electrical connections should be performed by an electrical technician to make sure
that each wire is correctly connected. If the connection is wrong, it can cause explosions
or ignition of the PCB in the product and electrical shocks or fires.
For your
information
L
N
G
Содержание ISI-163SB
Страница 3: ...3 Cautions for your safety...
Страница 4: ...4 30...
Страница 5: ...5...
Страница 21: ...21 Circuit diagram...
Страница 24: ...24 Part list MOVE PART...
Страница 25: ...25 Part list DASHER ASSY...
Страница 26: ...26 Part list COMPRESSOR AND CONDENSER...
Страница 27: ...27 Part list FRONT COVER ASS Y SIDE BACK PANEL ASS Y...
Страница 30: ...MEMO 30...
Страница 31: ...MEMO 31...
Страница 32: ...3240350 00 Online Internet Service http www icetro com...