![icetro IM-770-AF Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/icetro/im-770-af/im-770-af_installation-and-service-manual_610596008.webp)
IM-0770
Sequence Of Operation
8
IM-0770-AN/AF Sequence of Operation
Start-Up Sequence
Power switch set to the “ICE” position:
•
Gear motor, inlet water valve, and bypass valve is energized simultaneously.
•
Bypass valve stays energized for 50 seconds.
•
Bypass valve is de-energizes for 10 seconds.
•
Compressor energizes and freeze cycle begins.
•
Once the head pressure reaches 235 psig, the fan cycle switch closes and the fan motor energizes.
Shut-Down Sequence
Power switch set to the “OFF” position while in freeze:
•
Compressor is de-energizes immediately.
•
Head pressure drops to 175 psig & the fan cycle switch opens, de-energizing the fan motor.
•
Gear motor de-
energizes 1 minutes after the power switch is put in the “OFF” position.
Note: Sump remains full of water. Dump valve does not energize and drain, so the
sump remains full of water when the machine is off.
Shut-Down Sequence Via Bin Switch
Same as the previous shut-down sequence:
•
When the bin-switch is made or broken, the machine starts or stops with nearly no delay (2 seconds max).
Purge Cycle (set for every 12 hours)
Total Cycle Time = 20 minutes:
•
Compressor is de-energized. Dump valve energizes (emptying sump) and the gear motor remains energized.
•
Approximately 5 minutes in, the gear motor is de-energized & the inlet water valve is energized, refilling the
sump and flooding the evaporator with water.
•
19 minutes in, the dump valve is energized (draining all water).
•
19.5 minutes in, the inlet water valve & gear motor is energized.
•
20 minutes in, the compressor is energized.
•
When head pressure reaches 230 psig, the fan motor is energized
Note: The machine drains & refills 2 times, not continuously.
Содержание IM-770-AF
Страница 1: ...IM 770 AN F INSTALL SERVICE MANUAL ...
Страница 2: ...Ice Machine Specs 2 ...
Страница 3: ...Ice Machine Specs 3 ...
Страница 9: ...IM 0770 LED Functions 9 ...
Страница 11: ...11 IM 0770 Drop Zone IM 0770 AN AF Drop Zone Chart A 11 3 B 11 4 C 22 D 25 4 A B C D Ice Outlet is 5 4 ID ...
Страница 12: ...IM 0770 Wiring Diagram 12 ...
Страница 21: ...IM 0770 P T Chart Cycle Times 21 ...
Страница 22: ...IM 0770 Parts Breakout 22 ...
Страница 23: ...23 IM 0770 Parts Breakout ...
Страница 24: ...24 IM 0770 Parts Breakout ...
Страница 25: ...25 IM 0770 Parts Breakout ...
Страница 26: ...26 IM 0770 Parts Breakout ...
Страница 27: ...IM 0770 Parts Breakout 27 ...
Страница 28: ...IM 0770 Parts Breakout 28 ...
Страница 29: ...IM 0770 Parts Breakout 29 ...
Страница 36: ...THANK YOU 1 15 2022 ...