18
9.
Check to make sure that the machine is in the normal
operating position (the emergency stop button is pulled
out).
10. Turn the machine ON (press the ON/OFF button).
11. Lift the lock pin and activate the trigger on the blasting
gun for a few seconds to allow air to flow through the
system. This checks for moisture in the airstream
and proper operation of the dosing disc, vibrator, and
regulator.
12. Fill dry ice pellets into the hopper (this can be done
while the machine is in operation).
Please note:
It is recommended that you run
the hopper empty before each filling to enable
the operator to see whether “snow” or lumps
appear in the dry ice. These can prevent a
continuous supply of dry ice to the dosing unit.
Never leave the machine with the lid open.
Содержание Evolution Line Xtreme 40
Страница 1: ...Xtreme 40 Elite 20 Manual Original Instructions Revised December 2018...
Страница 32: ......
Страница 33: ...33...
Страница 34: ......