iceqube EX series Скачать руководство пользователя страница 10

 

10 

 

 

 

Rev. 1 

Operating Your System 

 

Once the Ice Qube TMS has been installed onto the enclosure and the power cable has been attached to a 
properly grounded electrical connection with adequate voltage and current supply, the unit is ready for 
operation. As soon as electrical power is supplied to the Ice Qube TMS, the air conditioner will begin to 
operate. 
 
On the rear or enclosure side of the cooling system is the thermostat. The thermostat is responsible for 
control and operation of the vapor-compression refrigeration system and air movers. When power is 
supplied to the system, the cooling system will begin to operate if the temperature is at or above the set 
point of the thermostat. At this set point temperature, the cold and warm air movers, along with the 
compressor will begin operation. As the temperature inside the enclosure cools to the thermostat off 
temperature, the thermostat will signal the compressor and air movers to stop operation.

 

 

Thermostat Operation 

The purpose of the thermostat (T675A) is to cycle on and off the cooling system as required from the 
heat produced by the equipment within the enclosure to prevent heat fatigue thus extending the life of 
the electronic equipment. The thermostat is located on the enclosure side of the air conditioner below 
the warm air return. The thermostat temperature sensing bulb is located in the warm stream of air 
returning to the air conditioner from the enclosure. 
 
On the face of the thermostat, you will see an adjustment knob within a temperature range of -15 to 
35°C (5 to 95°F). To adjust the operating temperature of the thermostat, gently turn the knob until the 
pointer is aligned with the desired temperature of the enclosure. This is the temperature at which the 
cooling system will begin cooling. 
 
The thermostat has a factory set differential of 2.8°C (5°F). The unit will stop cooling when the 
enclosure temperature is 2.8°C (5°F) below the cooling on setting, indicated by the pointer. The unit will 
automatically begin to cool again when the internal temperature of the enclosure reaches the cooling on 
set point. 
 
Ex: 

Set Point  

25º C (77º F)  

Cooling on temperature 

22.2º C (72º F)   Cooling off temperature 

 

 

 

Содержание EX series

Страница 1: ...TION MANUAL IMPORTANT PLEASE READ this manual and follow the instructions for safe and satisfactory installation and operation of this system Keep this manual for future reference Some information may...

Страница 2: ...on 7 Electrical Installation Instruction 8 Operating Your System 10 Thermostat Operation 10 Service and Maintenance Instruction 11 Trouble Shooting 12 Schematic Wiring Diagrams 14 Specification Drawin...

Страница 3: ...within the enclosure The three main thermal related systems that we employ are the closed loop cold air supply stream the heat rejection air stream and the vapor compression refrigeration system The...

Страница 4: ...ng container The unit must remain upright for a minimum of 24 hours before initial operation to ensure oil has returned to the compressor Operation before the 24 hour time may cause compressor damage...

Страница 5: ...struction for wiring details Page 8 Note If any unusual noise or vibration is present during the testing procedure immediately disconnect the power and inspect the exterior of the unit for the cause o...

Страница 6: ...e TMS Refer to individual specification drawings for model weights 2 Using the specification drawing determine the ideal location to install the Ice Qube TMS on your enclosure 3 Upon deciding the inst...

Страница 7: ...y seal the Ice Qube TMS to your enclosure 4 Using a wrench tighten the nuts and bolts until the gasket between the air conditioner and the enclosure is compressed to a maximum thickness of 1 8 3 175mm...

Страница 8: ...Locate customer interface electrical junction box on enclosure side of air conditioner See Figure 3 Customer Interface pg 9 3 Remove the 4 terminal box cover screws and remove the cover See Figure 2 C...

Страница 9: ...9 Rev 1 Figure 2 Customer Wiring Figure 3 Customer Interface...

Страница 10: ...se of the thermostat T675A is to cycle on and off the cooling system as required from the heat produced by the equipment within the enclosure to prevent heat fatigue thus extending the life of the ele...

Страница 11: ...trapped by the filter Dry type of debris may typically be removed with the use of compressed air blowing in the opposite direction of the air movement through the filter as when the filter is install...

Страница 12: ...DO NOT remove the cover without first notifying customer service Removal of the cover will immediately void the warranty If an operating problem should occur please review the items outlined on the fo...

Страница 13: ...he compressor and condenser warm air stream blower operating Yes No Is the enclosure door closed tightly Yes No Are all of the gaskets in place Yes No Has the condenser warm air stream filter been cle...

Страница 14: ...14 Rev 1 Schematic Wiring Diagrams Figure 4...

Страница 15: ...15 Specification Drawing IQ4000EX Figure 5...

Страница 16: ...16 Rev 1 IQ5000EX Figure 6...

Страница 17: ...17 Rev 1 IQ6000EX Figure 7...

Страница 18: ...18 Rev 1 IQ8000EX Figure 8...

Страница 19: ...19 Rev 1 IQ10000EX Figure 9...

Страница 20: ...20 Rev 1 IQ12000EX Figure 10...

Страница 21: ...21 Rev 1 IQ4 5 6000EX Gasket and Cutout Same Gasket and Cutout for IQ4000EX IQ5000EX and IQ6000EX Figure 11...

Страница 22: ...22 Rev 1 IQ8 10 12000EX Gasket and Cutout Same Gasket and Cutout for IQ8000EX IQ10000EX and IQ12000EX Figure 12...

Страница 23: ...ility or any other theory of liability will be limited to the lesser of customer s actual damages or the price paid by customer to Ice Qube for the Products not including applicable taxes duties and f...

Страница 24: ...be deemed to be non binding Such advice does not relieve customer from the obligation and customer accepts full responsibility to confirm for itself the suitability of the Products for their intended...

Страница 25: ...25 Rev 1 Notes...

Отзывы: