background image

GB

11

and non-condensables after compressor replacement.

Before proceeding with the refrigerant charge check

nameplate for specific refrigeration charge for individ-

ual cuber.

C) AIR COOLED CONDENSER REPLACEMENT

Remove the rear panel grid on N25S, N25L and N35S

models. On N45S÷N140 and upper models remove

the front panel grid and the side panels.

Remove the screws which attach the condenser to the

unit base.

Bleed off or blow the refrigerant from the system.

Unsolder the refrigerant lines from condenser and

remove it from the unit.

Install the replacement condenser following previous

steps in reverse.

Thoroughly evacuate the system to remove moisture

and non condensables; then proceed with the charge

of FREON R134a.

D) DRIER REPLACEMENT

Remove the rear panel grid on N25S, N25L and N35S

Models. On N45S÷N140 models remove the side

panel grids.

Bleed off or blow the refrigerant charge through the

Henrytype valve.

Unsolder the capillary tube from one end of the drier

and the refrigerant line from the other end.

To install a replacement drier remove factory seals.

Thoroughly evacuate the refrigerant system.

Charge the system with refrigerant by weight (see

nameplate) and check for leaks.

E) FAN MOTOR REPLACEMENT

Remove the rear panel grid on N25S, N25L and N35S

models. On N45S÷N140 models remove the side

panel grids.

Trace the electric wire leads of fan motor and discon-

nect the same.

Remove the bolts securing the fan motor assembly to

the cabinet base and the remove the assembly.

Install the replacement fan motor following previous

steps in reverse anc check that the fan blade do not

touch  any sourface and move freely.

F) EVAPORATOR ASSEMBLY REPLACEMENT
a. Remove the top cover.

b. Remove six screws securing the paddle shaft supports

(two) and the paddle motor support; then remove the
paddle motor/paddle shaft/supports assembly.

c. Remove the bolts securing the evaporator supports

(two) to the cabinet.

d. Sideways remove the evaporator supports.

e. Unsolder the capillary tube, the hot gas solenoid valve

tube and the suction line.

f. To install the replacement evaporator assembly follow

previous steps in reverse.

g. Install the replacement drier; thoroughly evacuate the

system and proceed with the refrigerant charge.

G) WATER RESERVOIR/TILTING LEVER/SUPPORT
ASSEMBLY REPLACEMENT
a. Remove screws and top cover.

b. Remove the gear motor/paddle shaft/support assem-

bly.

c. Remove the screws securing the evaporator supports

(two).

d. Sideways remove one evaporator support support as

well as one reservoir gudgeon support.

e. Slightly lift the evaporator and remove the water reser-

voir assembly.

f. To install the replacement water reservoir assembly

follow previous steps in reserve.

H) WATER INLET ELECTROVALVE REPLACEMENT
a.  Remove the rear panel.

b. Check that water supply is closed.

c. Disconnect the water supply connection pipe from the

valve and that of the electrovalve from the reservoir.

d. Break contact from the electrovalve and remove the

screws (two) securing the electrovalve to the relevant
frame.

e. To install the replacement electrovalve follow previous

steps in reverse; before installing the water supply pipe
check that the gasket is not defective.

I. PADDLE MOTOR REPLACEMENT

a. Remove the top cover.

b. Remove six screws securing the paddle shaft supports

(two) and the paddle motor support.

Содержание N25S

Страница 1: ...BE MACHINES Cod 71503026 0 GB 01 2006 Rev 002 ISO 9001 Cert N 0412 2 OUR SYSTEMS COMPLY WITH EEC DIRECTIVE 73 23 89 336 CEE R 134a N25S N25L N35S N45S N45L N50BI N55S N55L N70S N90S N90L N140 Air and...

Страница 2: ......

Страница 3: ...l connections 4 Final check 4 OPERATION Operating instructions 5 Ice forming cycle 5 Electrical and refrigeration systems 6 Machine main parts descriptions 7 Trouble shooting 8 MAINTENANCE Periodical...

Страница 4: ...severe damage noted should be reported to the delivering carrier and a concealed damage claim from filled in subjetto inspection of the contents with the car rier s representative present 3 a Cut and...

Страница 5: ...meter of 20 mm and adequate lenght to reach and open vented drain to the waste pipe fitting In the water cooled machine it must also be conected to the second pipe fitting that conveys water coming fr...

Страница 6: ...has been wiped clean e Give the Operationg instructions manual to the owner user and recommend him on the importance to observe the instructions and period maintenance f Properly fill in the certific...

Страница 7: ...ease it is less sensitive and therefore the icemaker continues to operate even if the storage bin is full Access to the thermostat is gained by removing the top of the wiring case tighten clockwise th...

Страница 8: ...Therefore almways check nameplate for electrical infor mation before proceeding with electrical wiring connec tions to the ice cubers The rifregerant expansion system on the cube machines is the capil...

Страница 9: ...cycle the hot gas valve coil is activated so to attract the hot gas dis charged from compressor to flow directly into the evapo rator serpentine to defrost the formed ice cubes L FAN MOTOR Air cooled...

Страница 10: ...evaporator h Partial restriction in the capillary tube Detective pressure switch a Low voltage b Dirty condenser Check the electricity supply replace fuse if necessary and ckeck for cause Check wirin...

Страница 11: ...ter tight a Incorrect position of revolving paddles b Unit is not properly levelled a Impure water b Calcareous water a Detective water seal Move unit to cooler location Purge off Replace electrical c...

Страница 12: ...r to tilt the pan rinse with clean water in abudance and repeat cleaning three times e Add hot water to the ice storage bin and thoroughly wash and rinse all surfaces within the bin f Clean and saniti...

Страница 13: ...in reverse anc check that the fan blade do not touch any sourface and move freely F EVAPORATOR ASSEMBLY REPLACEMENT a Remove the top cover b Remove six screws securing the paddle shaft supports two an...

Страница 14: ...the relative support f Install the replacement harvest motor on the support and apply the cam make a 3 mm hole on the motor shaft and to do it take as a guide the hole already exist ing on the cam g T...

Страница 15: ...CTROLUX GL90TB 220 50HZ 220 3 6A 2A 9 6 9 14 7 8 35 17g 30 N55S A 134A UNITE HERMETIQUE CAE4448Y 220 50HZ 360 3 6A 3A 12 5 6 9 16 12 35 17g 7 N55S W 134A UNITE HERMETIQUE CAE4448Y 220 50HZ 360 3 6A 2...

Страница 16: ...GB 14 WIRING DIAGRAMS N25S AIR...

Страница 17: ...GB 15 N25L N35S AIR...

Страница 18: ...GB 16 N25S N25L N35S WATER...

Страница 19: ...GB 17 N45S N45L N55S N55L N70S N90S N90L AIR...

Страница 20: ...GB 18 N45S N45L N55S N55L AIR...

Страница 21: ...GB 19 N50 B I AIR...

Страница 22: ...GB 20 N50 B I WATER...

Страница 23: ...GB 21 N70S N90S N90L WATER...

Страница 24: ...Via del Lavoro 9 C P 172 I 31033 Castelfranco Veneto TV Italy Tel 0423 738452 Fax 0423 722811 E mail icematic castelmac it Web site www castelmac it Cod 71503026 0 GB 01 2006 Rev 002...

Отзывы: