FIGURE 32

UPFLOW OPPOSITE SIDE CONDENSATE TRAP CONNECTION

REVERSING THE TRAP

UPFLOW UNITS

The trap may be moved to the right
side for right side drainage. Open the
knockout for the drain on the right
side of the cabinet. Remove the
bracket holding the trap from the left
side. Seal the left side drain hole with
a plug provided in the cloth bag with
the furnace. Position the mounting
bracket and trap so that the drain
elbow is centered in the hole on
the right. See Figure 32.

Drill two holes in the cabinet to mount
the bracket. Mount the trap and
bracket to the right side with the drain
elbow pointing through the knockout.
Connect the 

1

/

2

-in. pipe and tee as

noted above. Route the drain hoses
behind the control box, cut to the
appropriate length, and connect to the
trap with hose clamps.

IMPORTANT:

DO NOT ALLOW ANY

SAGS OR KINKS IN THE HOSES.
This prevents proper condensate
flow.

IMPORTANT:

Do not connect into

a common drain line with an air
conditioner evaporator coil drain
located above the furnace. A blocked
or restricted drain line can result in
overflow of the coil pan and negate
the furnace blocked drain shutoff
control.

DOWNFLOW UNITS

To convert to left side drainage, first
remove the drainage hoses from the
trap. Remove the trap from its
mounting bracket, rotate it 180°, and
mount in place with the drainage
elbow pointing to the left. Reattach
the drain hoses. Remove the plastic
drainage knockout from the left side.
See Figure 33.

IMPORTANT:

When changing to the

left side, interchange the rubber
bushing on the right side with the hole
plug on the left side. The hole plug
must be in place to assure that the
control compartment is sealed.

As of September 2, 2006, to convert
downflow models to left-hand drain, a
kit (RXGY-H01) must be ordered from
the distributor. The kit includes a 24”
piece of 

1

2

” black PVC pipe, a 2”

rubber grommet, a 1-5/8” plug and
instructions. Note the location of the
alternate drain hole as shown in
Figure 33.

To convert to left side drainage, first
remove the drainage hoses from the
trap. Remove the trap from its
mounting bracket, rotate it 180
degrees and mount in place with the
drainage elbow pointing to the left.
Reattach the drain hoses.

Remove the plug from the 2” alternate
drain hole (see Figure 33) and
replace it with the 2” rubber grommet
supplied in the RXGY- H01 downflow
alternate drain kit. Also, remove the
1-5/8” grommet supplied in the
primary drain hole and replace it with
the 1-5/8” diameter plug that is also
supplied in the RXGY-H01 downflow
alternate drain kit. Both the hole-plug
and grommet must be in place to
insure a good seal in the burner
compartment.

A length of 

1

/

2

” black PVC pipe is also

provided in the RXGY-H01 downflow
alternate drain kit. Glue one end of
the pipe to the elbow in the trap. Cut
the pipe so that it extends through the
alternate drain hole in the left side of
the cabinet one inch (see Figure 33).
Connect the

1

/

2

” PVC tee (supplied

with the furnace) to the pipe with a 1-
3/4” riser. Use the 1-5/8” plug
supplied in the RXGY-H01 downflow
alternate drain kit to seal the right side
drainage hole.

CUT DRAIN HOSES AS
REQUIRED
AND CONNECT TO
INLETS ON TOP
OF CONDENSATE
TRAP

DRAIN
RISER

TEE

DRAIN
EXTENSION

PROPER DRAIN SLOPE REQUIRED

(NO KINKS ALLOWED)

CONDENSATE TRAP

IFC MOUNTING

PLATE

TO FLOOR

DRAIN

IMPORTANT: 

Do not connect into a

common drain line with an air
conditioner evaporator coil drain
located above the furnace. A blocked
or restricted drain line can result in
overflow of the coil pan and negate
the furnace blocked-drain shutoff
control. 

FILLING THE TRAP

FILL THE TRAP ASSEMBLY WITH
WATER BEFORE OPERATING THE
FURNACE. 

Do this by removing the

drain hose from the trap or from the
connection to the secondary coil.
Pour about a cup of water into the
vent trap. Any excess water flows into
the house drain when the trap is full.

I394

FIGURE 33

DOWNFLOW OPPOSITE SIDE CONDENSATE TRAP CONNECTION

TEE

DRAIN

EXTENSION

DRAIN VENT

CONDENSATE TRAP

TO FLOOR
DRAIN OR

CONDENSATE PUMP

ALTERNATE DRAIN HOLE
LOCATED HERE ON JACKET.
(REMOVE PLASTIC PLUG AND
REPLACE WITH GROMMET).

EXISTING DRAIN HOLE. PLUG
WITH 1

5

8

” PLUG SUPPLIED

IN KIT

ROTATE TRAP 180° AND
INSTALL RIGID PIPE FROM
ELBOW TO OPPSOITE SIDE
OF JACKET AS SHOWN

I394

Содержание 90RJ Series

Страница 1: ...NTAL HIGH EFFICIENCY CONDENSING GAS FURNACES 90RJ AND 90TJ SERIES U L recognized fuel gas and CO carbon monoxide detectors are recommended in all applications and their installation should be in accor...

Страница 2: ...diameter exhaust pipe ft of pipe intake air no of elbows intake air ft of pipe exhaust pipe no of elbows exhaust pipe Exhaust vent temp TERMINATIONS DIRECT VENT VERTICAL Intake 12 min above roof snow...

Страница 3: ...own to the State of California to cause cancer or birth defects such as fiberglass insulation lead in brass and combustion products from natural gas All new equipment shipped for sale in California wi...

Страница 4: ...B149 is available from CSA INTERNATIONAL 178 Rexdale Blvd Toronto Ontario Canada M9W 1R3 GENERAL INFORMATION FIGURE 1 UPFLOW FURNACE FIGURE 2 DOWNFLOW HORIZONTAL FURNACE ITEM ITEM NO PART NAME NO PART...

Страница 5: ...TION RETURN AIR TEMPERATURE MAINTAINED BETWEEN 55 F 13 C AND 80 F 27 C AND CLEAN FURNACE DUCT WORK AND COMPONENTS UPON SUBSTANTIAL COMPLETION OF THE CONSTRUCTION PROCESS AND VERIFY FURNACE OPERATING C...

Страница 6: ...TER HEATERS OR BOILERS ALL JOINTS SEAMS AND OPENINGS IN THE EQUIPMENT AND DUCT MUST ALSO BE SEALED TO PREVENT DEPRESSURIZATION OF THE SPACE AND POSSIBLE MIGRATION OF COMBUSTION BYPRODUCTS INCLUDING CA...

Страница 7: ...DIRT DUST FUMES AND ODORS INTO THE HOME CAUSING PROPERTY DAMAGE FUMES AND ODORS FROM TOXIC VOLATILE OR FLAMMABLE CHEMICALS AS WELL AS AUTOMOBILE EXHAUST AND CARBON MONOXIDE CO CAN BE DRAWN INTO THE L...

Страница 8: ...rator coil with this furnace a be sure the air passes over the heat exchanger before passing over the cooling coil The cooled air passing over the warm ambient air inside the heat exchanger tubes can...

Страница 9: ...or crawl space installation it may be installed on combustible wood flooring or by using support brackets See Figure 5 5 IMPORTANT If installing in a utility room be sure the door is wide enough to a...

Страница 10: ...32 15 5 8 2 15 13 25 32 0 0 0 1 2 0 117 07 17 1 2 16 11 32 15 5 8 2 15 13 25 32 0 0 0 1 2 0 123 09 21 19 27 32 19 1 8 2 18 1 2 17 9 32 0 0 0 1 2 0 148 10 21 19 27 32 19 1 8 2 18 1 2 17 9 32 0 0 0 1 2...

Страница 11: ...0 117 07 17 1 2 16 11 32 15 5 8 2 16 5 8 13 7 8 0 0 0 1 2 0 123 09 21 19 11 32 19 3 16 2 20 1 8 17 3 8 0 0 0 1 2 0 148 10 21 19 11 32 19 3 16 2 20 1 8 17 3 8 0 0 0 1 2 0 152 12 24 1 2 23 11 32 22 5 8...

Страница 12: ...2 16 5 8 13 7 8 0 0 0 1 2 0 123 07 21 19 27 32 19 3 16 2 20 1 8 17 3 8 0 0 0 1 2 0 123 09 21 19 27 32 19 3 16 2 20 1 8 17 3 8 0 0 0 1 2 0 148 10 21 19 27 32 19 3 16 2 20 1 8 17 3 8 0 0 0 1 2 0 152 12...

Страница 13: ...osition the unit to minimize long runs of duct or runs of duct with many turns and elbows 2 Open the return air compartment UPFLOW FURNACE A SOLID METAL BASE PLATE MUST BE INSTALLED IN THE FURNACE BOT...

Страница 14: ...a switch is tripped it must be manually reset DO NOT JUMPER THESE DEVICES IF ONE OF THESE SWITCHES SHOULD TRIP A QUALIFIED INSTALLER SERVICE AGENCY OR THE GAS SUPPLIER MUST BE CALLED TO CHECK AND OR...

Страница 15: ...e will operate continuously 5 Test for spillage at the draft hood relief opening after 5 minutes of main burner operation Use the flame of a match or candle or smoke from a cigarette cigar or pipe 6 A...

Страница 16: ...f the flue products and are highly corrosive after they condense ALL FURNACE INSTALLATIONS MUST COMPLY WITH THE NATIONAL FUEL GAS CODE AND LOCAL CODES TO PROVIDE ADEQUATE COMBUSTION AND VENTILATION AI...

Страница 17: ...Area Round Pipe Input Each Opening Size 45 000 11 25 square inches 4 60 000 15 00 square inches 5 75 000 18 75 square inches 5 90 000 22 50 square inches 6 105 000 26 25 square inches 6 120 000 30 00...

Страница 18: ...r spaces crawl or attic that freely communicate with the outdoors and shall have a minimum free area of a 1 square inch for each 3 000 BTUH of the total input rating of all equipment located in the en...

Страница 19: ...minimum clearances to combustibles are maintained between the PVC pipe and other pipes 5 All vent runs through unconditioned spaces where below freezing temperatures are expected should be insulated...

Страница 20: ...R IMPROPER LOCATION OR INSTALLATION CAN CAUSE STRUCTURAL OR EXTERIOR FINISH DAMAGE TO THE BUILDING Non direct venting location requirements are slightly different in some cases than direct venting Ins...

Страница 21: ...21 FIGURE 17 OTHER THAN DIRECT VENT TERMINAL CLEARANCES Natural Gas and Propane Installation Code National Fuel Gas Code Canadian Installations US Installations Canadian Installations US Installations...

Страница 22: ...minimum vent pipe length is 5 feet Size the exhaust and combustion air intake pipes as specified in Table 2 This table lists the maximum allow able length in feet of the exhaust and combustion air int...

Страница 23: ...d horizontal intake air termination for all models is a 2 in PVC coupling with a wind deflector vane provided attached Cut a 21 4 in length of 2 in PVC pipe Connect this pipe and another 2 in PVC coup...

Страница 24: ...ternate horizontal direct vent termination kits RXGY D02 1 2 in tee with reducer assembly 2 1 2 in PVC 6 in dia trap 3 PVC vane 4 2 in PVC elbow 5 11 2 in PVC nipple with coupling 6 PVC strap 7 vent t...

Страница 25: ...UPPLIED E PVC RAINCAP E B A C D E B A C D CONCENTRIC TERMINATIONS VERTICAL HORIZONTAL CONCENTRIC VENT KIT NO RXGY E03 This kit is for vertical horizontal intake air vent runs and may be installed thro...

Страница 26: ...THE LAST 12 INCHES WITH 11 2 PVC PIPE ON 45 000 THROUGH 75 000 BTUH MODELS SEE DETAIL A 6 30 MAXIMUM EXPOSED VENT LENGTH PITCHED ROOF INSTALLATIONS NOTES 1 SUPPORT HORIZONTAL PIPE EVERY FOUR FEET 2 W...

Страница 27: ...27 FIGURE 22 DIRECT VENT TERMINAL CLEARANCES Natural Gas and Propane Installation Code National Fuel Gas Code Canadian Installations US Installations Canadian Installations US Installations...

Страница 28: ...bustion air inlet minimum of 3 feet from the vent of any other gas or fuel burning appliance or clothes dryer to prevent recirculation of the flue gases into the furnace combustion air inlet The only...

Страница 29: ...PERMITTED See Figures 24 and 25 for positioning of the terminations When more than two furnaces are to be vented there must be at least 4 feet between the first two furnaces and the third etc FIGURE...

Страница 30: ...ons in wall To prevent possibility of condensate freeze up or recirculation do not install vent kits one above the other NOTE The vent illustration in Figure 27 can be used for Non direct vent termina...

Страница 31: ...pe fitting extending through the right side of the furnace top cover This opening has a pro tective cap which should be removed just prior to installing the exhaust pipe When 2 in pipe is used con nec...

Страница 32: ...drain or condensate pump IMPORTANT If installing the unit over a finished ceiling or living area be certain to install an auxiliary condensate drain pan under the entire unit extending out under the...

Страница 33: ...rainage hoses from the trap Remove the trap from its mounting bracket rotate it 180 degrees and mount in place with the drainage elbow pointing to the left Reattach the drain hoses Remove the plug fro...

Страница 34: ...plastic plugs on either side of the trap outlet hole and discard 4 Remove the L shaped clear vinyl drain tube from the top of the existing trap Do not disconnect the short end from the furnace collec...

Страница 35: ...IGHT POSITION REMOVAL OF EXISTING DOWNFLOW CONDENSATE TRAP FIGURE 36 HORIZONTAL POSITION CONDENSATE TRAP INSTALLATION FOR HORIZONTAL OPERATION I534 CONDENSATE TRAP CONVERSION FROM DOWNFLOW TO HORIZONT...

Страница 36: ...line directly from the meter to the furnace Consult the local gas company for the location of the manual main shut off valve The gas line and manual gas valve must be adequate in size to prevent undue...

Страница 37: ...tion IMPORTANT ENSURE that the furnace gas control valve not be subjected to high gas line supply pressures DISCONNECT the furnace and its individual shut off valve from the gas supply piping during a...

Страница 38: ...ts that use 10 of water column at the orifice This difference requires a deviation from the NFGC orifice size recommendations The Sea Level input should still be reduced by 4 per thousand ft and the o...

Страница 39: ...the same gas line as the furnace 4 Note or adjust the line gas pressure to give A 5 10 5 w c for natural gas B 11 13 w c for LP gas 5 Shut off the gas at the manual gas valve and remove the U Tube ma...

Страница 40: ...42 MANIFOLD PRESSURE READING FIGURE 43 UPFLOW GROUNDING CONNECTIONS JUNCTION BOX CONDENSATE TRAP CONTROL IS GROUNDED WHEN ATTACHED TO BLOWER LOW VOLTAGE TERMINALS IFC MOUNTING PLATE BLOWER COMPARTMEN...

Страница 41: ...ncy and phase corresponds to that specified on the furnace rating plate For single furnace application maximum over current protection is 15 amperes Use a separate fused branch electrical circuit cont...

Страница 42: ...mostat b The 24 VAC supply to both control boards must be in phase with each other c Connect the C W and TWIN terminals to counterparts on each control d Both control boards must have switch 3 in the...

Страница 43: ...43 FIGURE 46 UT Electronic Controls 1028 928 CONTROL BOARD TWINNING CONNECTION SINGLE STAGE OPERATION Control Board 1 Control Board 2...

Страница 44: ...44 FIGURE 47 UT ELECTRONIC CONTROLS 1028 928 CONTROL BOARD TWINNING CONNECTION TWO STAGE OPERATION Control Board 1 Control Board 2...

Страница 45: ...gh altitude kit for proper operation The high altitude kit consists of a high altitude pressure switch that replaces the pressure switch attached to the induced draft blower The kit also contains gas...

Страница 46: ...12 600 12 000 11 400 10 800 10 200 9 600 All calculations are performed by using the first three columns of information only Before beginning any calculations determine the individual burner Btu size...

Страница 47: ...W C ALTITUDE INPUT OUTPUT ORIFICE SIZE MANIFOLD PRESSURE 0 2000 45 000 60 000 75 000 90 000 105 000 120 000 40 500 54 000 67 500 81 000 94 500 108 000 1 15mm 10 W C 2001 4500 40 500 54 000 67 500 81 0...

Страница 48: ...rgized 4 If flame is not sensed during the 8th second after the gas valve opens the gas valve closes and the igniter de energizes 5 After a 10 second post purge the inducer stops and the control verif...

Страница 49: ...INPUT RATE The furnace is shipped from the factory with 50 orifices They are sized for natural gas having a heating value of 1075 BTU cu ft and a specific gravity of 60 Since heating values vary geo g...

Страница 50: ...emperature rise 5 Compare the measured temperature rise to the approved temperature rise range listed on the furnace name plate See Figure 50 If the measured temperature rise is above the approved ran...

Страница 51: ...1210 1180 1150 1120 1075 1035 MED 1490 1465 1445 1405 1375 1315 1255 HIGH 1720 1670 1620 1600 1580 1520 1460 90TJ09 12 X 11 1 2 LOW 1155 1125 1100 1080 1060 1000 940 MED 1420 1400 1380 1365 1350 1260...

Страница 52: ...gyback jumper H C to FAN and do not connect Y to the integrated furnace control Do not connect anything to H or C GAS FURNACE DIRECT DRIVE INSTRUCTIONS FOR CHANGING BLOWER SPEED DISCONNECT THE ELECTRI...

Страница 53: ...the filters clean at all times Vacuum dirt from filter wash with detergent and water air dry thoroughly and reinstall NOTE Some filters must be resized to fit certain units and applications See Table...

Страница 54: ...WS 2 REQ D ANGLE DETAIL CUT OUT AND DRILL DETAIL ROD FILTER SUPPORT ANGLE ASSEMBLY FILTER AND ROD ASSEMBLY FILTER ROD SUPPORT ANGLE FILTER SUPPORT ANGLE FILTER FILTER ROD JACKET I332 I413 UPFLOW I528...

Страница 55: ...y filters can restrict airflow The motor depends upon sufficient air flowing across and through it to keep from overheating SYSTEM OPERATION INFORMATION Advise The Customer 1 Keep the air filters clea...

Страница 56: ...uring ignition trial If yes go to F Did a limit open during ignition trial If yes go to D Check line voltage between HEAT and NEUTRAL on IFC Check wires connections and continuity between IFC and IBM...

Страница 57: ...57 FIGURE 57 90RJ MODELS WITH UT ELECTRONIC CONTROLS 1012 925 OR INVENSYS CLIMATE CONTROLS ICC H1MC7 01 CONTROL BOARD HSI...

Страница 58: ...58 FIGURE 58 90RJ MODELS WITH UT ELECTRONIC CONTROLS 1012 925 OR INVENSYS CLIMATE CONTROLS ICC H1MC7 01 CONTROL BOARD HSI...

Страница 59: ...59...

Страница 60: ...60 CM 0607 MANUFACTURED BY ICECO 5600 OLD GREENWOOD ROAD FORT SMITH ARKANSAS 72908...

Отзывы: