![Iceco 90RJ Series Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/iceco/90rj-series/90rj-series_installation-instructions-manual_4473822030.webp)
30
RXGY-G02 SIDE WALL VENT
This termination for horizontal venting
only.
IMPORTANT:
Do not install on the
prevailing winter wind side of the
structure. Observe same clearances
specified for horizontal, standard
termination.
NOTE:
Multi-venting-No common
venting.
NOTE:
Install the vent and air intake
piping into the vent plate openings.
Seal all gaps between the pipes and
wall.
Be Sure To Use Silicone
Sealant
to seal the vent pipe to the
vent cap to permit field disassembly
for annual inspection and cleaning.
Also seal all pipe penetrations in wall.
To prevent possibility of condensate
freeze-up or recirculation,
do not
install vent kits one above the
other.
NOTE:
The vent illustration in Figure
27 can be used for Non-direct vent
terminations also.
ST-A1075
FIGURE 27
VENT KIT INSTALLATION OPTIONS
FIGURE 26
VENT KIT INSTALLATION OPTIONS
EXHAUST
AIR
INTAKE
For 90000 thr
u
120000 BTUH models-
red
u
ce to a len
g
th between 12 inches
and 30 inches of 2 inch pipe.
for 45000 thr
u
75000 BTUH models-
when 3 inch pipe is
u
sed: red
u
ce last 30
inches to 18 inches of 2 inch pipe and
12 inches of 1-1/2 inch pipe to maintain
velocity.
Note:
Vent sho
u
ld protr
u
de a
maxim
u
m of 2-1/4Ó beyond vent plate.
Air intake sho
u
ld protr
u
de a maxim
u
m
of 1 inch beyond vent plate.
Seal all wall cavities
Содержание 90RJ Series
Страница 59: ...59...
Страница 60: ...60 CM 0607 MANUFACTURED BY ICECO 5600 OLD GREENWOOD ROAD FORT SMITH ARKANSAS 72908...