Industrial Bolting Technologies IBT-115 Single-Port Power Pack
7
Filling the Reservoir
Attention: The power pack has been shipped without oil in the reservoir. Only use a high-
grade, quality non-foaming hydraulic oil.
•
Clean the area around the filler cap.
•
Any dirt or grime in the hydraulic oil can damage the internal workings of the
power pack.
•
Remove the filler cap, and insert a clean funnel.
•
Fill with hydraulic oil to 1” from the top of the filler hole.
•
Winter - ISO VG 32# Summer - ISO VG 46#
•
Replace filler cap.
•
Cycle the power pack several times.
•
Retract the tensiorer and check the oil level in the power pack reservoir again.
•
This will also help eliminate air from the system.
Operational Readiness
Prior to use:
•
Check power supply.
•
System rated for 21,750 PSI/1500 Bar.
•
Before use, check to make sure all tools have a high pressure rating.
Pressure Regulating Valve operation
•
Tighten the Pressure Regulating Valve.
o
This will cause pressure to rise when you press the remote control button.
•
Pressure will hold when you turn off the unit power.
•
When job is complete, open the Pressure Regulating Valve to release system pressure.