![IBO IVR-10 Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/ibo/ivr-10/ivr-10_user-manual_609253016.webp)
15
WIRING OPERATIONS
INSTALLATION
Installation and test
Single Pump installation diagram
For proper operation, the inverter must work with a diaphragm tank with a minimum capacity of 2L. Membrane tank it should be inflated
to 60% of the water pressure set on the controller. Example: for a pressure set to 4 bar controller, the air pressure in the membrane tank
(without water) should be 2.4 bar. Tank air pressure must be determined before starting the controller before water appears in the
installation.
Single-phase in and Single-phase out
~230V / wyjście ~230V
Single-phase in and three-phase out
~3 x 400V / wyjście ~3 x 400V
- Cable connections must be made by a specialist
- Work on cables must be carried out with the power off
- Make sure the cables are connected correctly and check the mains voltage before connecting the
power supply
- Please do not perform inverter puncture tests
- Make sure the ground terminal is connected
- The front panel with the display must be installed before turning on the power
Tap water Pressurization installation mode
Self-priming pump Water supply installation mode
Submersible pump Water supply installation mode
Содержание IVR-10
Страница 20: ......