
Information capture. Done right
™
866-798-4265
www.ibml.com
41
Power On CheckList
q
Connect the AC power. Securely connect the ImageTrac power cord from the Main Base Power Supply to the power source. The Main Base Power
Supply is located in the floor of the Registration frame.
q
Place the main breaker switch in the “on” position. It is located on the back of the Main Power Supply.
q
Place the Embedded Application Controller/Monitor breaker switch in the “on” position. It is located on the back of the Main Base Power Supply on
the right side.
q
The wireless keyboard and mouse must be turned on.
q
Turn on the Embedded Application Controller by pressing the power button on the CPU. Verify that the monitor has power and is in the “on”
position. After the Embedded Application Controller is on, the user should fully log on to the Windows Operating System prior to turning on the
main power on to the remainder of the ImageTrac.
q
Engage the operator switch to power on the Transport PC and the scanner. This switch is located above the Emergency Stop Switch on the
Registration module.