August 15, 2017
© Copyright IBM Corporation, 2017 Page 108 of 117
Once the user has selected to OK continue the operation, a task will be started to track the progress of the
operation via the Task Tracking mechanism. As with many other functions, the MI will display the final
status in the Operation History page, whether it is failed, successfully completed, or still in progress.
Therefore, the MI will need to redirect the user to the Operation History page to get their results for this
operation. If any failure occurs an Event will be posted. The Event could indicate that not all physical
volumes may have been moved successfully and an operator intervention will be posted. Users can also be
directed back to the “Move Export Hold to Private” page to review the current list of physical volumes that
remain in the pool and to resubmit the Move.
Содержание TS7700 Series
Страница 12: ...August 15 2017 Copyright IBM Corporation 2017 Page 12 of 117...
Страница 60: ...August 15 2017 Copyright IBM Corporation 2017 Page 60 of 117 MI page of code level 8 30 x x or higher...
Страница 91: ...August 15 2017 Copyright IBM Corporation 2017 Page 91 of 117...
Страница 104: ...August 15 2017 Copyright IBM Corporation 2017 Page 104 of 117...