b. Position of the rotator stub (
3
).
c. Front loader motor worm gear (
1
). Rotating this gear allows the loader mechanism gear (
8
) to
turn.
6. Rotate the loader motor worm gear (
1
) to turn the loader mechanism gear (
6
) counterclockwise.
Continue turning until the rotator stub (
3
) loses contact with the lever (
7
). This action releases the
LBA leader pin.
7. Rotate the threader motor worm gear (
4
) to turn the threader mechanism gear (
6
)
counterclockwise. This action moves the LBA out of the cartridge and past the read/write head. Stop
this rotation when the LBA is near the tape guide roller nearest the rear of the drive (
1
).
Figure 108. Leader Block Assembly (LBA)
8. Continue rotating the loader motor worm gear (
1
) until the rotate stub (
3
) is positioned as shown.
Notice that the rotator stub (
3
) is nearly aligned with the cartridge loader tray guide bearing (
2
).
9. Remove the cartridge from the cartridge loader tray.
10. Go to “Ending procedure” on page 197.
Half height drive: Tape pulled from or broken near leader pin
Figure 109. Drive with cover removed to reveal gear train.
1
Threader intermediate
gear
2
Threader mechanism
gear
3
Loader motor worm gear
Appendix D. Manual cartridge removal procedure 185
Содержание TS4300 3555
Страница 1: ...IBM TS4300 Tape Library Machine Type 3555 User s Guide IBM SC27 4629 07...
Страница 66: ...Chapter 3 Installing 36 IBM TS4300 Tape Library Machine Type 3555 User s Guide...
Страница 77: ...Figure 38 Mounting the rails to the connectors Chapter 3 Installing 47...
Страница 175: ...Figure 81 Unlocked spooling mechanism enlarged view Chapter 6 Upgrading and servicing 145...
Страница 261: ......
Страница 262: ...IBM SC27 4629 07...