The
Fibre
Channel
RAID
controller
has
two
status
LEDs
on
each
of
the
two
Fiber
Channel
host
connectors.
The
following
tables
show
the
Fibre
Channel
host
connector
status
LEDs.
Table
6.
Fiber
Channel
host
connector
status
LED
9
and
LED
10
Name
LED
9
green
LED
10
amber
Power
on
Lit
continuously
Lit
continuously
Loss
of
sync
Off
Flashes
at
half-second
intervals
Online
Lit
continuously
Off
FC
chip
fault
Flashes
at
half-second
intervals
Flashes
at
half-second
intervals
Table
7.
Fibre
Channel
host
connector
status
LED
11
and
LED
12
Name
LED
11
green
LED
12
amber
Power
on
Lit
continuously
Lit
continuously
Loss
of
sync
Off
Flashes
at
half-second
intervals
Online
Lit
continuously
Off
FC
chip
fault
Flashes
at
half-second
intervals
Flashes
at
half-second
intervals
Cache
memory
and
RAID
controller
battery
Each
RAID
controller
contains
256
MB
of
cache
memory.
It
also
contains
a
sealed,
rechargeable
lithium
ion
battery
that
maintains
data
in
the
cache
in
the
event
of
a
power
failure.
This
battery
provides
cache
backup
for
up
to
three
days
in
the
event
of
a
power
loss.
The
service
life
of
the
battery
is
36
months,
after
which
time
the
battery
must
be
replaced.
For
information
about
replacing
the
battery,
see
“Replacing
the
cache
battery
in
the
RAID
controller”
on
page
48.
Turning
the
storage
subsystem
on
and
off
This
section
contains
instructions
for
turning
the
storage
subsystem
on
and
off
under
normal
and
emergency
situations.
If
you
are
turning
on
the
storage
subsystem
after
an
emergency
shutdown
or
power
outage,
see
“Restoring
power
after
an
emergency
shutdown”
on
page
40.
Turning
on
the
storage
subsystem
Complete
the
following
steps
to
turn
on
the
power
for
the
initial
startup
of
the
storage
subsystem.
1.
Make
sure
that:
a.
All
communication
and
power
cables
are
connected
to
the
back
of
the
storage
subsystem
and
a
properly
grounded
ac
electrical
outlet.
b.
All
hard
disk
drives
are
locked
securely
in
place.
For
more
information,
see
“Installing
a
hot-swap
hard
disk
drive”
on
page
44.
Attention:
If
you
are
restarting
the
system
after
a
normal
shutdown,
wait
at
least
10
seconds
before
you
turn
on
the
power
by
using
the
power-on
sequence
in
step
2
on
page
37.
36
IBM
TotalStorage
DS300
and
DS400:
Hardware
Installation
and
User’s
Guide
Содержание TotalStorage DS300
Страница 1: ...IBM TotalStorage DS300 and DS400 Hardware Installation and User s Guide...
Страница 2: ......
Страница 3: ...IBM TotalStorage DS300 and DS400 Hardware Installation and User s Guide...
Страница 12: ...x IBM TotalStorage DS300 and DS400 Hardware Installation and User s Guide...
Страница 42: ...28 IBM TotalStorage DS300 and DS400 Hardware Installation and User s Guide...
Страница 74: ...60 IBM TotalStorage DS300 and DS400 Hardware Installation and User s Guide...
Страница 76: ...62 IBM TotalStorage DS300 and DS400 Hardware Installation and User s Guide...
Страница 108: ...94 IBM TotalStorage DS300 and DS400 Hardware Installation and User s Guide...
Страница 109: ......
Страница 110: ...Part Number 25K8194 Printed in USA 1P P N 25K8194...