5.
From the rear of the control enclosure, check the LEDs on each node canister
(see Figure 25).
▌1▐
Power
▌2▐
Status
▌3▐
Fault
The canister is ready with no critical errors when Power is illuminated, Status
is flashing, and Fault is off. If a canister is not ready, refer to the “Procedure:
Understanding the system status using the LEDs” topic in “Troubleshooting”.
v3500064
2
3
1
Figure 25. Node canister LEDs
28
Storwize V5000: Quick Installation Guide
Содержание Storwize V5000
Страница 1: ...IBM Storwize V5000 Quick Installation Guide GI13 2861 05 IBM...
Страница 4: ...iv Storwize V5000 Quick Installation Guide...
Страница 6: ...vi Storwize V5000 Quick Installation Guide...
Страница 8: ...viii Storwize V5000 Quick Installation Guide...
Страница 24: ...xxiv Storwize V5000 Quick Installation Guide...
Страница 64: ...40 Storwize V5000 Quick Installation Guide...
Страница 66: ...42 Storwize V5000 Quick Installation Guide...
Страница 68: ...44 Storwize V5000 Quick Installation Guide...
Страница 79: ......
Страница 80: ...IBM Printed in USA GI13 2861 05...