background image

Racks with a total weight of > 227 kg (500 lb.), Use Only Professional Movers!
(R003)

DANGER

Do not transport the rack via fork truck unless it is properly packaged,
secured on top of the supplied pallet. (R004)

DANGER

Main Protective Earth (Ground):

This symbol is marked on the frame of the rack.

The PROTECTIVE EARTHING CONDUCTORS should be terminated at that
point. A recognized or certified closed loop connector (ring terminal) should
be used and secured to the frame with a lock washer using a bolt or stud.
The connector should be properly sized to be suitable for the bolt or stud, the
locking washer, the rating for the conducting wire used, and the considered
rating of the breaker. The intent is to ensure the frame is electrically bonded
to the PROTECTIVE EARTHING CONDUCTORS. The hole that the bolt or
stud goes into where the terminal conductor and the lock washer contact
should be free of any non-conductive material to allow for metal to metal
contact. All PROTECTIVE EARTHING CONDUCTORS should terminate at

this main protective earthing terminal or at points marked with 

. (R010)

Special caution and safety notices

This information describes special safety notices that apply to the Storwize V3500.
These notices are in addition to the standard safety notices supplied and address
specific issues relevant to the equipment provided.

General safety

When you service the Storwize V3500, follow general safety guidelines.

Use the following general rules to ensure safety to yourself and others.

v

Observe good housekeeping in the area where the devices are kept during and
after maintenance.

v

Follow the guidelines when lifting any heavy object:

1.

Ensure that you can stand safely without slipping.

2.

Distribute the weight of the object equally between your feet.

3.

Use a slow lifting force. Never move suddenly or twist when you attempt to
lift.

4.

Lift by standing or by pushing up with your leg muscles; this action removes
the strain from the muscles in your back. Do not attempt to lift any objects that
weigh more than 18 kg (40 lb) or objects that you think are too heavy for you.

v

Do not perform any action that causes a hazard or makes the equipment unsafe.

xiv

Storwize V3500: Quick Installation Guide

Содержание Storwize V3500

Страница 1: ...IBM Storwize V3500 Quick Installation Guide GC27 4218 08 IBM...

Страница 2: ...ntal notices on page ix v The information in the IBM Environmental Notices and User Guide provided on a DVD This edition applies to IBM Storwize V3500 and is valid until replaced by new editions This...

Страница 3: ...anisters 25 Connecting Fibre Channel cables to a Fibre Channel host interface adapter 26 Connecting a control enclosure to a host 26 Powering on the system 28 Chapter 3 Configuring the system 31 Check...

Страница 4: ...iv Storwize V3500 Quick Installation Guide...

Страница 5: ...ure 14 12 Removing a node canister 16 13 Removing the canister cover 17 14 Host interface adapter and SFP transceivers 18 15 Installing 8 Gbps Fibre Channel 4 port host interface adapter 19 16 Reinsta...

Страница 6: ...vi Storwize V3500 Quick Installation Guide...

Страница 7: ...library xviii 3 IBM documentation and related websites xviii 4 IBM websites for help services and information xx 5 Storwize V3500 enclosures 4 6 Selecting bracket pins for your rack 12 7 Default user...

Страница 8: ...viii Storwize V3500 Quick Installation Guide...

Страница 9: ...cations that were provided with the Storwize V3500 hardware 3 Find the matching identification number in the IBM Systems Safety Notices Then review the topics concerning the safety notices to ensure t...

Страница 10: ...check the safety notice in each language To find the translated text for a caution or danger notice 1 In the product documentation look for the identification number at the end of each caution notice...

Страница 11: ...to eliminate potential hazards v Verify that the route that you choose can support the weight of the loaded rack cabinet Refer to the documentation that comes with your rack cabinet for the weight of...

Страница 12: ...CAUTION If the rack is designed to be coupled to another rack only the same model rack should be coupled together with another same model rack R009 Danger notices for Storwize V3500 Ensure that you a...

Страница 13: ...d only to connect or disconnect signal cables v Never turn on any equipment when there is evidence of fire water or structural damage v Disconnect the attached power cords telecommunications systems n...

Страница 14: ...inate at this main protective earthing terminal or at points marked with R010 Special caution and safety notices This information describes special safety notices that apply to the Storwize V3500 Thes...

Страница 15: ...you understand how to handle devices that are sensitive to static electricity Attention Static electricity can damage electronic devices and your system To avoid damage keep static sensitive devices...

Страница 16: ...ection device SPD v The dc powered system employs an isolated DC return DC I design The DC battery return terminal shall not be connected to the chassis or frame ground v The storage device dc power i...

Страница 17: ...formation collection is available at the following website pic dhe ibm com infocenter storwize v3500_ic index jsp Storwize V3500 library Unless otherwise noted the publications in the library are avai...

Страница 18: ...enclosure in a rack and beginning the setup process GC27 4221 IBM Storwize V3500 Read First Flyer This document introduces the major components of the Storwize V3500 system and describes how to get s...

Страница 19: ...V3500 or related products or technologies Type of information Website Storwize V3500 support www ibm com storage support storwize v3500 Technical support for IBM storage products www ibm com storage...

Страница 20: ...ge software or storage hardware depending on the nature of your problem If you call from somewhere other than the US or Canada you must choose the hardware option when calling for assistance When call...

Страница 21: ...e troubleshooting information for diagnostic instructions The troubleshooting procedure might require you to download updated device drivers or machine code IBM maintains pages on the web where you ca...

Страница 22: ...xxii Storwize V3500 Quick Installation Guide...

Страница 23: ...ttaching the data cables and power cords 3 Chapter 3 Configuring the system on page 31 helps you create your configuration file and access the management GUI The management GUI guides you through the...

Страница 24: ...lifting svc00146 18 32 kg 39 7 70 5 lbs 32 55 kg 70 5 121 2 lbs 55 kg 121 2 lbs 27 Also keep in mind that a rack full of equipment is extremely heavy DANGER Heavy equipment personal injury or equipmen...

Страница 25: ...onnect or disconnect signal cables Never turn on any equipment when there is evidence of fire water or structural damage Disconnect the attached power cords telecommunications systems networks and mod...

Страница 26: ...2071CU2 IBM Storwize V3500 12 slot Dual Control Enclosure for 3 5 inch drives 2071 10A ACBA 2071CU3 IBM Storwize V3500 24 slot Dual Control Enclosure for 2 5 inch drives __ v Rack mounting hardware k...

Страница 27: ...USB ports Each canister has two USB ports One port is used during installation v 2 Ethernet ports Each canister has two 1 Gbps Ethernet ports Port 1 Must be connected for system management Can option...

Страница 28: ...red between the front and rear rack rails Expansion enclosure support rails The left and right expansion enclosure support rails Figure 4 on page 7 are designed specifically for installation of an exp...

Страница 29: ...ged with the publications and contains the initialization tool for completing the initial system configuration fab10053 Figure 4 Expansion enclosure support rails on Storwize V3500 svc00646 Figure 5 U...

Страница 30: ...he environment of your system If you have not done the environmental planning for your system see the Storwize V3500 physical installation planning topic in the IBM Knowledge Center for Storwize V3500...

Страница 31: ...are installed must meet the following requirements before installing the support rails and enclosures v Upright mounting rails must not be painted oxidized or otherwise insulated from the enclosure fl...

Страница 32: ...in the rack cabinet 2 Remove the springs that are taped to one of the rails 3 Attach a spring to the outside of each rail a Attach the circle end of the spring around the stud on the rail See Figure 7...

Страница 33: ...nt to install the support rails Figure 8 shows two rack units with the front mounting holes identified v 1 Upper rail mounting bracket pin v 2 Lower rail mounting bracket pin v3500067 Figure 7 Install...

Страница 34: ...g holes in your rack see Table 6 Table 6 Selecting bracket pins for your rack Mounting holes Bracket pins Round unthreaded Use the preinstalled medium pins Round threaded Unscrew the medium pins and r...

Страница 35: ...the rail to the rack cabinet flange See Figure 10 10 On the front of the rail press the two bracket pins into the holes in the rack flanges 11 Close the front hinge bracket to secure the rail to the...

Страница 36: ...ensure rack stability Empty the rack from the top down Procedure To install an enclosure complete the following steps 1 On either side of the drive assemblies remove the enclosure end caps by graspin...

Страница 37: ...ol enclosure If you have purchased host interface adapters for your control enclosure and those options were not preinstalled for you you must open each node canister and install the options Note You...

Страница 38: ...te the following steps 1 If the canister is already installed in the enclosure remove it as shown in Figure 12 a Unlatch the release levers and pull them open The canister moves out of the slot approx...

Страница 39: ...n the cover as shown in Figure 13 a Press the recessed blue touch points on the cover b Slide the cover away from the thumbscrew end of the canister v3500178 Figure 13 Removing the canister cover Chap...

Страница 40: ...ns in both canisters Do not start installation until you have two of the 8 Gbps Fibre Channel 4 port host interface adapter options About this task Note The host interface adapter has four ports but o...

Страница 41: ...adapter 3 into the canister as shown in Figure 15 6 Align the mounting bracket of the host interface adapter with the inside of the host interface adapter aperture at the thumbscrew end of the canist...

Страница 42: ...is installed squarely in its slot and tighten the retaining thumbscrew 1 10 Reinstall the SFP transceivers To install a transceiver push it fully into the port and close the release handle 11 If you...

Страница 43: ...sure Procedure To close the canister complete the following steps 1 Reinstall the cover as shown in Figure 16 a Align the four hook slots on the cover with the pins on the canister b Slide the cover t...

Страница 44: ...17 a With the latch and release levers fully extended slide the canister into the enclosure until the levers begin to move inwards b Simultaneously close both latch and release levers v3500100 OK IN O...

Страница 45: ...g steps 1 Remove the filler panel from the slot into which you want to install the drive as shown in Figure 18 a Grip the front of the filler panel 1 and pull firmly to remove it from the the drive sl...

Страница 46: ...s in the open unlocked position b Align the drive assembly with the guide rails in the slot c Gently push the drive assembly into the slot until the drive stops d Rotate the drive handle to the closed...

Страница 47: ...e used for iSCSI connectivity to the system by hosts on the network Where more than one control enclosure is present in the system ensure port 1 of every node canister is connected to the same network...

Страница 48: ...ected to each canister 2 If you want to connect additional Fibre Channel cables make sure to connect the same number of cables to each canister Figure 22 shows an example configuration with four Fibre...

Страница 49: ...v Insert the connector gently until it clicks into place If you feel resistance the connector is probably oriented the wrong way Do not force it v When inserted correctly the connector can only be rem...

Страница 50: ...or slots v Every unused drive bay must be occupied by a filler panel v Filler panels must be installed in all empty host interface adapter slots Open bays or slots disrupt the internal air flow causin...

Страница 51: ...ors when Power is illuminated Status is flashing and Fault is off If a canister is not ready refer to the Procedure Understanding the system status using the LEDs topic in Troubleshooting v3500064 2 3...

Страница 52: ...30 Storwize V3500 Quick Installation Guide...

Страница 53: ...Apple Macintosh computer on page 37 v For Linux refer to Initializing the system with a Linux computer on page 39 Checking your web browser settings for the management GUI To access the management GUI...

Страница 54: ...Click Trusted sites d On the Trusted sites dialog verify that the web address for the management GUI is correct and click Add e Verify that the correct web address was added to the Trusted sites dialo...

Страница 55: ...ions 4 Enable scripts to disable or replace context menus Mozilla Firefox only For Mozilla Firefox a On the menu bar in the Firefox browser window click Tools Options b On the Options window select Co...

Страница 56: ...Default user name and password for the management GUI User name Password superuser passw0rd Note The 0 character in the password is the number zero not the letter O 34 Storwize V3500 Quick Installatio...

Страница 57: ...nabling additional capabilities The IP address of a Network Time Protocol NTP server for automated setting of date and time The IP address of a simple mail transfer protocol SMTP server for sending no...

Страница 58: ...Log in with user name superuser and password passw0rd Note The 0 character in the password is a zero not the letter O 9 Follow the on screen instructions to begin setting up your system Note The other...

Страница 59: ...t mask Gateway v Other information is optional but useful for enabling additional capabilities The IP address of a Network Time Protocol NTP server for automated setting of date and time The IP addres...

Страница 60: ...e system go to the computer you will use to manage the system and start a supported browser Direct the browser to the management address you specified for the system 10 Log in with user name superuser...

Страница 61: ...k Gateway v Other information is optional but useful for enabling additional capabilities The IP address of a Network Time Protocol NTP server for automated setting of date and time The IP address of...

Страница 62: ...ower fails while it is operating within the extended temperature range This is because the battery capacity decreases as temperature rises If the save of cache and state data cannot be completed an ex...

Страница 63: ...orts and connectors The Storwize V3500 online documentation and its related publications are accessibility enabled The accessibility features of the online documentation are described in Viewing infor...

Страница 64: ...42 Storwize V3500 Quick Installation Guide...

Страница 65: ...d Warranty is available in both hardcopy format and in the Storwize V3500 information center The Statement of Limited Warranty is shipped in hardcopy form with your product It can also be ordered from...

Страница 66: ...44 Storwize V3500 Quick Installation Guide...

Страница 67: ...t the IBM Intellectual Property Department in your country or send inquiries in writing to Intellectual Property Licensing Legal and Intellectual Property Law IBM Japan Ltd 19 21 Nihonbashi Hakozakich...

Страница 68: ...ucts Questions on the capabilities of non IBM products should be addressed to the suppliers of those products Statements regarding IBM s future direction or intent are subject to change or withdrawal...

Страница 69: ...ft Corporation in the United States other countries or both Other product and service names might be trademarks of IBM or other companies Homologation statement This product may not be certified in yo...

Страница 70: ...ser might be required to take adequate measures European Union Electromagnetic Compatibility Directive This product is in conformity with the protection requirements of European Union EU Council Direc...

Страница 71: ...und daf r aufzukommen Deutschland Einhaltung des Gesetzes ber die elektromagnetische Vertr glichkeit von Ger ten Dieses Produkt entspricht dem Gesetz ber die elektromagnetische Vertr glichkeit von Ger...

Страница 72: ...n Corporation 3F No 7 Song Ren Rd Taipei Taiwan Tel 0800 016 888 Japan VCCI Council Class A statement This explains the Japan Voluntary Control Council for Interference VCCI statement Japan Electronic...

Страница 73: ...for products greater than 20 A single phase This statement explains the JEITA statement for products greater than 20 A per phase three phase Korean Communications Commission Class A Statement This exp...

Страница 74: ...52 Storwize V3500 Quick Installation Guide...

Страница 75: ...stalling 14 F FCC Federal Communications Commission electronic emission notice 47 Federal Communications Commission FCC electronic emission notice 47 feedback xix Fibre Channel cables 26 host interfac...

Страница 76: ...rd 18 shortcut keys keyboard 41 Statement of Limited Warranty Where to find the 43 static sensitive devices xv Storwize V3500 safety notices x xii Storwize V3500 library related publications xvii supe...

Страница 77: ......

Страница 78: ...IBM Printed in USA GC27 4218 08...

Отзывы: