the I/O card.
D
Cache directory card
6.
Unseat the connector on the cache directory card by wiggling the two corners that are farthest from
the mounting pegs. To disengage the mounting pegs, pivot the cache directory card back over the
mounting pegs.
7.
Move the cache directory card to the replacement 572F storage adapter and seat it on the connector
and mounting pegs.
8.
To reassemble the cards, perform the preceding procedure in reverse order. When connecting the two
adapters together, carefully align guide pins
B
on each side of the interconnect connector
A
. After
the connector is seated correctly, apply pressure to completely squeeze the connector together. To
prevent possible card damage, insert all five screws
C
before tightening any of them.
Figure 22. Cache directory card
Figure 23. Unseating the connector
Chapter 6. SAS RAID controller maintenance
43
Содержание SAS RAID Series
Страница 1: ...Power Systems SAS RAID controllers for IBM i...
Страница 2: ......
Страница 3: ...Power Systems SAS RAID controllers for IBM i...
Страница 10: ...2 SAS RAID controllers for IBM i...
Страница 38: ...30 SAS RAID controllers for IBM i...
Страница 62: ...54 SAS RAID controllers for IBM i...
Страница 64: ...Figure 27 Example of SAS subsystem unit addresses 56 SAS RAID controllers for IBM i...
Страница 71: ......
Страница 72: ...Printed in USA...