background image

• Do not operate while under the influence of drugs or alcohol.
• Do not support ladder against LIFT TOOL.
• Tipping hazard. Do not push or lean against load with raised platform.
• Do not use as a personnel lifting platform or step. No riders.
• Do not stand on any part of lift. Not a step.
• Do not climb on mast.
• Do not operate a damaged or malfunctioning LIFT TOOL machine.
• Crush and pinch point hazard below platform. Only lower load in areas clear of personnel and

obstructions. Keep hands and feet clear during operation.

• No Forks. Never lift or move bare LIFT TOOL MACHINE with pallet truck, jack or fork lift.
• Mast extends higher than platform. Be aware of ceiling height, cable trays, sprinklers, lights, and

other overhead objects.

• Do not leave LIFT TOOL machine unattended with an elevated load.
• Watch and keep hands, fingers, and clothing clear when equipment is in motion.
• Turn Winch with hand power only. If winch handle cannot be cranked easily with one hand, it is

probably over-loaded. Do not continue to turn winch past top or bottom of platform travel.

Excessive unwinding will detach handle and damage cable. Always hold handle when lowering,

unwinding. Always assure self that winch is holding load before releasing winch handle.

• A winch accident could cause serious injury. Not for moving humans. Make certain clicking sound

is heard as the equipment is being raised. Be sure winch is locked in position before releasing

handle. Read instruction page before operating this winch. Never allow winch to unwind freely.

Freewheeling will cause uneven cable wrapping around winch drum, damage cable, and may

cause serious injury. (C048, part 2 of 2)

CAUTION:
• Do not install a unit in a rack where the internal rack ambient temperatures will exceed the

manufacturer's recommended ambient temperature for all your rack-mounted devices.

• Do not install a unit in a rack where the air flow is compromised. Ensure that air flow is not

blocked or reduced on any side, front, or back of a unit used for air flow through the unit.

• Consideration should be given to the connection of the equipment to the supply circuit so that

overloading of the circuits does not compromise the supply wiring or overcurrent protection. To

provide the correct power connection to a rack, refer to the rating labels located on the

equipment in the rack to determine the total power requirement of the supply circuit.

• (For sliding drawers) Do not pull out or install any drawer or feature if the rack stabilizer brackets

are not attached to the rack. Do not pull out more than one drawer at a time. The rack might

become unstable if you pull out more than one drawer at a time.

• (For fixed drawers) This drawer is a fixed drawer and must not be moved for servicing unless

specified by the manufacturer. Attempting to move the drawer partially or completely out of the

rack might cause the rack to become unstable or cause the drawer to fall out of the rack. (R001

part 2 of 2)

CAUTION: Removing components from the upper positions in the rack cabinet improves rack

stability during a relocation. Follow these general guidelines whenever you relocate a populated

rack cabinet within a room or building.
• Reduce the weight of the rack cabinet by removing equipment starting at the top of the rack

cabinet. When possible, restore the rack cabinet to the configuration of the rack cabinet as you

received it. If this configuration is not known, you must observe the following precautions.
– Remove all devices in the 32U position and above.
– Ensure that the heaviest devices are installed in the bottom of the rack cabinet.

x  SAN Volume Controller 8.3.1: Machine Types 2145, 2147 Models SA2, SV2

Содержание SAN Volume Controller 2145

Страница 1: ...SAN Volume Controller 8 3 1 Quick Start Guide Machine Types 2145 2147 Models SA2 SV2 IBM...

Страница 2: ...n 1 of IBM and to all subsequent modifications until otherwise indicated in new editions Copyright International Business Machines Corporation 2020 US Government Users Restricted Rights Use duplicatio...

Страница 3: ...ce xix United States Federal Communications Commission FCC Notice xix Chapter 1 Planning 1 System overview 1 Physical configuration planning of a system 1 Completing the hardware location chart 1 Revi...

Страница 4: ...iv...

Страница 5: ...ncluding all Amendments under the Low Voltage Directive UL CSA North America bi national harmonized and marked per accredited NRTL agency listings and other such derivative certifications according to...

Страница 6: ...vi SAN Volume Controller 8 3 1 Machine Types 2145 2147 Models SA2 SV2...

Страница 7: ...n the system website a Go to www ibm com support b Search for SAN Volume Controller c Click the documentation link Safety notices and labels Review the safety notices and safety information labels bef...

Страница 8: ...he IBM System Safety Notices document open it 3 Under the language find the matching identification number Review the topics about the safety notices to ensure that you are in compliance Caution notic...

Страница 9: ...abilizer brake function before each use Do not over force moving or rolling the LIFT TOOL with stabilizer brake engaged Do not raise lower or slide platform load shelf unless stabilizer brake pedal ja...

Страница 10: ...res will exceed the manufacturer s recommended ambient temperature for all your rack mounted devices Do not install a unit in a rack where the air flow is compromised Ensure that air flow is not block...

Страница 11: ...to raise the casters off the pallet and bolt the rack cabinet to the pallet R002 Danger notices for the system Ensure that you are familiar with the danger notices for your system Use the reference n...

Страница 12: ...lift tool load plate and properly secure the load on the lift tool before moving or using the lift tool to lift or move an object D010 DANGER Multiple power cords The product might be equipped with mu...

Страница 13: ...rminal conductor and the lock washer contact should be free of any non conductive material to allow for metal to metal contact All PROTECTIVE EARTHING CONDUCTORS should terminate at this main protecti...

Страница 14: ...ater or other fluids or marks of overheating fire or smoke damage 6 Check for worn damaged or pinched cables 7 Ensure that the voltage that is specified on the product information label matches the sp...

Страница 15: ...l procedures to initiate the test The test is successful if the measured resistance is 0 1 ohm or less Attention Some electrical circuits can be damaged if the external signal cables are present at th...

Страница 16: ...ing it by its edges or frame Do not touch solder joints pins or exposed printed circuitry Do not leave the device where others can handle and possibly damage the device While the device is still in it...

Страница 17: ...BM bernimmt keine Verantwortung f r die Einhaltung der Schutzanforderungen wenn das Produkt ohne Zustimmung von IBM ver ndert bzw wenn Erweiterungskomponenten von Fremdherstellern ohne Empfehlung von...

Страница 18: ...than or equal to 20 A per phase This statement applies to products greater than 20 A single phase This statement applies to products greater than 20 A per phase three phase Japan Voluntary Control Co...

Страница 19: ...l environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio commu...

Страница 20: ...ration is subject to the following two conditions 1 this device might not cause harmful interference and 2 this device must accept any interference received including interference that might cause und...

Страница 21: ...initial data configuration Certain physical site specifications must be met before you can set up your system This activity includes verifying that adequate space is available and that requirements fo...

Страница 22: ...IA 39 EIA 38 EIA 37 EIA 36 EIA 35 EIA 34 EIA 33 EIA 32 EIA 31 EIA 30 EIA 29 EIA 28 EIA 27 EIA 26 EIA 25 EIA 24 EIA 23 EIA 22 EIA 21 EIA 20 EIA 19 EIA 18 EIA 17 EIA 16 EIA 15 EIA 14 EIA 13 EIA 12 EIA 1...

Страница 23: ...nce the number of expansion enclosures above and below the control enclosure Position the enclosures together Avoid adding other equipment between enclosures Position the enclosures in the rack so tha...

Страница 24: ...le to add the enclosure directly above the control enclosure As more expansion enclosures are added alternate adding them above and below the control enclosure Network cable connections worksheet Duri...

Страница 25: ...thernet port 2 Ethernet port 3 Ethernet port 4 Technician port Switch None Port None Speed 10 Gbps or 1 Gbps 1 Gbps Ethernet networking adapter ports The following guidelines must be followed if 25 Gb...

Страница 26: ...l measures might be necessary before IBM provides repair or replacement of the system hardware Implementation of such remedial measures is a customer responsibility The following criteria must be met...

Страница 27: ...age by using the control enclosure For a list of the supported host operating systems refer to the following website http www 03 ibm com systems support storage ssic interoperability wss Multipathing...

Страница 28: ...should be given to the connection of the equipment to the supply circuit so that overloading of the circuits does not compromise the supply wiring or overcurrent protection To provide the correct pow...

Страница 29: ...that are shown in Table 6 on page 9 were obtained in the specific operating environment and under the conditions described These measurements are presented as an illustration measurements that are ob...

Страница 30: ...gth Maximum rail depth 670 mm 26 38 in 870 mm 34 25 in Additional space requirements Ensure that these additional space requirements as shown in Table 10 on page 10 are available around the enclosures...

Страница 31: ...e Non operational 1 04 grms 2 200 Hz Random 3 12 grms Shipping 0 3 g 2 200 Hz Sine 5 g Rotational vibration Normal operation performance measurements in enclosure with no external vibration Throughput...

Страница 32: ...12 SAN Volume Controller 8 3 1 Machine Types 2145 2147 Models SA2 SV2...

Страница 33: ...s 1 Configuring the system with a name and management and service IP addresses Note If you are planning on adding control enclosure to an existing Storwize V7000 system inform the IBM SSR of this inte...

Страница 34: ...sure rails Figure 1 on page 14 The rail assembly consists of two rails that must be installed in the rack cabinet Figure 1 Control enclosure support rails 2 Working at the front of the rack cabinet id...

Страница 35: ...cket and two in the rear bracket Large pins are provided separately Use the pins that are appropriate for the mounting holes in your rack see Table 13 on page 15 Table 13 Selecting bracket pins for yo...

Страница 36: ...t flange See Figure 4 on page 16 Figure 4 Closing the hinge brackets 8 On the front of the rail press the two bracket pins into the holes in the rack flanges 9 Close the front hinge bracket to secure...

Страница 37: ...on both sides and lock it in place Figure 5 Insert the chassis into the rack 2 Make sure that the ball bearing retainer is located at the front of the middle section of the rail 3 With the help of mu...

Страница 38: ...re Channel cables to connect the two node canisters in the enclosure to the switches in the Fibre Channel SAN Procedure To install the cables complete the following steps Initializing the system with...

Страница 39: ...ided in step 2 on page 19 4 After the Ethernet port of the personal computer is connected open a supported browser and browse to address http service If you do not have DCHP open a supported browser a...

Страница 40: ...n hand The management IP address of the system Licensed key information The worksheets that were completed during the system planning process Procedure To do the initial setup of your system use the m...

Страница 41: ...is system Use the management GUI to help you install any updates During the automatic update process each node canister in the system is updated one at a time After all the nodes in the system are suc...

Страница 42: ...22 SAN Volume Controller 8 3 1 Machine Types 2145 2147 Models SA2 SV2...

Страница 43: ...7 phone numbers for all products support From all Russian regions 7 800 200 6300 From Moscow 7 495 258 6300 Customer support Contracts orders status delivery inventory invoices and payments http www...

Страница 44: ...24 SAN Volume Controller 8 3 1 Machine Types 2145 2147 Models SA2 SV2...

Страница 45: ......

Страница 46: ...IBM Part Number 03GH323 1P P N 03GH323...

Отзывы: