Figure 71. Upper and lower cable-management arms
As Figure 72 on page 69 shows, the support rail connectors of each CMA assembly are installed on the
rail hooks at the end of the support rails.
Figure 72. Upper and lower cable-management arms
Procedure
1. Remove the loop straps from the upper and lower CMA assemblies. The straps are used only for
shipping.
Installing the upper CMA assembly
Figure 73 on page 70 shows the connectors on the upper CMA assembly.
Chapter 4. Installing an optional 5U SAS expansion enclosure 69
Содержание SAN Volume Controller 2145-12F
Страница 1: ...IBM SAN Volume Controller Hardware Installation Guide IBM...
Страница 6: ...vi...
Страница 48: ...16 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 62: ...30 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 72: ...40 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 156: ...Figure 136 Connecting the SAS cables 124 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 168: ...136 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 176: ...144 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 178: ...146 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 182: ...150 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 192: ...160 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Страница 193: ......
Страница 194: ...IBM...