![IBM pSeries 670 Скачать руководство пользователя страница 93](http://html1.mh-extra.com/html/ibm/pseries-670/pseries-670_installation-manual_4208462093.webp)
I/O Subsystems (1 through 2) RIO-G Cabling to I/O Books, One I/O
Planar Loop Configuration
Note:
The following graphic applies to CECs with RIO-G, or bayonette retention, connections.
1
Primary Rack
4
First I/O Subsystem
2
Primary I/O Book
5
Secondary I/O Book
3
Second I/O Subsystem
Note:
The maximum number of I/O subsystems that can be attached in the one planar loop configuration is 2, or four
I/O planars. Only eight RIO or RIO-G ports are available in the CEC. The last two CEC RIO ports must only be used
for single I/O planar loop connections.
Appendix G. Subsystem Positioning and Cabling
77
Содержание pSeries 670
Страница 1: ...pSeries 670 Installation Guide SA38 0613 02 ERserver...
Страница 2: ......
Страница 3: ...pSeries 670 Installation Guide SA38 0613 02 ERserver...
Страница 8: ...vi Eserver pSeries 670 Installation Guide...
Страница 12: ...x Eserver pSeries 670 Installation Guide...
Страница 14: ...xii Eserver pSeries 670 Installation Guide...
Страница 22: ...6 Eserver pSeries 670 Installation Guide...
Страница 42: ...26 Eserver pSeries 670 Installation Guide...
Страница 52: ...36 Eserver pSeries 670 Installation Guide...
Страница 56: ...40 Eserver pSeries 670 Installation Guide...
Страница 78: ...62 Eserver pSeries 670 Installation Guide...
Страница 84: ...68 Eserver pSeries 670 Installation Guide...
Страница 96: ...80 Eserver pSeries 670 Installation Guide...
Страница 104: ...88 Eserver pSeries 670 Installation Guide...
Страница 124: ...108 Eserver pSeries 670 Installation Guide...
Страница 127: ......
Страница 128: ...Part Number 00P5809 Printed in U S A May 2003 SA38 0613 02 1P P N 00P5809...