![IBM Power Systems 7063-CR1 Скачать руководство пользователя страница 74](http://html1.mh-extra.com/html/ibm/power-systems-7063-cr1/power-systems-7063-cr1_service-manual_3330678074.webp)
Replacing the USB cable and connector in the 7063-CR1
Learn how to replace the USB cable and connector in the IBM 7063-CR1 Hardware Management Console
systems.
Procedure
1.
Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2.
Route the USB and serial cables in through the front of the system, then slide the USB cable and
connector into of the front of the system as shown in Figure 62 on page 59, until it clicks into place.
The serial cable is non-functional, and may not be included in your system.
Figure 61. Removing the USB cable and connector
58
Power Systems: Servicing the 7063-CR1 Hardware Management Console system
Содержание Power Systems 7063-CR1
Страница 1: ...Power Systems Servicing the 7063 CR1 Hardware Management Console system IBM ...
Страница 2: ......
Страница 3: ...Power Systems Servicing the 7063 CR1 Hardware Management Console system IBM ...
Страница 16: ...xiv Power Systems Servicing the 7063 CR1 Hardware Management Console system ...
Страница 76: ...60 Power Systems Servicing the 7063 CR1 Hardware Management Console system ...
Страница 97: ...Figure 72 Connecting the power cords to the system Common procedures for servicing the 7063 CR1 81 ...
Страница 98: ...82 Power Systems Servicing the 7063 CR1 Hardware Management Console system ...
Страница 110: ...94 Power Systems Servicing the 7063 CR1 Hardware Management Console system ...
Страница 111: ......
Страница 112: ...IBM Printed in USA ...