Figure 3. Pushing the rails into the rear rack flanges until they click into place
3. Swivel the rail retention bracket out (3) and pull the front of the rail toward the front of the rack, until
the pins are aligned with the correct holes in the rack (4).
Installing the IBM Power System S914 (9009-41A) 5
Содержание Power System S914
Страница 1: ...Power Systems Installing the IBM Power System S914 9009 42A IBM GI11 9904 05...
Страница 4: ...iv...
Страница 14: ...xiv Power Systems Installing the IBM Power System S914 9009 42A...
Страница 47: ......
Страница 48: ...IBM Part Number 29R2418 GI11 9904 05 1P P N 29R2418...