background image

– For racks with AC power, connect all power cords to a properly wired and grounded electrical

outlet. Ensure that the outlet supplies proper voltage and phase rotation according to the system
rating plate.

– For racks with a DC power distribution panel (PDP), connect the customer’s DC power source to

the PDP. Ensure that the proper polarity is used when attaching the DC power and DC power
return wiring.

v

Connect any equipment that will be attached to this product to properly wired outlets.

v

When possible, use one hand only to connect or disconnect signal cables.

v

Never turn on any equipment when there is evidence of fire, water, or structural damage.

v

Do not attempt to switch on power to the machine until all possible unsafe conditions are corrected.

v

Assume that an electrical safety hazard is present. Perform all continuity, grounding, and power checks
specified during the subsystem installation procedures to ensure that the machine meets safety
requirements.

v

Do not continue with the inspection if any unsafe conditions are present.

v

Before you open the device covers, unless instructed otherwise in the installation and configuration
procedures: Disconnect the attached AC power cords, turn off the applicable circuit breakers located in
the rack power distribution panel (PDP), and disconnect any telecommunications systems, networks,
and modems.

DANGER:

v

Connect and disconnect cables as described in the following procedures when installing, moving, or
opening covers on this product or attached devices.
To Disconnect:

1.

Turn off everything (unless instructed otherwise).

2.

For AC power, remove the power cords from the outlets.

3.

For racks with a DC power distribution panel (PDP), turn off the circuit breakers located in the
PDP and remove the power from the Customer's DC power source.

4.

Remove the signal cables from the connectors.

5.

Remove all cables from the devices.

To Connect:

1.

Turn off everything (unless instructed otherwise).

2.

Attach all cables to the devices.

3.

Attach the signal cables to the connectors.

4.

For AC power, attach the power cords to the outlets.

5.

For racks with a DC power distribution panel (PDP), restore the power from the Customer's DC
power source and turn on the circuit breakers located in the PDP.

6.

Turn on the devices.

Sharp edges, corners and joints may be present in and around the system. Use care when handling
equipment to avoid cuts, scrapes and pinching. (D005)

(R001 part 1 of 2)

:

DANGER:

Observe the following precautions when working on or around your IT rack system:

v

Heavy equipment–personal injury or equipment damage might result if mishandled.

v

Always lower the leveling pads on the rack cabinet.

v

Always install stabilizer brackets on the rack cabinet.

v

To avoid hazardous conditions due to uneven mechanical loading, always install the heaviest devices
in the bottom of the rack cabinet. Always install servers and optional devices starting from the bottom
of the rack cabinet.

v

Rack-mounted devices are not to be used as shelves or work spaces. Do not place objects on top of
rack-mounted devices. In addition, do not lean on rack mounted devices and do not use them to
stabilize your body position (for example, when working from a ladder).

vi

Power Systems: Installing the IBM Power System S824 (8286-42A)

Содержание Power System S824

Страница 1: ...Power Systems Installing the IBM Power System S824 8286 42A GI11 9905 06 IBM...

Страница 2: ......

Страница 3: ...Power Systems Installing the IBM Power System S824 8286 42A GI11 9905 06 IBM...

Страница 4: ...Notices manual G229 9054 and the IBM Environmental Notices and User Guide Z125 5823 This edition applies to IBM Power Systems servers that contain the POWER8 processor and to all associated models Cop...

Страница 5: ...t using an HMC 20 Setting up a preinstalled server 21 Prerequisite for installing the preinstalled server 21 Completing inventory for your preinstalled server 22 Removing the shipping bracket and conn...

Страница 6: ...iv Power Systems Installing the IBM Power System S824 8286 42A...

Страница 7: ...tional copies of safety information documentation can be obtained by calling the IBM Hotline at 1 800 300 8751 German safety information Das Produkt ist nicht f r den Einsatz an Bildschirmarbeitspl tz...

Страница 8: ...nect 1 Turn off everything unless instructed otherwise 2 For AC power remove the power cords from the outlets 3 For racks with a DC power distribution panel PDP turn off the circuit breakers located i...

Страница 9: ...mperatures will exceed the manufacturer s recommended ambient temperature for all your rack mounted devices v Do not install a unit in a rack where the air flow is compromised Ensure that air flow is...

Страница 10: ...e potential hazards v Verify that the route that you choose can support the weight of the loaded rack cabinet Refer to the documentation that comes with your rack cabinet for the weight of a loaded ra...

Страница 11: ...DANGER Rack mounted devices are not to be used as shelves or work spaces L002 L003 1 2 or 1 2 or 1 2 3 4 or Safety notices ix...

Страница 12: ...be equipped with multiple AC power cords or multiple DC power cables To remove all hazardous voltages disconnect all power cords and power cables L003 L007 CAUTION A hot surface nearby L007 L008 x Pow...

Страница 13: ...tacle Although shining light into one end and looking into the other end of a disconnected optical fiber to verify the continuity of optic fibers many not injure the eye this procedure is potentially...

Страница 14: ...rhanging load v Do not use on uneven surface incline or decline major ramps v Do not stack loads v Do not operate while under the influence of drugs or alcohol v Do not support ladder against LIFT TOO...

Страница 15: ...ing interfaces only Type 2 or Type 4 ports as described in GR 1089 CORE and require isolation from the exposed OSP cabling The addition of primary protectors is not sufficient protection to connect th...

Страница 16: ...xiv Power Systems Installing the IBM Power System S824 8286 42A...

Страница 17: ...The latest version of this document is maintained online see Installing the IBM Power System S824 8286 42A http www ibm com support knowledgecenter POWER8 p8egg p8egg_840_kickoff htm v To plan your s...

Страница 18: ...ntact information Determining and marking the location in the rack You might need to determine where to install the system unit into the rack To determine where to install the system unit into a rack...

Страница 19: ...unit 6 Repeat step 5 for the corresponding holes located on the left side of the rack 7 Go to the rear of the rack 8 On the right side find the EIA unit that corresponds to the bottom EIA unit marked...

Страница 20: ...mplete the following steps 1 Each slide rail is marked with either an R right or an L left when you look from the front Select the left slide rail bring it to the rear of the rack and locate the selec...

Страница 21: ...and insert three pins on the front of the rail into the holes within the selected EIA unit that were previously marked Lower the slide rail down 1 to engage the hook feature on the middle pin For det...

Страница 22: ...c control It does not increase or decrease your risk of receiving electric shock when using or working on electrical equipment v If you do not have an ESD wrist strap just prior to removing the produc...

Страница 23: ...procedure to install the cable management arm To install the cable management arm complete the following steps 1 Ensure that you have the following parts Item Description A Support arm B Cable manage...

Страница 24: ...d DOWN Ensure that the side labeled UP is facing upward and to the right 3 Locate the hole at the bottom inside corner of the L shaped cable management stop bracket B Position the unattached end of th...

Страница 25: ...into place For details see Figure 12 5 Slide the extension bracket E into the right slide rail until the spring loaded pin snaps into place For details see Figure 13 on page 10 Figure 11 Securing the...

Страница 26: ...e slot on the mounting bracket C Push the tab until the spring loaded latch snaps into place Slide the other cable management arm tab into the extension bracket E on the outside of the right slide rai...

Страница 27: ...u install in your primary partition and whether you install a Virtual I O Server VIOS in one of your logical partitions P7EF3502 2 1 D A C Figure 15 Sliding the cable management arm tab into the mount...

Страница 28: ...a subset of the web interface functions The ASCII terminal for the ASMI interface is available only when the system is in the standby state It is not available during the initial program load IPL or r...

Страница 29: ...er admin for the user ID and password 7 Change the default password when you are prompted 8 Press Enter until the server information appears You have completed the setup for an ASCII terminal and have...

Страница 30: ...d htm 3 If you are connecting a second HMC to your managed server connect it to the Ethernet port that is labeled HMC2 on the managed server 4 Continue with Cabling the server and connecting expansion...

Страница 31: ...e CD or DVD as the boot device a Select Select Boot Options and press Enter b Select Select Install Boot Device and press Enter c Select CD DVD and press Enter d Select the media type that corresponds...

Страница 32: ...DU A and E3 and E4 to PDU B Note Confirm that the system is in standby mode The green power status indicator on the front control panel is flashing and the dc out indicator lights on the power supplie...

Страница 33: ...required server d Select Actions View all actions Operations Change system Password For more information about setting passwords for the managed system by using the HMC Classic or HMC Enhanced interfa...

Страница 34: ...ystem f Click Change Licensed Internal Code for the current release g Select View system information and then click OK h In the Specify LIC Repository window select None Display current values and the...

Страница 35: ...dgecenter POWER8 p8efc p8efc_partition_template_concept htm v If you want to use an existing template from another source you can import that and use it For more information see Importing a partition...

Страница 36: ...are level on the managed system and to update the time of day complete the following steps a Access the Advanced System Management Interface ASMI For instructions see Accessing the ASMI without an HMC...

Страница 37: ...ttp www ibm com support knowledgecenter POWER8 p8ha5 fix_virtual_firm_ivm htm 6 If you have a stand alone server install the front door if necessary by completing the following steps a Hold the front...

Страница 38: ...er If you have incorrect missing or damaged parts consult any of the following resources v Your IBM reseller v IBM Rochester manufacturing automated information line at 1 800 300 8751 United States on...

Страница 39: ...the server a Plug the top two power cords into the power supply and attach the cables to the handles on the power supply with cable ties or hook and loop fasteners Figure 18 Removing the shipping bra...

Страница 40: ...lable Go to the instructions for the applicable console interface or terminal in the following table Table 4 Available console types Console type Operating system Logical partitions Cable required Cab...

Страница 41: ...POWER8 p8ecs p8ecs_locations htm To cable an ASCII terminal to the server complete the following steps 1 Using a serial cable that is equipped with a null modem connect the ASCII terminal to the seri...

Страница 42: ...navigation area click Updates 2 In the work area view and record the information that appears in the HMC Code Level section including the HMC version release Service Pack build level and base version...

Страница 43: ...ou are installing the Integrated Virtualization Manager For an AIX or Linux partition complete the following steps to change the partition boot mode 1 In the navigation area expand Power Restart Contr...

Страница 44: ...Use this procedure to route cables through the cable management arm and to connect expansion units To route cables through the cable management arm and to connect expansion units complete the followin...

Страница 45: ...vanced System Management Interface ASMI To access ASMI by using the HMC choose one of the following navigation options depending on the interface type of the HMC If you are using an HMC Classic or HMC...

Страница 46: ...to view system information c In the menu pod expand System Actions and then expand Updates d Select View System Information e Select a LIC repository from the list and click OK f When you have complet...

Страница 47: ...POWER8 p8hch p8hch_installvios htm 9 If you have a stand alone server install the front door if necessary by completing the following steps a Hold the front door at an approximate 120 degree angle to...

Страница 48: ...crocode with an Internet connection http www ibm com support knowledgecenter POWER8 p8ha5 fix_virtual_firm_ivm htm 5 If you have a stand alone server install the front door if necessary by completing...

Страница 49: ...x htm v Install the VIOS operating system For instructions see Installing VIOS http www ibm com support knowledgecenter POWER8 p8hch p8hch_installvios htm 4 If required update the system firmware v Fo...

Страница 50: ...34 Power Systems Installing the IBM Power System S824 8286 42A...

Страница 51: ...efore this statement may not apply to you This information could include technical inaccuracies or typographical errors Changes are periodically made to the information herein these changes will be in...

Страница 52: ...ta in sensitive or critical operations Users should periodically check IBM s support websites for updated information and fixes applicable to the system and related software Homologation statement Thi...

Страница 53: ...www ibm com able Privacy policy considerations IBM Software products including software as a service solutions Software Offerings may use cookies or other technologies to collect product usage inform...

Страница 54: ...to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense...

Страница 55: ...erence may occur in which case the user may be required to take corrective actions Japan Electronics and Information Technology Industries Association Statement This statement explains the Japan JIS C...

Страница 56: ...eed to perform practical action Electromagnetic Interference EMI Statement Taiwan The following is a summary of the EMI Taiwan statement above Warning This is a Class A product In a domestic environme...

Страница 57: ...g kann im Wohnbereich Funk St rungen verursachen in diesem Fall kann vom Betreiber verlangt werden angemessene Ma nahmen zu ergreifen und daf r aufzukommen Deutschland Einhaltung des Gesetzes ber die...

Страница 58: ...to an outlet on a circuit different from that to which the receiver is connected v Consult an IBM authorized dealer or service representative for help Properly shielded and grounded cables and connect...

Страница 59: ...tion Statement This statement explains the Japan JIS C 61000 3 2 product wattage compliance This statement explains the Japan Electronics and Information Technology Industries Association JEITA statem...

Страница 60: ...ohne Zustimmung von IBM ver ndert bzw wenn Erweiterungskomponenten von Fremdherstellern ohne Empfehlung von IBM gesteckt eingebaut werden Deutschland Einhaltung des Gesetzes ber die elektromagnetisch...

Страница 61: ...oprietary notices are preserved You may not make derivative works of these publications or reproduce distribute or display these publications or any portion thereof outside your enterprise without the...

Страница 62: ...46 Power Systems Installing the IBM Power System S824 8286 42A...

Страница 63: ......

Страница 64: ...IBM Part Number 01LK523 Printed in USA GI11 9905 06 1P P N 01LK523...

Отзывы: