Figure 72. Removing the cover
Installing the service access cover on a 9183-22X system
To replace the service access cover, complete the steps in this procedure.
About this task
Attention: For safety, airflow purposes and thermal performance, the service access cover must
be installed and fully seated before you power on the system.
Procedure
1. Place the cover (A) on the system unit such that the alignment pins on the cover are aligned to the
slots on the chassis. Slide the cover to the front of the system until the blue release latches (B) lock in
to place.
108 Power Systems: Installing the System and Ordered Parts for the IBM Power System IC922 (9183-22X)
Содержание Power System IC922
Страница 1: ...Power Systems Installing the System and Ordered Parts for the IBM Power System IC922 9183 22X IBM...
Страница 4: ...iv...
Страница 14: ...xiv Power Systems Installing the System and Ordered Parts for the IBM Power System IC922 9183 22X...
Страница 57: ...Figure 35 PCIe3 LP 2 port 25 10 Gb NIC RoCE SFP28 Adapter FC EC2T Installing and configuring the 9183 22X 43...
Страница 77: ...Figure 45 FC EK4L low profile NVIDIA T4 PCIe GPU accelerator adapter Installing and configuring the 9183 22X 63...
Страница 81: ...Figure 47 PCIe3 16 Gb 2 port Fibre Channel adapter FC EL43 and EN0B Installing and configuring the 9183 22X 67...
Страница 112: ...or or or 98 Power Systems Installing the System and Ordered Parts for the IBM Power System IC922 9183 22X...
Страница 130: ...or or or 116 Power Systems Installing the System and Ordered Parts for the IBM Power System IC922 9183 22X...
Страница 134: ...120 Power Systems Installing the System and Ordered Parts for the IBM Power System IC922 9183 22X...
Страница 145: ......
Страница 146: ...IBM...