![IBM Power System 9009-22G Скачать руководство пользователя страница 40](http://html1.mh-extra.com/html/ibm/power-system-9009-22g/power-system-9009-22g_manual_3365478040.webp)
5. Place the NVMe U.2 pass-thru card on an appropriate ESD surface.
Replacing an NVMe U.2 pass-thru card in the 9009-22G or 9223-22S system
To replace an NVMe U.2 pass-thru card in the system, complete the steps in this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Plug the NVMe cable into the connector port (J1) of the new or replacement NVMe U.2 pass-thru card.
Push the connector in until the connector latch clicks. See the following figure.
Figure 22. Connecting the NVMe cable to the NVMe U.2 pass-thru card
If you have one NVMe U.2 pass-thru card, it is installed in slot P1-C49 and a filler is in slot P1-C50.
The NVMe cable connects from port (J1) on the NVMe drive backplane to port (J1) on the NVMe
U.2 pass-thru card. See the following figure.
26 Power Systems: NVMe U.2 pass-thru cards for the 9009-22G or 9223-22S
Содержание Power System 9009-22G
Страница 1: ...Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S IBM...
Страница 4: ...iv...
Страница 14: ...xiv Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S...
Страница 33: ...Figure 16 Removing the power cords L003 or or NVMe U 2 pass thru card for the 9009 22G or 9223 22S 19...
Страница 49: ...Figure 30 Removing the power cords L003 or or NVMe U 2 pass thru card for the 9009 22G or 9223 22S 35...
Страница 64: ...50 Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S...
Страница 74: ...60 Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S...
Страница 75: ......
Страница 76: ...IBM...