![IBM Power System 9009-22G Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/ibm/power-system-9009-22g/power-system-9009-22g_manual_3365478036.webp)
Figure 17. Releasing the side latches
5. Attach the electrostatic discharge (ESD) wrist strap.
The ESD wrist strap must be connected to an unpainted metal surface until the service procedure is
completed, and if applicable, until the service access cover is replaced.
Attention:
• Attach an electrostatic discharge (ESD) wrist strap to the front ESD jack, to the rear ESD jack,
or to an unpainted metal surface of your hardware to prevent the electrostatic discharge from
damaging your hardware.
• When you use an ESD wrist strap, follow all electrical safety procedures. An ESD wrist strap
is used for static control. It does not increase or decrease your risk of receiving electric shock
when using or working on electrical equipment.
• If you do not have an ESD wrist strap, just prior to removing the product from ESD packaging
and installing or replacing hardware, touch an unpainted metal surface of the system for a
minimum of 5 seconds. If at any point in this service process you move away from the system,
it is important to again discharge yourself by touching an unpainted metal surface for at least
5 seconds before you continue with the service process.
6. Release the service access cover latch by pushing the release latch (A) in the direction shown.
7. Slide the cover (B) off the system unit. When the front of the service access cover clears the upper
frame ledge, lift the cover up and off the system unit.
22 Power Systems: NVMe U.2 pass-thru cards for the 9009-22G or 9223-22S
Содержание Power System 9009-22G
Страница 1: ...Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S IBM...
Страница 4: ...iv...
Страница 14: ...xiv Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S...
Страница 33: ...Figure 16 Removing the power cords L003 or or NVMe U 2 pass thru card for the 9009 22G or 9223 22S 19...
Страница 49: ...Figure 30 Removing the power cords L003 or or NVMe U 2 pass thru card for the 9009 22G or 9223 22S 35...
Страница 64: ...50 Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S...
Страница 74: ...60 Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S...
Страница 75: ......
Страница 76: ...IBM...