10
10
IBM Global Technology Services
© 2010 IBM Corporation
Peak Interactive Processor – with Trend Projections
Peak Interactive Processor – with Trend Projections
The Peak Interactive Processor – with Trend Projections graph shows the average processor utilization for
interactive jobs (Job type = I) during the last thirteen months. It also shows the corresponding CPW value used
for the two busiest hours for the shift during the period.
The right hand three columns project growth for the next three months based on the previous 3, 6 and 12
month growth history.
The information under the Facts heading at the bottom of the graph outlines the recommended guidelines for
marginal and critical percentage.