12
IBM Netfinity FAStT500 RAID Controller Enclosure Unit User’s Reference
Turning on the power
Use the following procedure to turn on power to the controller unit. If you are restoring
power to the controller unit after an emergency shutdown or power outage, go to
"Overtemperature condition and power supply shutdown" on page 22
Important: You must turn on the drive enclosures before, or at the same time as, the
controller unit. The controllers might not recognize the correct configuration
if the attached drives are powered up after the controller unit. If you plan to
use the main breaker to turn on all enclosures at the same time, make sure
that the switches on each drive enclosure and each controller unit are on
before turning on the main breaker. For instructions on powering up the drive
enclosures, refer to the drive enclosure documentation.
Note: Always wait at least 30 seconds between the time you turn off a power switch and
the time you turn on the power again.
Turn on both power switches on the back of the controller unit (see
). You must
turn on both switches to take advantage of the redundant power supplies. Then, go to
"Checking the indicator lights" on page 15
Figure 8. Turning on and off the power
ac power cord
Power switch
Power switch
ac power cord
Содержание Netfinity FASt T500
Страница 1: ......
Страница 2: ......
Страница 3: ...Netfinity FAStT500 RAID Controller Enclosure Unit User s Reference...
Страница 12: ...x IBM Netfinity FAStT500 RAID Controller Enclosure Unit User s Reference...
Страница 16: ...xiv IBM Netfinity FAStT500 RAID Controller Enclosure Unit User s Reference...
Страница 20: ...xviii IBM Netfinity FAStT500 RAID Controller Enclosure Unit User s Reference...
Страница 28: ...8 IBM Netfinity FAStT500 RAID Controller Enclosure Unit User s Reference...
Страница 48: ...28 IBM Netfinity FAStT500 RAID Controller Enclosure Unit User s Reference...
Страница 91: ...Part Number 19K8461 Printed in U S A April 2000 19K8461...