3. Unscrew and remove the quantity-4 rail kit rear-mounting bracket screws to adjust the rack post-to-
post distance for the left rail subassembly.
4. Relocate the left rail mounting bracket to approximately match the rack post-to-post distance
recorded in Step 1, above.
This bracket has one inch of available adjustment after the screws are secured. After torquing the
quantity-4 screws removed in Step 3, verify that the bracket can be adjusted to the exact rack post-
to-post distance determined in Step 1. Torque to 1.36 N-m (12 lbf-in)
5. Repeat Step 1 through Step 4 for the right outer rail subassembly.
Chapter 4. Installation 31
Содержание Medium J11
Страница 15: ...European Community and Morocco Notice Germany Notice Safety and environmental notices xv...
Страница 102: ...82 IBM Cloud Object Storage System Medium Large J11 J12 Disk Enclosure Hardware Installation and Maintenance Manual...
Страница 103: ......
Страница 104: ...IBM...