background image

Note: The rails are not designed to hold an enclosure that is partially inserted. Always

fully insert the enclosure in the rack.

4. Secure the enclosure with a screw in each of the rack mounting screw holes.
5. Reinstall the left and right end caps.

a. Ensure that the serial number of the end cap matches the serial number on the rear of the

enclosure.

b. Fit the slot on the top of the end cap over the tab on the chassis flange.
c. Rotate the end cap down until it snaps into place.
d. Ensure that the inside surface of the end cap is flush with the chassis.

Note: Indicator windows on the left end cap align with the status LEDs (light-emitting

diodes) on the edge of the enclosure.

Connecting SAS cables

This task applies if you are installing one or more SAS-attached 2U expansion enclosures to your system.

About this task
For information about 5U expansion enclosures, see IBM Documentation (

https://ibm.biz/BdqxdY

) for your product. The following table

summarizes the supported SAS chains and enclosures for each system. Follow the guidelines to ensure that your configuration is valid.

System

Onboard SAS Ports

SAS Chains Expansion Enclosures per Chain

I/O Groups

Maximum Enclosures

FlashSystem 5015

Port 1 only

1

2U enclosure (10)

5U enclosure (4)

1

2U enclosure (10)

5U enclosure (4)

the FlashSystem 5035

Port 1 and Port 2

2

2U enclosure (10)

5U enclosure (4)

2

2U enclosure (40)

5U enclosure (16)

Procedure
1. 
Using the supplied SAS cables, complete the following steps to connect the control enclosure to the expansion enclosure.

a) Connect SAS port 1 of the left node canister in the control enclosure to SAS port 1 of the left expansion canister in the first expansion

enclosure.

b) Connect SAS port 1 of the right node canister in the control enclosure to SAS port 1 of the right expansion canister in the first

expansion enclosure.

2. On the FlashSystem 5035 systems, complete the following steps to add a second expansion chain.

a) Connect SAS port 2 of the left node canister in the control enclosure to SAS port 1 of the left expansion canister in the second

expansion enclosure.

b) Connect SAS port 2 of the right node canister in the control enclosure to SAS port 1 of the right expansion canister in the second

expansion enclosure.

3. If more expansion enclosures are installed, connect each one to the previous expansion enclosure in a chain.

Results
The following figures show SAS connections between 2U expansion enclosures and each system. SAS chain one (1) is below the control

enclosure. If the system supports a second SAS chain, SAS chain two (2) is above the controle enclosure.

6

Содержание FlashSystem 5000

Страница 1: ...F Control Enclosure 2072 2N4 2072 W24 2072 3N4 2072 X24 Important This document is intended to be used by persons who are experienced with installing these systems Before you use this information and...

Страница 2: ...ce adapter can be used for iSCSI connections only Ethernet cable standards The following table describes Ethernet cable standards Ethernet cables are not supplied as part of your order Ensure the cabl...

Страница 3: ...t Node Canister 2 Port 1 Port 2 Port 3 Port 4 Port 1 Port 2 Port 3 Port 4 Switch Port Speed Management and service address worksheet Use the following table to record the management address and servic...

Страница 4: ...ins Cables if they were ordered for the type of networking adapter that is installed in each node canister Two power cables Installing support rails for the system Before you install a control enclosu...

Страница 5: ...Repeat Step 2 on page 4 through Step 10 on page 5 to secure the opposite rail to the rack cabinet 12 Repeat the procedure to install the rails for each additional control enclosure Installing enclosu...

Страница 6: ...stem 5015 Port 1 only 1 2U enclosure 10 5U enclosure 4 1 2U enclosure 10 5U enclosure 4 the FlashSystem 5035 Port 1 and Port 2 2 2U enclosure 10 5U enclosure 4 2 2U enclosure 40 5U enclosure 16 Proced...

Страница 7: ...rnet switch for host iSCSI connectivity IP replication or to act as a second management port 3 12 Gb SAS SAS Expansion only Ethernet Port 2 Do not connect onboard port 2 to an Ethernet switch until th...

Страница 8: ...y to the system by hosts on the network If the system contains more than one control enclosure ensure that port 2 of every node canister is connected to the same network to provide access if the confi...

Страница 9: ...ower LED is on 1 Status LED is blinking 2 Fault LED is off 3 Front of the control enclosure left end cap Node operational LED is on Identify node LED is off default Node fault LED is off Initializing...

Страница 10: ...that you provided in Management and service address worksheet on page 3 6 If you experience a problem during the process due to a change in system states wait 5 10 seconds Then either reopen the SSH...

Страница 11: ...u install and use the product Suitability for telecommunication environment This product is not intended to connect directly or indirectly by any means whatsoever to interfaces of public telecommunica...

Страница 12: ...riting to IBM Director of Licensing IBM Corporation North Castle Drive Armonk NY 10504 1785 U S A For license inquiries regarding double byte character set DBCS information contact the IBM Intellectua...

Страница 13: ...platform for which the sample programs are written These examples have not been thoroughly tested under all conditions IBM therefore cannot guarantee or imply reliability serviceability or function o...

Страница 14: ...t eingebaut werden EN 55032 Klasse A Ger te m ssen mit folgendem Warnhinweis versehen werden Warnung Dieses ist eine Einrichtung der Klasse A Diese Einrichtung kann im Wohnbereich Funk St rungen verur...

Страница 15: ...an 20 A single phase This statement applies to products greater than 20 A per phase three phase Japan Voluntary Control Council for Interference VCCI Notice Korea Notice People s Republic of China Not...

Страница 16: ...nectors or by unauthorized changes or modifications to this equipment Unauthorized changes or modifications could void the user s authority to operate the equipment This device complies with Part 15 o...

Страница 17: ...s Produkt entspricht dem Gesetz ber die elektromagnetische Vertr glichkeit von Ger ten EMVG Dies ist die Umsetzung der EU Richtlinie 2014 30 EU in der Bundesrepublik Deutschland Zulassungsbescheinigun...

Страница 18: ...products greater than 20 A single phase This statement applies to products greater than 20 A per phase three phase Japan Voluntary Control Council for Interference VCCI Notice Taiwan Notice IBM Taiwa...

Страница 19: ...its Proper cables and connectors are available from IBM authorized dealers IBM is not responsible for any radio or television interference caused by using other than recommended cables and connectors...

Отзывы: