1. Server Group : Identify the server group (_) that is being defined by this work
sheet.
2. Command Line Interface Host 1 IP Address
Enter the dotted decimal address you are assigning to Command Line Interface
Host 1. For example,
9.113.152.151
.
Command Line Interface Host 1 Hostname
Enter the hostname that you are assigning to Command Line Interface 1 for
access over the network. For example,
Storage04.company.com
.
3. Command Line Interface Host 2 IP Address
Enter the dotted decimal address you are assigning to Command Line Interface
Host 1. For example,
9.113.152.153
.
Command Line Interface Host 2 Hostname
Enter the hostname that you are assigning to Command Line Interface 2 for
access over the network. For example,
Storage01.company.com
.
4. Command Line Interface Host 3 IP Address
Enter the dotted decimal address you are assigning to Command Line Interface
Host 1. For example,
9.113.152.154
.
Command Line Interface Host 3 Hostname
Enter the hostname that you are assigning to Command Line Interface 3 for
access over the network. For example,
Storage02.company.com
.
5. Command Line Interface Host 4 IP Address
Enter the dotted decimal address you are assigning to Command Line Interface
Host 1. For example,
9.113.152.155
.
Command Line Interface Host 4 Hostname
Enter the hostname that you are assigning to Command Line Interface 4 for
access over the network. For example,
Storage03.company.com
.
6. ESSNet workstation Internet address
Enter the Internet address that you are assigning to ESSNet for access over the
network. For example,
555.555.555.0
.ESSNet workstation hostname
Enter the hostname that you are assigning to ESSNet for access over the
network. For example,
ESSNet1
.
Disaster Recovery Considerations for Copy Services
If a disaster or emergency situation at your primary production site causes you to
lose connections to the Copy Services primary server, you must manually switch
control to your recovery site. ESS Web Copy Services code copies tasks
synchronously between the primary and backup servers, but there are some steps
you should consider in planning for disaster recovery, and in implementing
procedures following a disaster.
Preparing for a disaster
Planning for a disaster requires some additional steps for PPRC. First, decide
where to place your primary and backup ESS Web Copy Services servers. There
are two options:
1. Primary Copy Services server is at your recovery site
Choosing this configuration can gain you some efficiency in terms of recovering
from a disaster. Because the primary server is at the recovery site, you do not
have to perform manual recovery steps to switch to a different Web Copy
76
ESS Introduction and Planning
Содержание Enterprise Storage Server 2105 E10
Страница 2: ......
Страница 8: ...vi ESS Introduction and Planning ...
Страница 10: ...viii ESS Introduction and Planning ...
Страница 12: ...x ESS Introduction and Planning ...
Страница 14: ...xii ESS Introduction and Planning ...
Страница 22: ...xx ESS Introduction and Planning ...
Страница 24: ...xxii ESS Introduction and Planning ...
Страница 48: ...24 ESS Introduction and Planning ...
Страница 72: ...48 ESS Introduction and Planning ...
Страница 88: ...64 ESS Introduction and Planning ...
Страница 108: ...84 ESS Introduction and Planning ...
Страница 112: ...88 ESS Introduction and Planning ...
Страница 118: ...94 ESS Introduction and Planning ...
Страница 155: ......
Страница 156: ...IBMR Printed in the United States of America on recycled paper containing 10 recovered post consumer fiber GC26 7294 05 ...