Chapter 2. Installing and replacing a high speed switch module
9
•
Configuration requirements for the switch module and the BladeCenter unit might vary. You
can obtain up-to-date information about the switch module and the BladeCenter unit at
http://www.ibm.com/systems/bladecenter/
.
Installation guidelines
Before you install the switch module in the BladeCenter unit, read the following information:
•
Read the safety information that begins on page v,
“Handling static-sensitive devices”
on
page 10, and the safety statements in the BladeCenter unit documentation. This information
will help you work safely.
•
Observe good housekeeping in the area where you are working. Place removed covers and
other parts in a safe place.
•
Blue on a component indicates touch points, where you can grip the component to remove it
from or install it in the blade server or BladeCenter unit, open or close a latch, and so on.
•
Orange on a component or an orange label on or near a component on the switch module,
blade server, or BladeCenter unit indicates that the component can be hot-swapped, which
means that if the BladeCenter unit and operating system support hot-swap capability, you can
remove or install the component while the BladeCenter unit is running. (Orange can also
indicate touch points on hot-swap components.) See the instructions for removing or installing
a specific hot-swap component for any additional procedures that you might have to perform
before you remove or install the component.
•
You do not have to turn off the BladeCenter unit to install or replace any of the hot-swap
modules on the front or rear of the BladeCenter unit.
•
When you install a switch module in the BladeCenter unit, you must also install a compatible
I/O expansion card in the blade server to support the switch module.
•
When you are finished working on the blade server or BladeCenter unit, reinstall all safety
shields, guards, labels, and ground wires.
•
For a list of supported optional devices for the BladeCenter unit and other IBM products, see
http://www.ibm.com/servers/eserver/serverproven/compat/us/
.
System reliability guidelines
To help ensure proper cooling, performance, and system reliability, make sure that the following
requirements are met:
•
Each of the module bays on the rear of the BladeCenter unit contains either a module or a filler
module.
•
A removed hot-swap module is replaced with an identical module or filler module within 1
minute of removal.
•
A removed hot-swap blade server is replaced with another blade server or filler blade within 1
minute of removal.
•
The ventilation areas on the sides of the blade server power modules and blowers are not
blocked.
•
You have followed the reliability guidelines in the documentation that comes with the
BladeCenter unit.
Содержание Brocade FCoE
Страница 1: ...Brocade FCoE Switch Module for IBM BladeCenter Installation and User s Guide ...
Страница 2: ......
Страница 8: ...viii Brocade FCoE Switch Module for IBM BladeCenter Installation and User Guide ...
Страница 14: ...xiv Brocade FCoE Switch Module for IBM BladeCenter Installation and User Guide ...
Страница 28: ...14 Brocade FCoE Switch Module for IBM BladeCenter Installation and User Guide ...
Страница 52: ...38 Brocade FCoE Switch Module for IBM BladeCenter Installation and User Guide ...
Страница 56: ...42 Brocade FCoE Switch Module for IBM BladeCenter Installation and User Guide ...
Страница 70: ...56 Brocade FCoE Switch Module for IBM BladeCenter Installation and User Guide ...
Страница 74: ...60 Brocade FCoE Switch Module for IBM BladeCenter Installation and User Guide ...
Страница 75: ...1 ...
Страница 76: ...2 Part Number 60Y1582 Printed in USA IP P N 60Y1582 60Y1582 ...