IBM BladeCenter PN41 Скачать руководство пользователя страница 45

Protective

cap

XFP

module

Wire

tab

5.

   

Grasp

 

the

 

wire

 

tab

 

on

 

the

 

XFP

 

module

 

and

 

pull

 

it

 

out

 

of

 

the

 

port.

 

6.

   

Replace

 

the

 

protective

 

cap

 

on

 

the

 

XFP

 

module.

 

7.

   

Place

 

the

 

XFP

 

module

 

into

 

a

 

static-protective

 

package.

Replacing

 

an

 

XFP

 

module

 

To

 

install

 

an

 

XFP

 

module,

 

complete

 

the

 

following

 

steps:

 

1.

   

Read

 

the

 

safety

 

information

 

that

 

begins

 

on

 

page

 

v

 

and

 

“Installation

 

guidelines”

 

on

 

page

 

25.

 

2.

   

If

 

you

 

have

 

not

 

already

 

done

 

so,

 

touch

 

the

 

static-protective

 

package

 

that

 

contains

 

the

 

XFP

 

module

 

to

 

an

 

unpainted

 

metal

 

surface

 

of

 

the

 

BladeCenter

 

unit

 

or

 

an

 

unpainted

 

metal

 

surface

 

on

 

any

 

other

 

grounded

 

rack

 

component

 

in

 

the

 

rack

 

in

 

which

 

you

 

are

 

installing

 

the

 

XFP

 

module

 

for

 

at

 

least

 

2

 

seconds.

 

3.

   

Read

 

the

 

information

 

in

 

“Handling

 

a

 

transceiver

 

module”

 

on

 

page

 

31.

 

4.

   

Remove

 

the

 

XFP

 

module

 

from

 

its

 

static-protective

 

package.

 

5.

   

Remove

 

the

 

protective

 

cap

 

from

 

the

 

XFP

 

module

 

and

 

store

 

the

 

cap

 

in

 

a

 

safe

 

place.

 

Attention:

  

To

 

avoid

 

damage

 

to

 

the

 

cable

 

or

 

the

 

XFP

 

module,

 

do

 

not

 

connect

 

the

 

fiber-optic

 

cable

 

before

 

you

 

install

 

the

 

XFP

 

module.

 

6.

   

Insert

 

the

 

XFP

 

module

 

into

 

the

 

XFP

 

module

 

port

 

in

 

the

 

front

 

of

 

the

 

DPI

 

blade

 

until

 

it

 

clicks

 

into

 

place.

 

  

  

7.

   

Connect

 

the

 

fiber-optic

 

cable

 

and

 

any

 

other

 

cables

 

that

 

you

 

disconnected

 

earlier.

 

See

 

“Connecting

 

the

 

transceiver

 

module

 

cable”

 

on

 

page

 

35

 

for

 

more

 

information.

Replacing

 

a

 

1

 

Gb

 

SFP

 

module

 

When

 

you

 

use

 

fiber-optic

 

SFP

 

modules,

 

the

 

SPF

 

modules

 

at

 

both

 

ends

 

of

 

the

 

cable

 

must

 

have

 

identical

 

wavelength

 

specifications,

 

and

 

the

 

cable

 

must

 

not

 

exceed

 

the

 

specified

 

length.

 

An

 

SFP

 

module

 

has

 

one

 

of

 

three

 

types

 

of

 

latching

 

devices

 

to

 

secure

 

and

 

detach

 

the

 

SFP

 

module.

 

Use

 

the

 

following

 

illustration

 

to

 

determine

 

 

Chapter

 

4.

 

Removing

 

and

 

replacing

 

DPI

 

blade

 

components

 

33

Содержание BladeCenter PN41

Страница 1: ...IBM BladeCenter PN41 Type 3020 Deep Packet Inspection Blade Problem Determination and Service Guide...

Страница 2: ......

Страница 3: ...IBM BladeCenter PN41 Type 3020 Deep Packet Inspection Blade Problem Determination and Service Guide...

Страница 4: ...Notices on page 65 and the Warranty and Support Information document on the IBM Documentation CD First Edition August 2008 Copyright International Business Machines Corporation 2008 US Government Use...

Страница 5: ...25 System reliability guideline 26 Handling static sensitive devices 26 Returning a device or component 26 Removing and replacing Tier 1 CRUs 27 Removing the DPI blade from the BladeCenter unit 27 In...

Страница 6: ...are service and support 64 Hardware service and support 64 IBM Taiwan product service 64 Appendix B Notices 65 Trademarks 66 Important notes 67 Product recycling and disposal 67 Battery return program...

Страница 7: ...n tuotteen lue turvaohjeet kohdasta Safety Information Avant d installer ce produit lisez les consignes de s curit Vor der Installation dieses Produkts die Sicherheitshinweise lesen Prima di installar...

Страница 8: ...ot damaged loose or broken and observe any sharp edges 3 Check the power cord v Make sure that the third wire ground connector is in good condition Use a meter to measure third wire ground continuity...

Страница 9: ...lable to turn off the power if necessary When you are working with powered on electrical equipment use only one hand Keep the other hand in your pocket or behind your back to avoid creating a complete...

Страница 10: ...r structural damage v Disconnect the attached power cords telecommunications systems networks and modems before you open the device covers unless instructed otherwise in the installation and configura...

Страница 11: ...result in hazardous radiation exposure DANGER Some laser products contain an embedded Class 3A or Class 3B laser diode Note the following Laser radiation when open Do not stare into the beam do not v...

Страница 12: ...x IBM BladeCenter PN41 Type 3020 Deep Packet Inspection Blade Problem Determination and Service Guide...

Страница 13: ...ical information about setting up and configuring the DPI blade v Important Notices This printed document is included with the DPI blade It contains warranty information safety information and environ...

Страница 14: ...anger statements in this document are also in the multilingual Safety Information document which is on the IBM Documentation CD Each statement is numbered for reference to the corresponding statement...

Страница 15: ...DPI blade contains a regular expression accelerator to speed up searches Front 10 Gb connector XFP connection to 10 Gb Ethernet optical SFP module port Front 1 Gb SFP port which can be used for data c...

Страница 16: ...terface or through IBM Director Console Information LED When this amber LED is lit it indicates that information about a system error in the DPI blade has been placed in the management module event lo...

Страница 17: ...on the DPI blade through the ASM While the service processor is initializing communications with the advanced management module the power on LED flashes rapidly and the power button on the DPI blade d...

Страница 18: ...ew CPOS version You will still be able to install applications in a different version of CPOS that is compatible with the firmware version See the CPOS download documentation on the IBM Documentation...

Страница 19: ...ng an Integrated Development Environment v An IBM advanced management module installed in the BladeCenter unit v CloudShield PacketWorks Operating System CPOS software download v A remote console with...

Страница 20: ...are ESX Server virtual machine Create a virtual switch for the DPPM network Select Red Hat Enterprise Linux 4 as the operating system type Select one processor with 1024 MB of memory Select two NICs o...

Страница 21: ...nd the VLAN ID are shown for illustrative purposes only DPI blade IP addresses Use this table to record the IP addresses that you set during configuration You will need these IP addresses when you set...

Страница 22: ...installation specify a user name and password and assign an IP address to the host blade server Record this IP address in DPI blade IP addresses on page 9 3 Install VMware Virtual Infrastructure Clie...

Страница 23: ...he NIC 1 field select VM Network In the NIC 2 field select DPPM Network i Select the Connect at Power On check box for each NIC Click Next j Select LSI Logic Click Next k Select Create a new virtual d...

Страница 24: ...virtual machine a See CPOS download for the IBM PN41 DPI blade on the IBM Documentation CD For more information about installing an image under VMware or for alternative methods see http www vmware c...

Страница 25: ...er 1 httpsAccess enabled httpAccess enabled ipaddress netmask and gateway are the IP address netmask and gateway that are to be assigned to the virtual machine Record these IP addresses in DPI blade I...

Страница 26: ...ment VLAN State menu select enabled m Add the ports that are associated with the host blade server and the DPI blade to the Ports in Vlan list n Add the MGT1 and MGT2 ports to the Ports in Vlan list o...

Страница 27: ...pecified in step 4f r Click Submit Click Apply Click Save s Log in to the advanced management module and select Chassis Internal Network from the left pane Make sure that the status is Operational and...

Страница 28: ...lete d Select Terminate existing session and login as you are Click Apply e Click the General tab Make sure that the binding status is Available and then click Bind f Click Modify g In the IP Address...

Страница 29: ...m the CPOS Interface menu select the ASM eth1 IP address In the DPPM IP Address field type an IP address of the DPPM on the same subnetwork as the CPOS interface Ethernet device Click Assign Chapter 2...

Страница 30: ...nding status is Assigned l Turn on the DPPM modules 1 Click the Hardware tab 2 Click DPPM 3 Select Power On and click Apply 18 IBM BladeCenter PN41 Type 3020 Deep Packet Inspection Blade Problem Deter...

Страница 31: ...e FPGA upgrade process Applications will not be installed until the FPGA upgrade is complete To see the current status of the upgrade process click Update Now The upgrade process can take up to 10 min...

Страница 32: ...stall the application to the DPI blade Notes 1 The installation process can take up to 10 minutes 2 The pn41_diag csm application is the diagnostics application that comes with the DPI blade 3 The dro...

Страница 33: ...king ports according to your installed applications Table 2 Networking ports Switch module bay DPI blade port 0 front XFP 7 1 8 3 9 2 10 4 15 front SFP c Click the port that you want to enable and cli...

Страница 34: ...22 IBM BladeCenter PN41 Type 3020 Deep Packet Inspection Blade Problem Determination and Service Guide...

Страница 35: ...ly from your hardware Replaceable components are of three types v Tier 1 customer replaceable unit CRU Replacement of Tier 1 CRUs is your responsibility If IBM installs a Tier 1 CRU at your request yo...

Страница 36: ...Form Factor Pluggable Module XFP Module Short Range Fiber XFP Transceiver 32R1883 IBM PN41 Deep Packet Inspection Blade 46C7014 Label system service 46C7186 Label FRU 46C7187 24 IBM BladeCenter PN41...

Страница 37: ...blade is ready to function at maximum levels of performance To download firmware updates for your DPI blade complete the following steps Note Changes are made periodically to the IBM Web site The act...

Страница 38: ...e ESD connector on the front or back of the BladeCenter unit v Limit your movement Movement can cause static electricity to build up around you v Handle the device carefully holding it by its edges or...

Страница 39: ...onsequences Some configuration information and update options are established according to bay number if you reinstall the DPI blade into a different bay you might have to reconfigure the DPI blade To...

Страница 40: ...ade Notes v If you reinstall a DPI blade into the same blade bay from which you removed it the DPI blade automatically rebinds with the host blade server Some DPI blade configuration information and u...

Страница 41: ...ade See Turning on the DPI blade on page 5 for more information 7 Make sure that the power on LED on the DPI blade control panel is lit continuously indicating that the DPI blade is receiving power an...

Страница 42: ...the DPI blade from the BladeCenter unit on page 27 for instructions 3 Carefully lay the DPI blade on a flat static protective surface with the cover side up 4 Press the blade cover release on each si...

Страница 43: ...n in the illustration 5 Pivot the cover to the closed position as shown in the illustration until it clicks into place Removing and replacing transceiver modules This section provides instructions for...

Страница 44: ...tly with optical instruments and avoid direct exposure to the beam Class 1 Laser Product Laser Klasse 1 Laser Klass 1 Luokan 1 Laserlaite Appareil A Laser de Classe 1 Removing an XFP module To remove...

Страница 45: ...31 4 Remove the XFP module from its static protective package 5 Remove the protective cap from the XFP module and store the cap in a safe place Attention To avoid damage to the cable or the XFP modul...

Страница 46: ...Before you install the SFP module in the switch module read the following information v Read the safety information that begins on page v Installation guidelines on page 25 and Handling static sensiti...

Страница 47: ...optic cable from the transceiver module 2 Replace the protective caps on the ends of the fiber optic cable Connecting the transceiver module cable Attention To avoid damage to the fiber optic cables f...

Страница 48: ...ting correctly the green link LED is lit Removing the bezel assembly The following illustration shows how to remove the bezel from the DPI blade Control panel connector Bezel assembly release both sid...

Страница 49: ...de 9 If you are instructed to return the bezel follow all packaging instructions and use any packaging materials for shipping that are supplied to you Replacing the bezel assembly The following illust...

Страница 50: ...38 IBM BladeCenter PN41 Type 3020 Deep Packet Inspection Blade Problem Determination and Service Guide...

Страница 51: ...stic program circulates test packets to various processing elements and returns statistics about the processing of the packets v Troubleshooting tables These tables list problem symptoms and actions t...

Страница 52: ...are necessary to describe the DPI blade You can view this information from the Web Management Interface or the command line interface Important v A single problem might cause several error messages Wh...

Страница 53: ...l information In the advanced management module Web interface click MM Control Network Protocols to check the TCP connections 2 Make sure that your CIN and VLANs are configured correctly 3 Make sure t...

Страница 54: ...ake sure that the CIN and VLANs are configured correctly see the Installation and User s Guide for more information v Check the advanced management module event log for a Blade failed message v Reseat...

Страница 55: ...port icon Make sure that the admin state of the Ethernet port is Enabled and the link LED is green To verify the packets for the back port click Hardware Back Statistics and click the port icon Make...

Страница 56: ...Note None of the error counters should be incrementing v If there are errors restart the ASM and run the test again v Reseat the DPI blade and run the diagnostic test again v If errors remain there i...

Страница 57: ...58 If you cannot find a problem in these tables see Running the diagnostic programs on page 57 for information about testing the DPI blade If you have just added new software or a new optional device...

Страница 58: ...ll for service 52 Resource monitor Software Minor ASM maintenance tasks are completed such as log file rotation Message is for informational purposes only 133 SFP Mismatch Hardware Major The SFP plugg...

Страница 59: ...Port Attribute Change Hardware Informational Operator has changed an attribute of the specified port Message is for informational purposes only 6000 Capture Events Software Informational Information...

Страница 60: ...at the blade in the BladeCenter unit 2 Make sure that the control network is running 3 Make sure the DPI blade is receiving power 4 Check the binding parameters 5 Turn off the DPI blade Turn on the DP...

Страница 61: ...he application is critical then turn off the DPI blade 2 Use the show techsupport all CLI command to create a report then call for service See the CloudShield Command Line Interface Users Guide on the...

Страница 62: ...d Hardware Critical Does not apply to the DPI blade N A 7602 Module CPU disabled Hardware Critical ASM detected the CPU hardware in the DPI blade is not operational usually due to lack of power to the...

Страница 63: ...now bonded and has booted successfully Message is for informational purposes only 8001 Reboot command received Hardware Informational Operator rebooted the ASM or the DPPM Message is for informational...

Страница 64: ...ces see Solving shared BladeCenter resource problems on page 58 3 Refer to the following voltages table for more information 4 If the problem persists call for service System over temperature for xx c...

Страница 65: ...46 HSDC S MGT 1 0 0 98 0 94 1 05 HSDC S PLL 1 2 1 19 1 13 1 26 Intermittent problems v Follow the suggested actions in the order in which they are listed in the Action column until the problem is solv...

Страница 66: ...technician only that step must be performed only by a trained service technician Symptom Action The Power control unbind button does not work 1 Reseat the control panel connector 2 Replace the bezel...

Страница 67: ...eps a Turn off the DPI blade by pressing the power control unbind button for 4 seconds b If the DPI blade fails and the power control button does not work remove the DPI blade from the BladeCenter uni...

Страница 68: ...em 1 If you receive any error messages when you use the software see the information that comes with the software for a description of the messages and suggested solutions to the problem 2 Contact you...

Страница 69: ...ng normal server operations a software error might be the cause If you suspect a software problem see the information that comes with your software A single problem might cause more than one error mes...

Страница 70: ...e see the Problem Determination and Service Guide or the Hardware Maintenance Manual and Troubleshooting Guide for your BladeCenter unit and other BladeCenter component documentation for additional in...

Страница 71: ...ormation 4 Replace the management module see the documentation for your BladeCenter unit If these steps do not solve the problem it is likely a problem with the DPI blade See Network connection proble...

Страница 72: ...ion in this section If you suspect that a software problem is causing failures continuous or intermittent see Software problems on page 56 Check the LEDs on all the power supplies in the BladeCenter u...

Страница 73: ...inal reported failure or has this failure been reported before v Hardware configuration print screen of the system summary v CPOS code level v Operating system type and version level on the host blade...

Страница 74: ...62 IBM BladeCenter PN41 Type 3020 Deep Packet Inspection Blade Problem Determination and Service Guide...

Страница 75: ...agnostic tests that you can perform Most systems operating systems and programs come with documentation that contains troubleshooting procedures and explanations of error messages and error codes If y...

Страница 76: ...call 1 800 IBM SERV 1 800 426 7378 Hardware service and support You can receive hardware service through your IBM reseller or IBM Services To locate a reseller authorized by IBM to provide warranty s...

Страница 77: ...10504 1785 U S A INTERNATIONAL BUSINESS MACHINES CORPORATION PROVIDES THIS PUBLICATION AS IS WITHOUT WARRANTY OF ANY KIND EITHER EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES...

Страница 78: ...tates and or other countries Cell Broadband Engine is a trademark of Sony Computer Entertainment Inc in the United States other countries or both and is used under license therefrom Intel Intel Xeon I...

Страница 79: ...warranties with respect to non IBM products Support if any for the non IBM products is provided by the third party not IBM Some software might differ from its retail version if available and might not...

Страница 80: ...age applicables aux syst mes utilis s travers l Union europ enne Conform ment la directive ladite tiquette pr cise que le produit sur lequel elle est appos e ne doit pas tre jet mais tre r cup r en fi...

Страница 81: ...an Union Notice This mark applies only to countries within the European Union EU Batteries or packaging for batteries are labeled in accordance with European Directive 2006 66 EC concerning batteries...

Страница 82: ...Title 22 Division 4 5 Chapter 33 Best Management Practices for Perchlorate Materials This product part may include a lithium manganese dioxide battery which contains a perchlorate substance Electroni...

Страница 83: ...ingdom European Union EMC Directive conformance statement This product is in conformity with the protection requirements of EU Council Directive 2004 108 EC on the approximation of the laws of the Mem...

Страница 84: ...Chinese Class A warning statement Japanese Voluntary Control Council for Interference VCCI statement Korean Class A warning statement 72 IBM BladeCenter PN41 Type 3020 Deep Packet Inspection Blade Pro...

Страница 85: ...messages diagnostic 56 F FCC Class A notice 70 fiber optic cables installing 36 removing 35 firmware updates 6 G getting help 63 H handling fiber optic cables 35 static sensitive devices 26 hardware s...

Страница 86: ...tor pluggable module 32 software problems 56 software service and support 64 specifications BladeCenter PN41 3 starting the DPI blade 5 static electricity 26 static sensitive devices handling 26 stopp...

Страница 87: ......

Страница 88: ...Part Number 44R5180 Printed in USA 1P P N 44R5180...

Отзывы: