Figure 76. Reconnecting the signal cable and the power cable
3. Replace the air baffles. For instructions, see Replacing the air baffle (www.ibm.com/support/
knowledgecenter/POWER9/p9haj/p9haj_922_airbafflereplace.htm).
Preparing the 5105-22E, 9008-22L, 9009-22A, 9009-22G, 9223-22H, or 9223-22S
system for operation after removing and replacing the drive backplane signal cable
To prepare the system for operation after removing and replacing a drive backplane signal cable,
complete the steps in this procedure.
Procedure
1. Slide the service access cover (A) onto the system unit.
2. Close the release latch (B) by pushing it in the direction shown.
88 Power Systems: Power Systems: Drive backplane
Содержание 9009-22A
Страница 1: ...Power Systems Drive backplane for the 5105 22E 9008 22L 9009 22A 9009 22G 9223 22H or 9223 22S IBM...
Страница 4: ...iv...
Страница 14: ...xiv Power Systems Power Systems Drive backplane...
Страница 16: ...Figure 1 Removing the power cords L003 or or 2 Power Systems Power Systems Drive backplane...
Страница 80: ...66 Power Systems Power Systems Drive backplane...
Страница 82: ...Figure 61 Removing the power cords L003 or or 68 Power Systems Power Systems Drive backplane...
Страница 94: ...Figure 70 Removing the power cords L003 or or 80 Power Systems Power Systems Drive backplane...
Страница 115: ......
Страница 116: ...IBM...