background image

Power

 

problems

 

 

v

   

Follow

 

the

 

suggested

 

actions

 

in

 

the

 

order

 

in

 

which

 

they

 

are

 

listed

 

in

 

the

 

Action

 

column

 

until

 

the

 

problem

 

is

 

solved.

 

v

   

See

 

the

 

parts

 

listing

 

in

 

the

 

Problem

 

Determination

 

and

 

Service

 

Guide

 

to

 

determine

 

which

 

components

 

are

 

customer

 

replaceable

 

units

 

(CRU)

 

and

 

which

 

components

 

are

 

field

 

replaceable

 

units

 

(FRU).

 

v

   

If

 

an

 

action

 

step

 

is

 

preceded

 

by

 

“(Trained

 

service

 

technician

 

only),”

 

that

 

step

 

must

 

be

 

performed

 

only

 

by

 

a

 

trained

 

service

 

technician.

 

Symptom

 

Action

 

The

 

power-control

 

button

 

does

 

not

 

work,

 

and

 

the

 

reset

 

button

 

does

 

work

 

(the

 

server

 

does

 

not

 

start).

 

Note:

 

The

 

power-control

 

button

 

will

 

not

 

function

 

until

 

20

 

seconds

 

after

 

the

 

server

 

has

 

been

 

connected

 

to

 

ac

 

power.

 

1.

   

Make

 

sure

 

that

 

the

 

operator

 

information

 

panel

 

power-control

 

button

 

is

 

working

 

correctly:

 

a.

   

Disconnect

 

the

 

server

 

power

 

cords.

 

b.

   

Reconnect

 

the

 

power

 

cords.

 

c.

   

(Trained

 

service

 

technician

 

only)

 

Reseat

 

the

 

operator

 

information

 

panel

 

cables,

 

and

 

then

 

repeat

 

steps

 

1a

 

and

 

1b.

 

v

   

(Trained

 

service

 

technician

 

only)

 

If

 

the

 

server

 

starts,

 

reseat

 

the

 

operator

 

information

 

panel.

 

If

 

the

 

problem

 

remains,

 

replace

 

the

 

operator

 

information

 

panel.

 

v

   

(Trained

 

service

 

technician

 

only)

 

If

 

the

 

server

 

does

 

not

 

start,

 

bypass

 

the

 

operator

 

information

 

panel

 

power-control

 

button

 

by

 

using

 

the

 

force

 

power-on

 

jumper;

 

if

 

the

 

server

 

starts,

 

reseat

 

the

 

operator

 

information

 

panel.

 

If

 

the

 

problem

 

remains,

 

replace

 

the

 

operator

 

information

 

panel.

2.

   

Make

 

sure

 

that

 

the

 

reset

 

button

 

is

 

working

 

correctly:

 

a.

   

Disconnect

 

the

 

server

 

power

 

cords.

 

b.

   

Reconnect

 

the

 

power

 

cords.

 

c.

   

(Trained

 

service

 

technician

 

only)

 

Reseat

 

the

 

light

 

path

 

panel

 

cable,

 

and

 

then

 

repeat

 

steps

 

1a

 

and

 

1b.

 

v

   

(Trained

 

service

 

technician

 

only)

 

If

 

the

 

server

 

starts,

 

replace

 

the

 

light

 

path

 

panel.

 

v

   

If

 

the

 

server

 

does

 

not

 

start,

 

go

 

to

 

step

 

3.

3.

   

Make

 

sure

 

that:

 

v

   

The

 

power

 

cords

 

are

 

correctly

 

connected

 

to

 

the

 

server

 

and

 

to

 

a

 

working

 

electrical

 

outlet.

 

v

   

The

 

type

 

of

 

memory

 

that

 

is

 

installed

 

is

 

correct.

 

v

   

The

 

memory

 

card

 

is

 

fully

 

seated.

 

v

   

The

 

LEDs

 

on

 

the

 

power

 

supply

 

do

 

not

 

indicate

 

a

 

problem.

 

v

   

The

 

microprocessors

 

are

 

installed

 

in

 

the

 

correct

 

sequence.

4.

   

Reseat

 

the

 

following

 

components:

 

a.

   

Memory

 

card

 

b.

   

(Trained

 

service

 

technician

 

only)

 

Power

 

switch

 

connector

 

c.

   

(Trained

 

service

 

technician

 

only)

 

Power

 

backplane

 

d.

   

I/O

 

board

5.

   

Replace

 

the

 

components

 

listed

 

in

 

step

 

4

 

one

 

at

 

a

 

time,

 

in

 

the

 

order

 

shown,

 

restarting

 

the

 

server

 

each

 

time.

 

6.

   

If

 

you

 

just

 

installed

 

an

 

optional

 

device,

 

remove

 

it,

 

and

 

restart

 

the

 

server.

 

If

 

the

 

server

 

now

 

turns

 

on,

 

you

 

might

 

have

 

installed

 

more

 

devices

 

than

 

the

 

power

 

supply

 

supports.

 

 

70

 

IBM

 

System

 

x3950

 

Type

 

8872

 

and

 

System

 

x3950

 

E

 

Type

 

8874:

 

Installation

 

Guide

Содержание 88728AU - System x3950 - 8872 Datacenter High Availability

Страница 1: ...register and profile your server Go to the Web for instructions http www ibm com support No Yes Yes No Welcome Thank you for buying an IBM System x server This server contains information for setting...

Страница 2: ...that all optional devices you installed are on the ServerProven list at http www ibm com servers eserver serverproven compat us Is the server working correctly Is the problem solved Hardware or softwa...

Страница 3: ...IBM System x3950 Type 8872 and System x3950 E Type 8874 Installation Guide...

Страница 4: ...e 83 and the Warranty and Support Information document on the IBM Documentation CD Fourth Edition April 2006 Copyright International Business Machines Corporation 2006 All rights reserved US Governmen...

Страница 5: ...ols connectors LEDs and power 31 Front view 31 Rear view 33 Server power features 34 Turning on the server 35 Turning off the server 35 Chapter 4 Configuring the server 37 Using the ServerGuide Setup...

Страница 6: ...Before you call 81 Using the documentation 81 Getting help and information from the World Wide Web 82 Software service and support 82 Hardware service and support 82 Notices 83 Edition notice 83 Trade...

Страница 7: ...alleert eerst de veiligheidsvoorschriften Ennen kuin asennat t m n tuotteen lue turvaohjeet kohdasta Safety Information Avant d installer ce produit lisez les consignes de s curit Vor der Installation...

Страница 8: ...he caution or danger statement in the IBM Safety Information book For example if a caution statement begins with a number 1 translations for that caution statement appear in the IBM Safety Information...

Страница 9: ...quipment when there is evidence of fire water or structural damage v Disconnect the attached power cords telecommunications systems networks and modems before you open the device covers unless instruc...

Страница 10: ...ION When laser products such as CD ROMs DVD drives fiber optic devices or transmitters are installed note the following v Do not remove the covers Removing the covers of the laser product could result...

Страница 11: ...power control button on the device and the power switch on the power supply do not turn off the electrical current supplied to the device The device also might have more than one power cord To remove...

Страница 12: ...els are present inside any component that has this label attached There are no serviceable parts inside these components If you suspect a problem with one of these parts contact a service technician S...

Страница 13: ...cal updates might be available to provide additional information that is not included in the server documentation These updates are available from the IBM Web site Complete the following steps to chec...

Страница 14: ...00 MHz microprocessor v 32 MB of RAM v Adobe Acrobat Reader 3 0 or later or xpdf which comes with Linux operating systems Acrobat Reader software is included on the CD and you can install it when you...

Страница 15: ...of the most occurrences Click a document to view it and press Crtl F to use the Acrobat search function or Alt F to use the xpdf search function within the document Click Help for detailed informatio...

Страница 16: ...er and type of optional features installed and the power management optional features in use 3 These levels were measured in controlled acoustical environments according to the procedures specified by...

Страница 17: ...anagement controller v IBM EXA 32 Chipset with integrated memory and I O controller v Service processor support for Remote Supervisor Adapter II SlimLine v Light path diagnostics v Three Universal Ser...

Страница 18: ...points on hot swap components See the instructions for removing or installing a specific hot swap component for any additional procedures that you might have to perform before you remove or install t...

Страница 19: ...r of properly grounded electrical outlets for the server monitor and other devices v Back up all important data before you make changes to disk drives v Have a small flat blade screwdriver available v...

Страница 20: ...powered on might cause the server to halt which could result in the loss of data To avoid this potential problem always use an electrostatic discharge wrist strap or other grounding system when workin...

Страница 21: ...hile the device is still in its static protective package touch it to an unpainted metal part on the outside of the server for at least 2 seconds This drains static electricity from the package and fr...

Страница 22: ...er panel from one of the empty hot swap bays 3 Make sure that the tray handle is open then install the hard disk drive into the hot swap bay Notes 1 When you turn on the server check the hard disk dri...

Страница 23: ...v There must be at least one memory card with one pair of DIMMs installed for the server to operate v When you install additional DIMMs on a memory card be sure to install them in pairs All the DIMM...

Страница 24: ...ates that a DIMM or memory card has failed Memory Port Power LED When this LED is off it indicates that power is removed from the port and that you can remove the memory card to replace a failed memor...

Страница 25: ...e DIMM connectors facing up Attention To avoid breaking the DIMM retaining clips or damaging the DIMM connectors open and close the clips gently 5 Open the retaining clip on each end of the DIMM conne...

Страница 26: ...east one pair of DIMMs installed before being installed in the server You can hot add one memory card to each of the memory power buses provided your operating system supports that function At least o...

Страница 27: ...ver operates properly v Install the microprocessors in the order shown in the following illustration 1 2 3 4 To install an additional microprocessor complete the following steps 1 Read the safety info...

Страница 28: ...y a Open the microprocessor tray release latch Microprocessor tray lever Microprocessor tray lever Microprocessor tray retention latch both sides of tray Air baffle Microprocessor tray release latch b...

Страница 29: ...R O N T F R O N T 7 Remove the microprocessor baffle from a microprocessor socket and store it for future use If you remove a microprocessor you must install a microprocessor baffle to prevent the ser...

Страница 30: ...croprocessor connector Microprocessor 13 Close the microprocessor release lever to secure the microprocessor 14 Remove the heat sink from its package and remove the cover from the bottom of the heat s...

Страница 31: ...ting of the SAS cables is required v The blue handle that comes with the adapter is required to install the adapter v In multi node configurations only two nodes can contain a ServeRAID 8i adapter The...

Страница 32: ...adapter for instructions for setting jumpers or switches and for cabling Note Route adapter cables before you install the adapter 5 Install the adapter a Open the blue adapter guide by lifting the fro...

Страница 33: ...for complete rack installation and removal instructions 4 Connect the cables and power cords See Connecting the cables for more information Connecting the cables You must turn off the server see Turn...

Страница 34: ...r on LED USB connector Hard disk drive activity LED Information LED System error LED Locator LED Release latch Updating the server configuration When you start the server for the first time after you...

Страница 35: ...sor firmware go to http www ibm com support 2 Make sure that each System x3950 E node contains a minimum of one microprocessor and one memory card with one pair of DIMMs 3 Make sure that each micropro...

Страница 36: ...ted to port 2 on node 1 then connect the opposite end of the cable to port 2 of node 2 Next route the cable through the node 2 cable management arm 5 Route any remaining cables through the cable manag...

Страница 37: ...cable through the node 2 cable management arm Use a 2 3 m 7 6 foot SMP Expansion cable for this connection b Connect one end of an SMP Expansion cable to port 2 on node 2 then route the cable through...

Страница 38: ...e cable to port 3 of node 4 Next route the cable through the node 4 cable management arm 7 Route any remaining cables through the cable management arms 8 Secure the cables in the cable management arms...

Страница 39: ...m SMP Expansion cable 2 9 m SMP Expansion cable 3 Connect the SMP Expansion cables to node 1 a Connect one end of an SMP Expansion cable to port 1 on node 1 then route the cable through the node 1 ca...

Страница 40: ...de 3 then route the cable through the node 3 cable management arm Use a 2 3 m 7 6 foot SMP Expansion cable for this connection 6 Connect the SMP Expansion cables to node 4 a Locate the SMP Expansion c...

Страница 41: ...to port 3 on node 7 then route the cable through the node 7 cable management arm Use a 2 3 m 7 6 foot SMP Expansion cable for this connection 10 Connect the SMP Expansion cables to node 8 a Locate the...

Страница 42: ...30 IBM System x3950 Type 8872 and System x3950 E Type 8874 Installation Guide...

Страница 43: ...ED On some server models each hot swap hard disk drive has an activity LED When this LED is flashing it indicates that the drive is in use Operator information panel This panel contains controls and L...

Страница 44: ...t remotely by the system administrator to aid in visually locating the server In multi node configurations when this LED flashes during startup it indicates that the server is the primary node When th...

Страница 45: ...ctor When this LED is lit it indicates that there is an active connection on the Ethernet port USB 2 connector Connect a USB device to this connector System serial connector Connect a 9 pin serial dev...

Страница 46: ...ere is an active connection on the Ethernet port Power supply connector Connect the power cord to this connector SMP Expansion Port 1 link LED When this LED is lit it indicates that there is an active...

Страница 47: ...visor Adapter II SlimLine the systems management software can turn on the server v If your operating system supports the Wake on LAN feature the Wake on LAN feature can turn on the server Turning off...

Страница 48: ...hold the power control button for more than 4 seconds to turn off the server v If the server is installed in a static partition pressing the power control button on the primary node in the partition...

Страница 49: ...s and help you install the operating system For information about the supported operating system versions see the label on the CD If the ServerGuide Setup and Installation CD did not come with the ser...

Страница 50: ...ds to control the server power view system information and identify the server You can also save one or more commands as a text file and run the file as a script v Serial over LAN Establish a Serial o...

Страница 51: ...tion e Select Start Options then set Planar Ethernet PXE DHCP to one of the following settings v Disabled v Planar Ethernet 2 If you set Planar Ethernet PXE DHCP to Planar Ethernet 2 you must also set...

Страница 52: ...yS1 LILO configuration If you are using LILO complete the following steps 1 Modify the etc lilo conf file a Add the following text to the end of the first default linux line Monitor b Comment out the...

Страница 53: ...nstall boot boot b message boot message linear image boot vmlinuz 2 4 9 e 12smp label linux initrd boot initrd 2 4 9 e 12smp img read only root dev hda6 image boot vmlinuz 2 4 9 e 12 label linux up in...

Страница 54: ...ystem starts a LILO boot prompt is displayed instead of the graphical user interface Press Tab at this prompt to install all of the boot options that are listed To load the operating system in interac...

Страница 55: ...ed by anaconda Note that you do not have to rerun grub after making changes to this file NOTICE You have a boot partition This means that all kernel and initrd paths are relative to boot eg root hd0 0...

Страница 56: ...e 12 img You must restart the Linux operating system after completing these procedures for the changes to take effect and to enable SOL SUSE SLES 8 0 configuration Note This procedure is based on a de...

Страница 57: ...olor white blue black light gray default 0 timeout 8 title linux kernel hd0 1 boot vmlinuz root dev hda2 acpi oldboot vga 791 1 initrd hd0 1 boot initrd title floppy root chainloader 1 title failsafe...

Страница 58: ...down the boot entry ID for use in the next step 2 To enable the Microsoft Windows Emergency Management System EMS at a Windows command prompt type bootcfg EMS ON PORT COM1 BAUD 19200 ID boot_id where...

Страница 59: ...re for the changes to take effect and to enable SOL Installing the OSA SMBridge management utility program Complete the following steps to install the OSA SMBridge management utility program on a serv...

Страница 60: ...the following directories etc init d SMBridge etc smbridge cfg usr sbin smbridged var log smbridge License txt var log smbridge Readme txt The utility starts automatically when the server is started...

Страница 61: ...utility program provides the following remote management capabilities v CLI command line interface mode Use CLI mode to remotely perform power management and system identification control functions ov...

Страница 62: ...ser s Guide on the IBM Documentation CD If your server comes with an operating system installed such as Microsoft Windows 2000 Datacenter Server see the software documentation that comes with the serv...

Страница 63: ...e The code and firmware levels must be the same for all nodes v When you set up the nodes for scalable partitions for the first time you must first log on and configure the service processor in each n...

Страница 64: ...is step if you are cabling the configuration or changing the host name Use the Create Partition page to identify the nodes A page similar to the one in the following illustration is displayed a In the...

Страница 65: ...r attached to the primary node b In the On merge failure attempt partial merge field select if POST should attempt a partial merge if one error is detected during full merge You can view the merge sta...

Страница 66: ...scalable partition A page similar to the one in the following illustration is displayed Deleting a scalable partition To delete the scalable partition complete the following steps 1 Log in to the Rem...

Страница 67: ...shown in the drop down list follow the instructions on the Web page to download the latest version 2 Install the IBM Director program 3 Download and install any applicable updates or interim fixes for...

Страница 68: ...56 IBM System x3950 Type 8872 and System x3950 E Type 8874 Installation Guide...

Страница 69: ...oting tables These tables list problem symptoms and steps to correct the problems See Troubleshooting tables on page 60 for more information v Diagnostic programs and error messages The system diagnos...

Страница 70: ...or 60 minutes then reinstall the battery and restart the server 4 Replace the components listed in step 2 one at a time in the order shown restarting the server each time 163 Real time clock error 1 R...

Страница 71: ...essor x b Trained service technician only Microprocessor tray 00180xxx A PCI adapter has requested memory resources that are not available 1 Change the order of the adapters in the PCI X slots Make su...

Страница 72: ...service technician Symptom Action The CD or DVD drive is not recognized 1 Make sure that v The IDE channel to which the CD or DVD drive is attached primary or secondary is enabled in the Configuration...

Страница 73: ...ld replaceable units FRU v If an action step is preceded by Trained service technician only that step must be performed only by a trained service technician Symptom Action Not all drives are recognize...

Страница 74: ...the suggested actions in the order in which they are listed in the Action column until the problem is solved v See the parts listing in the Problem Determination and Service Guide to determine which...

Страница 75: ...b I O board 4 Replace the components listed in step 3 one at a time in the order shown restarting the server each time USB keyboard mouse or pointing device problems v Follow the suggested actions in...

Страница 76: ...work 1 Make sure that v The mouse or pointing device USB cable is securely connected to the server the keyboard and mouse or pointing device cables are not reversed and the device drivers are installe...

Страница 77: ...memory v If you changed the memory you updated the memory configuration in the Configuration Setup Utility program v All banks of memory are enabled The server might have automatically disabled a mem...

Страница 78: ...oprocessor has failed isolate the error by testing with one microprocessor at a time 6 Replace the following components one at a time in the order shown restarting the server each time a Trained servi...

Страница 79: ...at v The server is powered on v The monitor cables are connected correctly v The monitor is turned on and the brightness and contrast controls are adjusted correctly v Make sure that no beep codes sou...

Страница 80: ...reen images If this happens turn off the monitor Attention Moving a color monitor while it is turned on might cause screen discoloration Move the device and the monitor at least 305 mm 12 in apart and...

Страница 81: ...alled correctly v You have not loosened any other installed devices or cables v You updated the configuration information in the Configuration Setup Utility program Whenever memory or any other device...

Страница 82: ...or information panel power control button by using the force power on jumper if the server starts reseat the operator information panel If the problem remains replace the operator information panel 2...

Страница 83: ...operating system suspect the I O board The server unexpectedly shuts down and the LEDs on the operator information panel are not lit See the Problem Determination and Service Guide on the IBM Document...

Страница 84: ...st be performed only by a trained service technician Symptom Action The ServerGuide Setup and Installation CD will not start v Make sure that the server supports the ServerGuide program and has a star...

Страница 85: ...oftware for a description of the messages and suggested solutions to the problem 3 Contact your place of purchase of the software Universal Serial Bus USB port device problems v Follow the suggested a...

Страница 86: ...by a lit information LED or system error LED on the operator information panel on the front of the server If one or both of these LEDs are lit one or more LEDs elsewhere in the server might also be li...

Страница 87: ...he server which gives an overview of internal components that correspond to the LEDs on the light path diagnostics panel This information and the information in Light path diagnostics panel on page 77...

Страница 88: ...1 1 2 2 4 4 3 3 The following illustration shows the LEDs on the PCI X board PCI attention LEDs PCI power LEDs Power good LED Remind button You can use the remind button on the light path diagnostics...

Страница 89: ...following components a Power supply b Trained service technician only Power backplane 4 Remove optional devices 5 Replace the components listed in step 3 one at a time in the order shown restarting th...

Страница 90: ...ce technician only Failing microprocessor b Microprocessor tray 4 Replace the following components one at a time in the order shown restarting the server each time a Trained service technician only Fa...

Страница 91: ...ing system Note The PCI or MEM LED might also be lit 1 See the BMC log and the system error log 2 If the PCI LED is lit follow the instructions for that LED 3 If the MEM LED is lit follow the instruct...

Страница 92: ...Remove optional devices 4 Use 220 V ac instead of 110 V ac TEMP A system temperature or component has exceeded specifications Note A fan LED might also be lit 1 See the BMC log or the system error log...

Страница 93: ...device drivers or to submit a request for information You can solve many problems without outside assistance by following the troubleshooting procedures that IBM provides in the online help or in the...

Страница 94: ...For information about which products are supported by Support Line in your country or region see http www ibm com services sl products For more information about Support Line and other IBM services se...

Страница 95: ...ANY KIND EITHER EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF NON INFRINGEMENT MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE Some states do not allow disclaimer of e...

Страница 96: ...nd logos are trademarks of Sun Microsystems Inc in the United States other countries or both Adaptec and HostRAID are trademarks of Adaptec Inc in the United States other countries or both Linux is a...

Страница 97: ...e may differ from its retail version if available and may not include user manuals or all program functionality Product recycling and disposal This unit must be recycled or discarded according to appl...

Страница 98: ...E on the environment and human health due to the potential presence of hazardous substances in EEE For proper collection and treatment contact your local IBM representative Battery return program This...

Страница 99: ...may not cause harmful interference and 2 this device must accept any interference received including interference that may cause undesired operation Industry Canada Class A emission compliance stateme...

Страница 100: ...t Attention This is a Class A product In a domestic environment this product may cause radio interference in which case the user may be required to take adequate measures Taiwanese Class A warning sta...

Страница 101: ...installing 10 drives 5 DVD drive problems 60 E electrical input 5 electronic emission Class A notice 87 environment 5 error messages POST 58 error symptoms CD ROM drive DVD ROM drive 60 general 61 ha...

Страница 102: ...38 installing 47 P PCI BRD LED 80 pointing device problems 64 POST error messages 58 power LED 32 power problems 70 power requirement 5 power supply 5 power control button 31 power control button shie...

Страница 103: ...T temperature 5 trademarks 84 troubleshooting chart 60 turning off the server 35 turning on the server 35 U United States electronic emission Class A notice 87 United States FCC Class A notice 87 Univ...

Страница 104: ...92 IBM System x3950 Type 8872 and System x3950 E Type 8874 Installation Guide...

Страница 105: ......

Страница 106: ...Part Number 31R1855 Printed in USA 1P P N 31R1855...

Отзывы: