Chapter 5. Planning for Twisted Pair Cable Connections
45
Characteristic Impedance
Characteristic impedance, Z(0), must be measured under balanced conditions.
Measurements should be taken with an impedance measuring device and high quality
balun. For each frequency at which a measurement is made, three initial conditions
must be measured. These are:
•
Impedance with secondary balun terminated in a matched load
•
Impedance with secondary balun shorted
•
Impedance with secondary balun open.
Each measured impedance must then be converted to a reflection coefficient using
the following equation:
Where:
Z(m) measured
impedance
Z(b)
output impedance of balun.
The three reflection coefficients, p(match), p(short), and p(open) are then substituted
into the following equations to determine the scattering parameters of the test setup:
After the scattering parameters are calculated, the cable to be tested must be
connected to the secondary of the balun with the cable’s braided shield connected to
instrument earth. The cable is then tested under two conditions:
•
With the far end of the cable shorted
•
With the far end of the cable open.
Each result is then entered into the following equation as p(meas), along with the
scattering parameters for the particular frequency of measurement in order to
determine the actual reflection coefficient of the cable
p
Z m
( )
Z b
( )
–
Z m
( )
Z b
( )
+
----------------------------------
=
S11
p match
(
)
=
S22
2
p match
(
)
×
p short
(
)
–
p open
(
)
–
p short
(
)
p open
(
)
–
----------------------------------------------------------------------------------------------------
=
S12
S21
×
p match
(
)
p short
(
)
–
(
)
1
S22
+
(
)
×
=
p actual
(
)
p meas
(
)
S11
–
S22
p meas
(
)
S11
–
(
)
S12
S21
×
+
×
---------------------------------------------------------------------------------------------------------
=
Содержание 8265
Страница 1: ...8265 Nways ATM Switch Planning and Site Preparation Guide GA33 0460 0 IBM...
Страница 2: ......
Страница 3: ...8265 Nways ATM Switch Planning and Site Preparation Guide GA33 0460 01 IBM...
Страница 8: ...vi IBM 8265 Planning and Site Preparation Guide...
Страница 10: ...viii IBM 8265 Planning and Site Preparation Guide...
Страница 14: ...xii IBM 8265 Planning and Site Preparation Guide...
Страница 16: ...xiv IBM 8265 Planning and Site Preparation Guide...
Страница 26: ...10 IBM 8265 Planning and Site Preparation Guide...
Страница 38: ...22 IBM 8265 Planning and Site Preparation Guide...
Страница 70: ...54 IBM 8265 Planning and Site Preparation Guide...
Страница 118: ...102 IBM 8265 Planning and Site Preparation Guide...
Страница 121: ...Copyright IBM Corp 1994 1998 105 Appendix C Blank Planning Charts...
Страница 122: ...106 IBM 8265 Planning and Site Preparation Guide...
Страница 123: ...Appendix C Blank Planning Charts 107...
Страница 124: ...108 IBM 8265 Planning and Site Preparation Guide...
Страница 126: ...110 IBM 8265 Planning and Site Preparation Guide...
Страница 128: ...112 IBM 8265 Planning and Site Preparation Guide...
Страница 130: ...114 IBM 8265 Planning and Site Preparation Guide...
Страница 132: ...116 IBM 8265 Planning and Site Preparation Guide...
Страница 134: ...118 IBM 8265 Planning and Site Preparation Guide...
Страница 136: ...120 IBM 8265 Planning and Site Preparation Guide...
Страница 138: ...122 IBM 8265 Planning and Site Preparation Guide...
Страница 140: ...124 IBM 8265 Planning and Site Preparation Guide...
Страница 142: ...126 IBM 8265 Planning and Site Preparation Guide...
Страница 144: ...128 IBM 8265 Planning and Site Preparation Guide...
Страница 146: ...130 IBM 8265 Planning and Site Preparation Guide...
Страница 148: ...132 IBM 8265 Planning and Site Preparation Guide...
Страница 152: ...136 IBM 8265 Planning and Site Preparation Guide...
Страница 163: ......
Страница 164: ...IBM Printed in Denmark GA33 0460 01...