Figure 111. Installing the outer hose panel
Routing cables through the upper and lower air baffles
Bundle and route cables through the upper and lower air baffles.
About this task
For correct air flow in the rack when routing the cables through the upper and lower air baffles, group the
cables in small bundles and spread the cables evenly across the air baffle opening so there are no air
gaps. If the cables are tied in a single round bundle, hot air will escape from the open space in the air
baffle.
The following illustration shows the correct way to bundle and route cables through the upper air baffle.
154 Power Systems: Racks and rack features
Содержание 7014 T00
Страница 1: ...Power Systems Racks and rack features IBM ...
Страница 4: ...iv ...
Страница 14: ...xiv Power Systems Racks and rack features ...
Страница 149: ...Figure 96 Fastening the rack braces 5 Remove the four corner screws from the top cover Racks and rack features 135 ...
Страница 151: ...Figure 98 Removing the remaining screws 7 Lift off the top cover Racks and rack features 137 ...
Страница 167: ...Figure 110 Installing the inner hose panel Racks and rack features 153 ...
Страница 184: ...170 Power Systems Racks and rack features ...
Страница 195: ......
Страница 196: ...IBM ...