101
Determining Your Problem Category
Decide the category of your problem (A, B, C, or D) and follow the
instructions in the order shown in the category column.
A - New or changed installation with a solid problem.
B - New or changed installation with an intermittent problem.
C - Unchanged installation with a solid problem.
D - Unchanged installation with an intermittent problem.
Adding the 5500 Control Unit to Existing Twinax Cable Runs
When upgrading from an older twinax workstation controller to a newer
workstation controller (such as the IBM 5500 Control Unit), the performance
Figure 38: Problem Category Procedures
Categories
Description of Check Task
A
B
C
D
2
2
1
1
Ensure that terminals have no internal hardware failures or known
problems.
4
5
Check for a valid twinax installation cable length, routing, number of
connections.
3
3
3
3
Check cables for opens and shorts. Refer to “Step-by-Step Cable
Debugging” on page 105.
6
9
9
Check for Ground Potential Difference problems. Refer to “Step-by-
Step Cable Debugging” on page 105.
4
Check all cables for correct phase connections. Refer to “Step-by-Step
Cable Debugging” on page 105.
5
6
Check for the presence of AC noise. Refer to “Step-by-Step Cable
Debugging” on page 105.
6
8
Use TDR to analyze signal quality. Refer to “Advanced Time Domain
Relfectometry (TDR) Procedure” on page 113.
5
7
4
4
Ensure the 5500 twinax controller card is functioning correctly and
within specifications.
1
1
2
2
Visually check the entire twinax run for good wire connections. Refer
to“Step-by-Step Cable Debugging” on page 105.
8
7
Perform a ground loop impedance test on all the terminals. Disconnect
the twinax cabling for this test. Refer to “Step-by-Step Cable
Debugging” on page 105.
Содержание 5500-01E
Страница 1: ...S05J 4934 00 5500 Express IP Control Unit Planning Installation and Maintenance Guide...
Страница 2: ......
Страница 3: ...S05J 4934 00 5500 Express IP Control Unit Planning Installation and Maintenance Guide...
Страница 16: ...xvi Planning Installation and Maintenance Guide...
Страница 30: ...Chapter 1 Introducing the IBM 5500 Express IP Control Unit 30 Planning Installation and Maintenance Guide...
Страница 48: ...Chapter 2 Planning Your Installation 48 Planning Installation and Maintenance Guide...
Страница 54: ...Chapter 3 Installing the 5500 Express IP Control Unit 54 Planning Installation and Maintenance Guide...
Страница 68: ...Chapter 4 Configuring the 5500 Express IP Control Unit 68 Planning Installation and Maintenance Guide...
Страница 144: ...144 Planning Installation and Maintenance Guide...
Страница 145: ...Appendix A 145...
Страница 146: ...146 Planning Installation and Maintenance Guide...
Страница 147: ...Appendix A 147...
Страница 148: ...148 Planning Installation and Maintenance Guide...
Страница 149: ...Appendix A 149...
Страница 150: ...150 Planning Installation and Maintenance Guide...
Страница 151: ...Appendix A 151...
Страница 152: ...152 Planning Installation and Maintenance Guide...
Страница 153: ...Appendix A 153...
Страница 154: ...154 Planning Installation and Maintenance Guide...
Страница 155: ...Appendix A 155...
Страница 156: ...156 Planning Installation and Maintenance Guide...
Страница 157: ...Appendix A 157...
Страница 158: ...158 Planning Installation and Maintenance Guide...
Страница 164: ...164 Planning Installation and Maintenance...
Страница 184: ...Glossary 184...
Страница 188: ...Index 4...
Страница 191: ......