background image

 

 

© Copyright IBM Corporation 2019, 2020.               Customer Install Guide, 1G Switch  

 

 

IBM Cloud Pak for Data System

 

 

 

 

 

 

Customer Install Guide 
1G Switch 
3454-A3C 

 

Version 1.5 
 
 

 

 

Note 

Before using this information and the product it supports, read the information in 
“Safety notices” on page 5, “Notices” on page 45, the 

IBM Systems Safety Notices 

manual, G229-9054, and the 

IBM Environmental Notices and User Guide

, 03FP290. 

 

Содержание 3454-A3C

Страница 1: ...ystem Customer Install Guide 1G Switch 3454 A3C Version 1 5 Note Before using this information and the product it supports read the information in Safety notices on page 5 Notices on page 45 the IBM S...

Страница 2: ...itch 2 This edition applies to IBM Cloud Pak for Data System Components Revised February 2020 Copyright IBM Corporation 2019 2020 US Government Users Restricted Rights Use duplication or disclosure re...

Страница 3: ...irements 17 Rack Space 17 Location in the Rack 18 Package Contents 22 Contents 01FT693 Duct Kit 22 Contents 3454 A3C 1G Switch 22 1G Switch Stacked Installation Procedure 23 Installing the1G Switch in...

Страница 4: ...kerhedsforskrifterne f r du installerer dette produkt Lees voordat u dit product installeert eerst de veiligheidsvoorschriften Ennen kuin asennat t m n tuotteen lue turvaohjeet kohdasta Safety Informa...

Страница 5: ...Each caution and danger statement in this documentation is labeled with a number This number is used to cross reference an English language caution or danger statement with translated versions of the...

Страница 6: ...grounded electrical outlet Ensure that the outlet supplies proper voltage and phase rotation according to the system rating plate o For racks with a DC power distribution panel PDP connect the custom...

Страница 7: ...tructed otherwise 7 Attach all cables to the devices 8 Attach the signal cables to the connectors 9 For AC power attach the power cords to the outlets 10 For racks with a DC power distribution panel P...

Страница 8: ...with IEC 60825 as a class 1 laser product Consult the label on each part for laser certification numbers and approval information CAUTION Data processing environments can contain equipment transmittin...

Страница 9: ...hem to stabilize your body position for example when working from a ladder Each rack cabinet might have more than one power cord o For AC powered racks be sure to disconnect all power cords in the rac...

Страница 10: ...tall Guide 1G Switch 10 CAUTION Use safe practices when lifting L001 DANGER Hazardous voltage current or energy levels are present inside any component that has this label attached Do not open any cov...

Страница 11: ...Do not place objects on top of rack mounted devices In addition do not lean on rack mounted devices and do not use them to stabilize your body position for example when working from a ladder L002 CAU...

Страница 12: ...ll hazardous voltages disconnect all power cords and power cables L003 Product Safety Notifications Japan English translation If this product comes with power cords such cords should be used exclusive...

Страница 13: ...tribution Unit PDU 3454 FCE FCG 13 03GJ009 Customer Install Guide 1U Chassis 3455 XXX 14 29R2409_Important_Notices 15 G229 9054 IBM Systems Safety Notices translations Pub These documents contain impo...

Страница 14: ...oud Pak for Data System PDUs and line cords or by customer supplied PDUs meeting the power requirements of the Cloud Pak for Data System components If this is a customer install IBM installation servi...

Страница 15: ...ee Notes 1 2 Table 1 Width Depth Height EIA units Weight Amperage Max Power Max Cooling Max 440 mm 17 3 in 350 mm 16 1 in 45 mm 1 70 in 1 5 4 kg 11 9 lb 1 5 amps 300 watts 1000 BTU Hr Notes 1 The powe...

Страница 16: ...50F 95F 1 5 5C 45C 41F 113F Humidity 25 60 noncondensing 2 4 20 80 noncondensing 2 4 8 85 4 Maximum Operating Altitude 3050m 10 000 ft 1 Shipping Temperature 40C 60C 40F 140F 3 4 Shipping relative hum...

Страница 17: ...ormation on the space requirements for the rack which will house the Cloud Pak for Data System Components Rack Space Ensure that the rack in which you plan to install the system meets the space requir...

Страница 18: ...nd the lengths of the supplied cables are not exceeded Figure 2 Front view of installed Cloud Pak component locations 42 4U Blank Panel 41 40 39 38 2U Blank Panel 37 36 2U Blank Panel 35 34 PDU 2 Righ...

Страница 19: ...lled above the PDUs at locations U35 U36 Spine switches should be installed in rack 3 at U30 and U31 per figure 4 The hub switch is a 1G Cloud Pak for Data System management switch at U32 that is used...

Страница 20: ...G Switch 27 1U Blank Panel 26 25G Switch marked expansion 25 25G Switch 24 1U Blank Panel 23 1U Blank Panel 22 1U Blank Panel 21 1U Blank Panel 20 1U Blank Panel 19 1U Blank Panel 18 1U Blank Panel 17...

Страница 21: ...020 Customer Install Guide 1G Switch 21 Figure 4 Front view of installed Cloud Pak component locations with hub and spine switches Placement of the hub and spine switches is typicaly in rack 3 Hub Swi...

Страница 22: ...epresentative Contents 01FT693 Duct Kit Choose one nut type according to the rack that you are installing the system in square or round rail holes Contents 3454 A3C 1G Switch Switch Power cords 2 Cabl...

Страница 23: ...R PORTS Blocked cooling access will adversely affect the performance of your Cloud Pak for Data System and may void your warranty This Stacked procedure shows the installer how to install two identica...

Страница 24: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 24...

Страница 25: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 25...

Страница 26: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 26...

Страница 27: ...r by unscrewing the four screws on each side of the duct rail STEP 8 Convert side rail from storage position to overlap position by removing the 3 screws on the side blocking plate and reinstalling th...

Страница 28: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 28 Reference shudders in dual switch configuration STEP 9...

Страница 29: ...most screw on the top switch blade This mounting location will place the cable mounting bar directly between the two switches STEP 10 INSTALL CABLE MANAGEMENT BAR TO TOP SWITCH USING UPPER TWO SCREWS...

Страница 30: ...the top and the bottom vented panel slides in with the floor towards the bottom This creates a sealed 2U duct opening L003 DANGER Multiple power cords The product might be equipped with multiple AC po...

Страница 31: ...OT AIR FROM RECIRCULATING TO THE FRONT OF THE RACK AND INTO THE COLD AIR INLETS DO NOT BLOCK ANY INLET OR EXHAUST DUCTS VENTS OR PORTS KEEP ALL POWER CORDS SIGNAL CABLES AND TRANSCEIVERS WITH THE INST...

Страница 32: ...he rear of the rack The switch includes a fresh air duct kit that directs cold air from the front of the rack to the power supply side inlets DO NOT BLOCK ANY INLET OR EXHAUST DUCTS VENTS OR PORTS Blo...

Страница 33: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 33...

Страница 34: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 34...

Страница 35: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 35...

Страница 36: ...screw on the switch blade F This mounting location will place the cable mounting bar directly at the bottom of the switch STEP 10 INSTALL CABLE MANAGEMENT BAR TO TOP SWITCH USING UPPER TWO SCREWS Step...

Страница 37: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 37...

Страница 38: ...Customer Install Guide 1G Switch 38 L003 DANGER Multiple power cords The product might be equipped with multiple AC power cords or multiple DC power cables To remove all hazardous voltages disconnect...

Страница 39: ...39 ALL OPEN RACK BAYS REQUIRE FILLERS TO PREVENT HOT AIR FROM RECIRCULATING TO THE FRONT OF THE RACK AND INTO THE COLD AIR INLETS KEEP ALL POWER CORDS SIGNAL CABLES AND TRANSCEIVERS WITH THE INSTALLED...

Страница 40: ...in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense Properly shielded and grounded cables and connecto...

Страница 41: ...ectromagnetic compatibility IBM cannot accept responsibility for any failure to satisfy the protection requirements resulting from a non recommended modification of the product including the fitting o...

Страница 42: ...tatement applies to products greater than 20 A single phase JIS C 61000 3 2 This statement applies to products greater than 20 A per phase three phase JIS C 61000 3 2 Japan Voluntary Control Council f...

Страница 43: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 43 Russia Notice Taiwan Notice IBM Taiwan Contact Information...

Страница 44: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 44 Regulatory and Compliance...

Страница 45: ...irector of Licensing IBM Corporation North Castle Drive Armonk NY 10504 1785 U S A For license inquiries regarding double byte DBCS information contact the IBM Intellectual Property Department in your...

Страница 46: ...t IBM International Program License Agreement or any equivalent agreement between us Any performance data contained herein was determined in a controlled environment Therefore the results obtained in...

Страница 47: ...ta and reports used in daily business operations To illustrate them as completely as possible the examples include the names of individuals companies brands and products All of these names are fictiti...

Страница 48: ...ams conforming to the application programming interface for the operating platform for which the sample programs are written These examples have not been thoroughly tested under all conditions IBM the...

Страница 49: ...ther countries Microsoft Windows Windows NT and the Windows logo are trademarks of Microsoft Corporation in the United States other countries or both Linux is a registered trademark of Linus Torvalds...

Страница 50: ...nical questions and information about products and prices please contact your IBM branch office your IBM business partner or your authorized remarketer When you send comments to IBM you grant IBM a no...

Страница 51: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 51...

Страница 52: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 52 Part Number 02JE404 Printed in Mexico...

Отзывы: