
Installation & Commissioning Report
Model Number _____________________ Serial Number ______________________________
Date of Installation ________ Address of installation __________________________________
User contact information ________________________________________________________
Installer Information (Company & Address)_________________________________________
Phone/Fax/E-mail _____________________________________________________________
Circuit Breaker # ____ Labeled?
□
Power supply wire gauge _____
□
Leak testing completed
□
System Cleaned and Flushed (type of cleaner used) ________________________________
□
System Filled (type/concentration of any glycol/chemicals used) _____________________
□
Air purge completed
□
Relief Valve correctly installed and piped Relief valve “try lever” test performed
□
Owner advised and instructed in the safe operation and maintenance of the hydronic heat pump
and system.
□
Information regarding the appliance and installation received and left with owner
Commissioning has been completed as listed on this report - Installer's Signature _____________
63
Installation & Commissioning Report
Содержание HPX 3
Страница 10: ...3 3 Capacities and COPs 10 Section Specifications...
Страница 11: ...Table 2 HPX 3 Capacity and COP tables 11 3 3 Capacities and COPs...
Страница 12: ...12 Section Specifications...
Страница 13: ...Table 3 HPX 5 Capacity and COP tables 13 3 3 Capacities and COPs...
Страница 14: ...Intentionally left empty...
Страница 20: ...Intentionally left empty...
Страница 48: ...Intentionally left empty...
Страница 50: ...Intentionally left empty...
Страница 64: ...Intentionally left empty...
Страница 65: ...65 13 0 Appendices Wiring diagrams Figure 19 HPX 3 internal wiring diagram...
Страница 66: ...Figure 20 HPX 5 internal wiring diagram 66 Section Appendices...