INSTALLATION AND OPERATION INSTRUCTIONS
2-6
DC SERIES BOILERS / WATER HEATERS
DC 15-95, DC 15-96, DC 20-125, DC 33-160
SEQUENCE OF OPERATION
The boiler / water heater will operate in a similar way for both a space heating
and a domestic hot water call for heat. When the boiler / water heater is powered
up the controller enters a self diagnostic mode and displays 2 in the Service
Display.
The Sequence of Operation is as follows:
1.
The boiler / water heater receives a call for heat from closing terminals X4.6
and X4.7 (24 volts). The boiler / water heater can also receive a call from
Domestic Hot Water heating from the internal flow sensor, or from a 10KΩ
sensor or aquastat (X4.9 and X4.10 in 24V terminal).
2.
The boiler / water heater does a safety check and energizes the fan for a pre-
purge (Service Display = 3)
3.
Once the 5 second pre-purge is compete, the boiler / water heater enters a 5
second trial for ignition (Service Display = 4). If the boiler / water heater fails
to ignite, the boiler / water heater will compete a 5 second inter-purge then
another 5 second trial for ignition. This is repeated 4 times before a hard lock
out occurs. The Reset button
must be pressed to reset the controller
and allow for another attempt.
4.
Once the burner is lit and flame has been proven the boiler / water heater
operates as it is programmed (Service Display = 5 for Space Heating or 6 for
Domestic Hot Water)
5.
If the boiler / water heater reaches its target temperature and there is still a
call for heat or hot water. (Service Display = 1)
6.
After the call for heat is satisfied, the boiler / water heater pump will operate
for an adjustable amount of time (Service Display = 0)
7.
If the burner is on to maintain the heat exchanger temperature for DHW
Comfort mode or for Freeze Protection mode (Service Display = 7)
8.
If the burner is on for Frost Protection (Service Display = 9)
MAIN
DISPLAY
SERVICE
DISPLAY
DESCRIPTION
[Pressure
e.g., 14 P]
-
The boiler / water heater is OFF. Press the On/Off
button to turn on the boiler
(blank)
(blank)
No Call for Heat - Standby
XXX
0
Boiler / water heater pump running – pump post purge
XXX
1
Boiler / water heater water temperature reached target –
boiler / water heater pump is energized, call for heat still
present
XXX
2
Self-test – When power is applied to the boiler / water
heater the controller enters a self diagnostic mode for 5
seconds
XXX
3
Fan Pre-purge , Inter-purge and Post-purge
XXX
4
Trial for Ignition and Flame Proving
XXX
5
Heating – Space Heating
XXX
6
Heating – DHW
XXX
7
Burner on for Comfort mode or Freeze Protection mode
Table 9: Operating Display and Service Display Codes.
2.7
NOTE
The boiler / water heater
is equipped with a Frost
Protection feature. This
feature will operate the boiler
pump and the burner to help
protect the boiler / water
heater from freezing. If the
boiler / water heater is in
a hard lock-out condition
the burner will not operate,
however the boiler / water
heater pump will operate.
IBC is not responsible for
damages to the boiler, and/
or related components,
nor property damages that
may result from freezing
conditions.
Содержание DC 15-95
Страница 78: ...NOTES ...
Страница 79: ...SERVICE RECORD DATE LICENSED CONTRACTOR DESCRIPTION OF WORK DONE ...