![IAME REEDSTER 125cc Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/iame/reedster-125cc/reedster-125cc_assembly-instructions-and-user-manual_3201513022.webp)
MAN-051 ING
20
2.9.15
DRILL THE FAIRING AND FASTEN
THE HARNESS WITH PLASTIC CLAMPS (SEE
FIG.35).
2.9.16
DRILL THE FAIRING (CLOSE TO THE
BATTERY) AND PLACE THE FUSE-HOLDER BY
MEANS OF THE 2 HOOKS OF THE JUNCTION
BLOCK (SEE FIG.36).
2.9.17
PLACE THE BATTERY TERMINALS OF
THE HARNESS UNDER THE STRAP (SEE FIG.
37).
SUGGESTION:
NEVER CONNECT THE BATTERY UNTIL YOU
ARE READY TO START THE ENGINE.
SEAL THE BATTERY TERMINALS WITH
PLASTIC TAPE TO AVOID THAT EVENTUAL
VIBRATIONS MIGHT DISCONNECT THE
TERMINALS.
2.9.18
SCREW THE SPARK CAP ON THE H.T.
COIL CABLE (SEE FIG. 38).
Fig.35
Fig.36
Fig.37
Fig.38