background image

DL6WU 9 m VE7BQH 8.04 ÷ 7.82 m

 

E

 

+

 

+

 

Combine the boom respecting the letters placed at the ends of each section

 

Insert the screws M5x35 mm washer and nut into the junction points 

-

  A

 

and 

-

  D

 then insert the screws M5x40 mm washer and nut, junction points 

-

 B

 and 

 C

 

Kombinieren Sie den Boom und achten Sie dabei auf die Buchstaben am 

Ende jeder Sektion

 

Fügen Sie die Schrauben M5x35 mm Unterlegscheibe und Mutter in die Ver-

bindungsstellen 

-

  A

 und 

-

  D

, und die Schrauben M5x40 mm Unterleg-

scheibe und Mutter in den Knotenpunkte 

-

 B

 und 

 C

 

Unire il boom rispettando le lettere poste alle estremità di ogni singola sezio-

ne

 

Inserire le viti M5x35 mm rondella e dado, nei punti di giunzione 

-

  A

 e 

-

 

D

, inserire le viti M5x40 mm rondella e dado, nei punti di giunzione 

-

  B

 e 

-

 C

 

Combinez le boom sur les lettres placées aux extrémités de chaque section

 

Insérez les vis M5x35 mm rondelle et un écrou dans les points de jonction 

-

  A

 et 

  D

 puis, insérer les vis M5x40 mm rondelle et un écrou, les points 

de jonction 

-

 B

 et 

 C

 

Fixez la plaque de montage entre la flèche et le mât 

PIA40JXX

 entre les 

éléments 

 4

 

Montieren  Sie  die  Montageplatte  zwischen  Ausleger  und  Mast 

PIA40JXX

 

zwischen den Elementen 

 4

 

Attach  the  mounting  plate  between  boom  and  mast 

PIA40JXX

  between 

elements 

 4

 

Montare la piastra di fissaggio tra boom e mast 

PIA40JXX

 dietro l’elemen-

to 

3

 

In order to obtain the best results in coupling the antennas, we warmly recommend an adequate antenna stacking calculation which 

would allow the best forward gain together with low side lobes. The stacking distance may be calculated with the following formula 

from Güenter Hoch DL6WU

 

On  the basis  of further studies  conducted by  Lionel VE7BQH over  the  antenna  stacking  argument,  a reduction of 5÷10%  may  be 

introduced on stacking distances without noticing significant overall worsening of the characteristics. Do respect the driven element 

supplying simmetry to allow anti

-

phase coupling

 

                

 

 

 

   

5982               5982

 

Plane E

 =  38.8°    =  ———————  =  ————  

 

8.46 m 

(with VE7BQH from 

8.04 m

 to 

7.62 m

)

 

                     

 

 

 

      2 * sin (41.4 / 2)       0.7069 

  

        

 

 

              5982 

          5982 

Plane H

 =  43.6°  =  ———————  =  ————  

 

7.46 m 

(with VE7BQH from 

7.07 m

 to 

6.7 m

)

 

                 

 

 

 

    2 * sin (47.4 / 2)        0.8039

 

DL6WU 

8.05 m

 

 

VE7BQH

 

7.07 ÷ 6.7 m

 

+

 

+

 

H

 

Stacking

 

La IØJXX si riserva il diritto, senza alcun preavviso, di modificare

 

Made in Italy

 

      L 

d  = 

———————

 

        2 * sin ( 

/ 2 )

 

 

Insertion d'éléments comme indiqué sur la figure (voir la figure) spatial et 

centré  avec  les  éléments  placer  sous  le  boom,  comme  ça  on  peut  éviter 

cumulus d’eau, de glace et de neige 

 

Fügen Sie die Elemente räumig und zentriert hinein und fügen Sie sie mit 

den  Elementen  unter  dem  Boom  zusammen,  wie  in  der  Abbildung  darge-

stellt  (siehe  Abbildung).  Das  sollte  die  Anhäufung  von  Wasser,  Eis  und 

Schnee verhindern.

 

Insert  elements  as  shown  in  the  figure  spaced  apart  and  balanced  (as 

shown in the figure) with the elements standing under the boom, in order 

to avoid ponding, ice accretion and snowdrift

 

Inserire  gli  elementi  come  riportato  in  foto  e  spaziati  centro

-

centro  (vedi 

figura),  con  gli  elementi  sotto  al  boom,  in  modo  da  evitare  l’accumulo  di 

acqua, ghiaccio e neve

 

Installez les dipôles comme représenter 

 

Verbinden Sie die Dipole wie abgebildet 

 

Match the dipoles as shown in the figure

 

Montare il dipolo come indicato in figura

 

Отзывы: