![i-PRO WV-U35401-F2L Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/i-pro/wv-u35401-f2l/wv-u35401-f2l_installation-manual_4462191007.webp)
Standard accessories
Important Safety Instructions ............................. 1 pc.
RJ45 waterproof
connector cover
・
cap 1×
Waterproof rubber A
(Black) 1×
Waterproof rubber B
(White) 1×
Bit 1× (Hex wrench,
screw size 6.35 mm
{1/4 inches} T10)
Template 1×
Other items that are needed (not included)
Mounting screws
Installation method
Recommended screw
*1
Minimum pull-out
strength
*2
Directly mount the camera onto the installation surface M4 × 16 mm {5/8
inches}*
3
× 3 pcs.
196 N {44
lbf}
Mount the camera to a two-gangbox/junction box.
M4 × 16 mm {5/8
inches}*
3
× 2 pcs.
Mount the camera using the exclusively designed
mount bracket.
Refer to the operating instructions of each
bracket.
*1 Select screws according to the material of the location that the camera will be mounted to. In this
case, wood screws and nails should not be used.
*2 This value indicates the minimum pull-out strength required value per screw. For information about the
minimum pull-out strength, refer to our technical information website <Control No.: C0120>.
*3 The screw length is an example when installing the camera on a robust installation surface with a
thickness of 20 mm {25/32 inches} or more.
Ethernet cable with RJ45 plug (category 5e or better, straight, all 4 pairs (8 pins), less than 100m
{328 feet})
7
Содержание WV-U35401-F2L
Страница 16: ...Step 7 Attach the enclosure Recommended tightening torque 0 8 N m 0 59 lbf ft 16...
Страница 32: ...tape 7 Fixez le coffret ext rieur Couple de serrage recommand 0 8 N m 0 59 lbf ft 32...
Страница 43: ...Schritt 3 Wasserdichtes Gummi A D 5 mm 7 mm D Wasserdichtes Gummi B D 7 mm 8 5 mm 43...
Страница 48: ...Schritt 7 Das Geh use anbringen Empfohlenes Anzugsmoment 0 8 N m 48...
Страница 59: ...Passaggio 3 Guarnizione impermeabile A D 5 mm 7 mm D Guarnizione impermeabile B D 7 mm 8 5 mm 59...
Страница 64: ...Passaggio 7 Installazione dell involucro Coppia di torsione dell avvitamento consigliata 0 8 N m 64...
Страница 75: ...Paso 3 Goma impermeable A D 5 mm 7 mm D Goma impermeable B D 7 mm 8 5 mm 75...
Страница 80: ...Paso 7 Monte el alojamiento Torsi n de apriete recomendada 0 8 N m 80...
Страница 84: ...i PRO Co Ltd C0109 C0121 100 V 1 m 84...
Страница 87: ...User manual Indicator RJ45 microSD INITIAL SET ACT LINK SD ERROR 87...
Страница 88: ...1 microSD Format User manual microSD i PRO 88...
Страница 89: ...2 96 mm 36 36 0 5 mm 23 40 mm 25 4 mm 89...
Страница 90: ...3 A D 5 mm 7 mm D B D 7 mm 8 5 mm 90...
Страница 91: ...4 196 N 1 3 M4 Image rotation User manual 180 3 M4 196 N 1 91...
Страница 92: ...196 N 1 2 M4 83 5 mm M4 2 WV QAT502 W 196 N 1 0 69 N m M4 4 WV QAT502 W WV QAT502 W 92...
Страница 93: ...5 PoE IP Setting Software C0123 i PRO Configuration Tool iCT C0133 93...
Страница 94: ...6 PAN 45 TILT 0 90 YAW 90 TILT 94...
Страница 95: ...7 0 8 N m 95...